HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay, Page 10 of 12  Not logged in ELOG logo
   +  Reply  Fri Jul 2 06:52:11 2021, The remote Canadian eager beavers (Iris and Guy), Analysis, Summary of spectra 0:00-6:00 (410 MHz) July2-4-0-6h-410MHz_AllSpectra_0.025s_steps_start_1.04s.png
Entry  Fri Jul 2 07:31:44 2021, The remote Canadian eager beavers (Iris and Guy), Analysis, 00h to 05h Summed Spectra 245MHz-07.02.00-05h-sum_10ms.png245MHz-07.02.00-05h-sum_10ms_zoom.png410MHz-07.02.00-05h-sum_10ms.png410MHz-07.02.00-05h-sum_10ms_zoom.png
Entry  Fri Jul 2 12:42:54 2021, Gregor, Analysis, Spectra 6:00-12:00 12x
Entry  Sat Jul 3 01:28:08 2021, The remote Canadian eager beavers (Guy and Iris), Analysis, Summed spectra 410 MHz from 21:00-23:59 (70Se) July2-21-0h-410MHz_AllSpectra_70Se.png
Entry  Sat Jul 3 03:07:43 2021, The remote Canadian eager beavers (Guy & Iris), Analysis, Some single spectra (410 MHz) from 21-24h July2-70Se-single-spectra-21-24h.pdf
Entry  Sat Jul 3 03:41:48 2021, The remote Canadian eager beavers (Guy & Iris), Analysis, Summed Spectra Summary 72Ge_sum.png72Br_sum.png70Se_not-scraped.png70Se_strong-scraped.png70Se_not-scraped_high_contrast.png
Entry  Sat Jul 3 04:33:50 2021, The remote Canadian eager beavers (Guy & Iris), Analysis, Slight shift in 70Se frequency 70Se-shift-21h-4h.png
Entry  Sat Jul 3 06:48:38 2021, The remote Canadian eager beavers (Guy & Iris), Analysis, Closer potential isomer tracks 70Se_close_pot_isomers.png
Entry  Sat Jul 3 06:49:55 2021, The remote Canadian eager beavers (Guy &Iris), Analysis, List of possible spectra with isomer decay 410MHz-2021.07.02.22.03.37.550.tiq.png
   +  Reply  Sat Jul 3 07:35:31 2021, The remote Canadian eager beaver (Iris), Analysis, Closer potential isomer tracks 410MHz-2021.07.02.21.42.36.139.tiq.png410MHz-2021.07.02.22.40.24.894.tiq.png
Entry  Thu May 6 21:26:02 2021, Yuri et al., Accelerator, Energies 
Entry  Thu May 6 21:36:04 2021, Regina + Markus + Yuri, Accelerator, Cooler Curve cc_1.jpg
Entry  Thu May 6 22:05:30 2021, Helmut, Accelerator, Beamline and ESR data sets for 72Ge setting 2021-05-06_22-07-09_SIS18_FAST_20210506_ESR_78KR32.C1.txt2021-05-06_22-07-52_ESR_EXP21_06_ISO_78Kr_05May21.C1.txt
Entry  Fri May 7 02:01:08 2021, Liliana, Akash, Wolfram, Helmut, Shahab, Accelerator, Beam issues for short duration 
Entry  Fri May 7 03:44:55 2021, Helmut Weick, Accelerator, scraper optimisation 
Entry  Fri May 7 09:58:04 2021, Yuri, Accelerator, Setting up KO extraction for Caves 
Entry  Fri May 7 10:05:06 2021, Yuri, Accelerator, E02DS3HG does not drive 
Entry  Fri May 7 10:46:40 2021, Yuri, Accelerator, GE02DS3HG 
Entry  Fri May 7 14:06:02 2021, Yuri, Accelerator, SIS kicker failure 
Entry  Fri May 7 16:09:50 2021, Yuri, Accelerator, Stop, change of sextuple settings 
ELOG V3.1.5-fc6679b