63
|
Sat May 8 01:06:19 2021 |
Philipp, Marta | General | Screenshot | The signal of the transformer on the lower
right panel is not really beam related. It
is mostly noise. Changes are not so expected |
|
64
|
Sat May 8 01:33:25 2021 |
Helmut Weick | Simulations | frequency list for 70Se setting | EXCEL table with all possible fragments injected
into ESR.
The path length in ESR, gamma_t and harmonic |
|
65
|
Sat May 8 01:43:23 2021 |
Helmut Weick | Accelerator | 70Se setting | If gamma_t = 1.3955 Tm stays, we will need
Brho = 6.21902 Tm for 70Se.
The corresponding ESR Brho setting will be |
|
66
|
Sat May 8 03:05:42 2021 |
Rui-Jiu Chen | DAQ | Change reference level to -60dBm | Start a new run. The data of new run is in
:
SC_2021-05-07_17-33-29
|
|
67
|
Sat May 8 03:08:57 2021 |
Rui-Jiu Chen | DAQ | Change reference level to -50dBm | Start a new run. The data of new run is in
:
SC_2021-05-07_17-39-16
|
|
68
|
Sat May 8 07:14:00 2021 |
Akash, Nic, Jelena, Zsolt | General | Morning shift entry | Things look ok. No settings have been changed...
Analysis attempts are going on... |
|
69
|
Sat May 8 07:34:08 2021 |
Akash, Nic, Jelena, Zsolt | General | Zoom has its own mind | Zoom kicked us all out... we managed to get
back in...screen sharing is back on. |
|
70
|
Sat May 8 08:12:02 2021 |
Akash, Nic, Jelena, Zsolt | General | SIS, ESR time structure changes | The structure of SIS extraction seems to have
changed a little...also for ESR injection.
|
|
71
|
Sat May 8 08:16:08 2021 |
Akash, Nic, Jelena, Zsolt | Analysis | Night shift analysis | (Jelena has analysed these data files)
E143_245MHz_2021.05.08.00* (-s 5.0 -t 0.5) |
16x |
72
|
Sat May 8 08:44:32 2021 |
Akash, Nic, Jelena, Zsolt | Accelerator | No Beam! | 08.43am: Beam stopped. HKR looking into it.
Reason: they mentioned they don't know yet!
|
|
73
|
Sat May 8 10:51:41 2021 |
Akash, Nic, Jelena, Zsolt | Calibration | ESR settings seem different | Settings don't look the same...so we are not
yet writing files unless sure. |
|
74
|
Sat May 8 11:42:21 2021 |
Yuri | Accelerator | KPs | EO1KP03 was on = -44.9 A
E01KP05 was off, now is on = 3.67 A
The beam is on the right frequency, but the |
|
75
|
Sat May 8 15:18:23 2021 |
Michael, Wolfram, Yuri | General | Beam Settings changing | Beam settings are being changed back to 78Kr
beam at 467 Mev/u. |
|
76
|
Sat May 8 16:08:58 2021 |
Helmut Weick | Accelerator | beam position of Kr before ESR | Checked beam positions in beamline before
ESR,
they all look the same as before, with direct |
|
77
|
Sat May 8 17:29:54 2021 |
Yuri, Sergey, Wolfram, Michael, Shahab | Runs | recording Kr decay measurement on NTCAP | Uc = 250mA
decay Kr 78, 476 MeV/u
|
|
78
|
Sat May 8 18:35:25 2021 |
Rui-Jiu Chen | DAQ | Change reference level to -10dBm | The beam in ESR is 78Kr36+@476 MeV/u.
Start a new run:
SC_2021-05-08_18-25-52
|
|
79
|
Sat May 8 19:51:46 2021 |
Ragan, Rui-Jiu | DAQ | Change reference level to -50dBm | Start a new run. The data of new run is in
:
SC_2021-05-08_19-51-35
|
|
80
|
Sat May 8 21:08:13 2021 |
Helmut, Sergey, Shahab, Wolfram, Yuri | Accelerator | optimisation of sextuples | The optimisation of sextuples is finished.
Record a few files. |
|
81
|
Sat May 8 21:10:24 2021 |
Michael, Ruijiu, Helmut, Yuri, Wolfram, Sergey, Shahab | Runs | started data taking with high resolution | after optimizing the scrapers we have reached
the highest possible resolution in the isochronous
mode.
|
|
82
|
Sat May 8 21:42:26 2021 |
All | Runs | Stop72Ge | |
|