HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay, Page 1 of 12  Not logged in ELOG logo
Entry  Tue May 4 17:54:08 2021, Helmut Weick, Simulations, updated LISE file E143_TEline-ESR-2.lpp
This file really has the optics like used in the last ESR experiments.
Now the transmission is also a little bit better.
Entry  Fri May 7 17:12:52 2021, Kanika, Sergey, Yuri, Wolfram, Michael, Shahab, Runs, trigger time back to 50% 
changed trigger time back to 50%

last file with 1% trigger: 
Entry  Mon Jun 28 18:32:49 2021, Ruijiu, Shahab, DAQ, trigger signal connected to NTCAP and analyzers tri.jpg
 
Entry  Wed Jun 30 00:12:55 2021, Rui-Jiu Chen, Analysis, the ID of 72Ge setting plot_242.5_246.5.pngplot_242.5_246.5.rootoutput_127.tofplot_242.5_246.5.pdf
 
Entry  Thu Jul 1 15:25:42 2021, Rui-Jiu Chen, DAQ, template of NTCAP shift 
Please check following two parameters every two hours into make sure the NTCAP is running well: 
1. The latest recorded tdms files:
 p:\E143\sc\**\**
Entry  Sun May 9 21:29:26 2021, Helmut, Wolfram, Yuri, Accelerator, target TE3UF shift 
We see a very strong line at the left end of spectrum, stronger than all other lines.
When we shift the target TE3UF_H from -35mm to -37mm it gete weaker, but -37mm is the end of drive.
In the other direction it becomes worse. At -25mm completely new peaks.
Entry  Sat May 8 22:06:36 2021, Michael, Ruijiu, Helmut, Yuri, Wolfram, Sergey, Shahab, Runs, stopped data taking with the high resolution 
last file names with this setting:

245: 2021.05.08.20.42.03.743.tiq
Entry  Sun May 9 18:41:33 2021, Rodostina, Oliver, Wolfram, Helmut, Yuri, Shahab, Runs, stopped data taking for energy change 
last recorded filename:

E143-245MHz-2021.05.09.17.38.44.410.tiq
Entry  Fri Jul 2 19:57:12 2021, Shahab, Yuri, Wolfram, Liliana, Runs, stop DAQ  
At 19:56 the DAQ is stopped. 
The plan is to go back to the setting for Se. 
Last files for the Br setting:
Entry  Fri May 7 22:48:33 2021, Chris, General, still running... E143-245MHz-2021.05.07.21.46.10.889.tiq.pngZoom_screenshot.PNG
In anticipation of the imminent shift change, a snapshot of how things look.
Entry  Wed Jun 30 02:12:46 2021, Shahab, Runs, still no beam in ESR: quadrupole magnets are down 
still no beam in ESR: quadrupole magnets are down
Entry  Fri May 7 03:33:11 2021, Liliana, Akash, Wolfram, Helmut, Shahab, General, status 
At the moment we see a second peak to the left of each intense line. 
The distance between the main peak and the shadow is roughly the same for each peak.
This hints to a sharp fall in the isochronicity curve.
Entry  Fri Jul 2 17:31:04 2021, Liliana, General, status 
at 17:20 intensity was suddenly reduced. 
Operators checked. Intensity was a bit low and fluctuating for a while (8e8 to 1e9)
Intensity (1.5e9) was recovered at 18:16
Entry  Sat May 8 21:10:24 2021, Michael, Ruijiu, Helmut, Yuri, Wolfram, Sergey, Shahab, Runs, started data taking with high resolution E143-245MHz-2021.05.08.20.17.39.000.tiq.pngE143-410MHz-2021.05.08.21.18.51.447.tiq.png
after optimizing the scrapers we have reached the highest possible resolution in the isochronous mode.

starting data taking with this new settings.
Entry  Tue Jun 29 20:40:55 2021, Rui-Jiu Chen, DAQ, start NTCAP 
Carrier Frequency:245MHz.
IQ rate 20MSamples/s
Reference level:-90 dBm
Entry  Thu Jul 1 23:07:47 2021, IK, KK, Runs, source 

The change of the source happens now
Entry  Thu Jul 1 21:35:32 2021, Shahab, Runs, some pics after 15dB amplification on 410 asd.png821.png
 
Entry  Wed Jun 30 13:57:14 2021, Yuri, Sergey, Accelerator, sextupoles + scraper positions photo_2021-06-30_14-09-08.jpgphoto_2021-06-30_14-02-25.jpg
After setting up on 70Se
Sextupoles were adjusted to optimize the resolution of the 70Se peak. Set values are in the ESR logbook.
The SIS energy was shifted up to increase the number of 70Se.
Entry  Thu Jul 1 18:07:10 2021, Shahab, Runs, settings of the analyzers after changing the trigger position asd.jpgasd2.jpg
 
Entry  Sun May 9 01:19:47 2021, Helmut, Sergey, Accelerator, scraper optmisation for 72Ge IMG_20210508_210509.jpg
To improve the isochronicity still in the 72Ge setting sextupoles and scrapers wer varies successfully.

1. E02DS_H -130 / 130mm  - wide rect. peak
ELOG V3.1.5-fc6679b