  63   Sat Apr 2 05:08:00 2022 KristianGeneralMorning shiftI see no updates in the log. Is the morning
shift taking place?
  
  97   Tue Apr 5 13:24:40 2022 KristianDetectorsPMT CuHV cable was in wrong channel in power supply.
Now it is back to the correct position. Checked
connection at the PMT.
  
  98   Tue Apr 5 13:28:06 2022 KristianDAQSpikes in PMT signalOccasionally, we noticed a spike in the PMT
signal. No ions in the ring and at PMT Cu
was not even supplied with HV. Has to be
 spike.png 
  99   Tue Apr 5 14:51:51 2022 KristianDAQdark countsWe shielded the PMTs, i.e., the N2 tube, which
improved the Cu PMT background rate.
  
  160   Fri Apr 8 11:16:57 2022 KristianLaserWavemeterWe changed the fiber to the wavemeter. The
third fiber worked best and we could operate
the WM at low exposure times, i.e., below
 Wavemeter.PNGWavemeter2.PNG 
  163   Fri Apr 8 14:14:28 2022 KristianDAQDelay of bunch RFThe bunch HF is now fed through a delay to
shift the stop trigger relative to the PMT
signal. The delay generator is placed directly
  
  182   Sat Apr 9 06:42:23 2022 KristianLaserLaser step sizeWe changed the laser step size to 0.002 nm
which corresponds to 5.75 GHz.
  
  209   Mon Apr 11 12:50:22 2022 KristianAcceleratorTh lifetimeWe used the counter to measure the lifetime.
During the 30 min scan time dropped only
slowly. 
 ThLifetime.JPG 
  213   Mon Apr 11 22:14:51 2022 Konstantin, SarperLaserChanging of the wavelength rangeIt is planned to change the scan range of
the laser wavelength from 322.41 - 322.0
nm to 322.01 - 321.6 nm @ 4 a.m. 
  
  143   Thu Apr 7 19:13:26 2022 Konstantin, PatrickCalibrationHow to find the correct laser positionIn order to achieve the correct laser ion
beam superposition one needs to do the following
steps:
  
  82   Sun Apr 3 18:41:11 2022 Konstantin and RodolfoLaserBeam Position StabilizationWe (Konstantin and I) have optimized the TEM
"laser-beam position stabilization".
 MRC_Konfiguration_MitMainAmp_03-04-2022.pngMRC-ControllerSetting_03-04-2022.jpgFG_SettingsMRC_03-04-2022.jpgTriggerSignals_f_MRC_04-04-2022.PNG 
  40   Thu Mar 31 11:49:54 2022 KonstantinDetectorsHV-Supply of particle detectors We cross-checked the cabeling of the particle
detectors north and south. Particle detector
south is connected to channel [B]HV5[/B]
  
  42   Thu Mar 31 15:53:50 2022 KonstantinDetectorsControl software for XUV and copper mirror detector> Attached you find a manual for the software
used to control the movement of the XUV detector
and the copper mirror detector. 
 XUV_Cu_GUI.png 
  43   Thu Mar 31 17:56:32 2022 KonstantinDAQPhotodiode test signalWe used a signal generator to provide a 4MHz
dummy-RF signal. This was divided by a factor
of 2 for laser-"bunch" synchronization and
 Timing_Photodiodes.png 
  58   Fri Apr 1 22:01:14 2022 KonstantinDetectorsPMT operating voltages> During the testing of the PMTs the following
operating voltages were applied:
  
  83   Sun Apr 3 18:52:30 2022 KonstantinCalibrationLaser ion beam overlapWe measured vertical and horizontal ion beam
positions. Unfortunately, the horizontal
scraper positions can not be manipulated
  
  142   Thu Apr 7 16:50:22 2022 KonstantinCalibrationSpacial laser-ion overlapLaser-ion-beam overlap was achieved after
measuring the ion beam positions (compare
[URL=https://elog.gsi.de/esr/E142/83]Entry
  
  169   Fri Apr 8 17:44:25 2022 KonstantinCalibrationFinal TimingWe measured the timing for the laser bunch
synchronization. A summary is given below.
  
  170   Fri Apr 8 17:57:45 2022 KonstantinDAQLaser scanning

[TABLE border="1"]
 Artifacts_in_PMT_MiddleAndNorth.png 
  221   Tue Apr 12 17:01:30 2022 KonstantinDetectorsVoltage PMT NorthVoltage of PMT North has been increased from
2500 V to 2600 V. Additionally the threshold
was adapted from 25 mV to 12 mV.
  