Sat May 8 15:18:23 2021, Michael, Wolfram, Yuri, General, Beam Settings changing
|
Beam settings are being changed back to 78Kr beam at 467 Mev/u. |
Sat May 8 11:42:21 2021, Yuri, Accelerator, KPs
|
EO1KP03 was on = -44.9 A
E01KP05 was off, now is on = 3.67 A
The beam is on the right frequency, but the width is still very broad. |
Sat May 8 10:51:41 2021, Akash, Nic, Jelena, Zsolt, Calibration, ESR settings seem different
|
Settings don't look the same...so we are not yet writing files unless sure. |
Sat May 8 08:44:32 2021, Akash, Nic, Jelena, Zsolt, Accelerator, No Beam!
|
08.43am: Beam stopped. HKR looking into it. Reason: they mentioned they don't know yet!
10.10am: SIS resumed operations. However, there are some issues with magnet power supplies for ESR and hence we still don't have beam. HKR member went |
Sat May 8 08:16:08 2021, Akash, Nic, Jelena, Zsolt, Analysis, Night shift analysis 16x
|
(Jelena has analysed these data files)
E143_245MHz_2021.05.08.00* (-s 5.0 -t 0.5) (2021.05.08.09.01.11.png)
|
Sat May 8 08:12:02 2021, Akash, Nic, Jelena, Zsolt, General, SIS, ESR time structure changes
|
The structure of SIS extraction seems to have changed a little...also for ESR injection.
In the span of a few minutes both the structures changed again...to look more like in the previous shifts, with lesser or no negative component. |
Sat May 8 07:34:08 2021, Akash, Nic, Jelena, Zsolt, General, Zoom has its own mind
|
Zoom kicked us all out... we managed to get back in...screen sharing is back on. |
Sat May 8 07:14:00 2021, Akash, Nic, Jelena, Zsolt, General, Morning shift entry
|
Things look ok. No settings have been changed...
Analysis attempts are going on... |
Sat May 8 03:08:57 2021, Rui-Jiu Chen, DAQ, Change reference level to -50dBm
|
Start a new run. The data of new run is in :
SC_2021-05-07_17-39-16
IQ_2021-05-07_17-39-16 |
Sat May 8 03:05:42 2021, Rui-Jiu Chen, DAQ, Change reference level to -60dBm
|
Start a new run. The data of new run is in :
SC_2021-05-07_17-33-29
IQ_2021-05-07_17-33-29 |
Sat May 8 01:43:23 2021, Helmut Weick, Accelerator, 70Se setting
|
If gamma_t = 1.3955 Tm stays, we will need Brho = 6.21902 Tm for 70Se.
The corresponding ESR Brho setting will be a bit shifted.
It then requires E-SIS = 446.55 MeV/u to get 70Se to this Brho and gamma_t.
|
Sat May 8 01:33:25 2021, Helmut Weick, Simulations, frequency list for 70Se setting
|
EXCEL table with all possible fragments injected into ESR.
The path length in ESR, gamma_t and harmonic are adjusted to the 72Ge data.
Some lifetimes are limited but all intense lines are >30s in lab system.
|
Sat May 8 01:06:19 2021, Philipp, Marta, General, Screenshot
|
The signal of the transformer on the lower right panel is not really beam related. It is mostly noise. Changes are not so expected with this low beam intensity |
Sat May 8 00:38:55 2021, Philipp, Marta, General, Screenshot
|
|
Fri May 7 23:08:44 2021, Michael, Kanika, Accelerator, Beam issues for short duration
|
The beam was lost for a few minutes from 23:01 to 23:06. It is back now. |
Fri May 7 22:48:33 2021, Chris, General, still running...
|
In anticipation of the imminent shift change, a snapshot of how things look. |
Fri May 7 22:00:36 2021, Chris, Accelerator, brief beam loss
|
Brief interruption in beam, ~21:42-21:51. |
Fri May 7 20:34:27 2021, Kanika, Michael, Shahab, Runs, back to 15 sec recording
|
now we are going back to 15 sec operation. Cave M (bio) operation is over |
Fri May 7 20:28:32 2021, Kanika, Michael, Shahab, Analysis, Some pictures from the 410 detector 9x
|
some pics. |
Fri May 7 19:56:10 2021, Kanika, Michael, Shahab, Runs, ZOOM session restart
|
restart zoom session |