| 73 | Sat May  8 10:51:41 2021 | Akash, Nic, Jelena, Zsolt | Calibration | ESR settings seem different | Settings don't look the same...so we are not yet writing files unless sure.
 |   | 
| 72 | Sat May  8 08:44:32 2021 | Akash, Nic, Jelena, Zsolt | Accelerator | No Beam! | 08.43am: Beam stopped. HKR looking into it. Reason: they mentioned they don't know yet!
 
 |  | 
| 71 | Sat May  8 08:16:08 2021 | Akash, Nic, Jelena, Zsolt | Analysis | Night shift analysis | (Jelena has analysed these data files) 
 E143_245MHz_2021.05.08.00* (-s 5.0 -t 0.5)
 | 16x   | 
| 70 | Sat May  8 08:12:02 2021 | Akash, Nic, Jelena, Zsolt | General | SIS, ESR time structure changes | The structure of SIS extraction seems to have changed a little...also for ESR injection.
 
 |   | 
| 69 | Sat May  8 07:34:08 2021 | Akash, Nic, Jelena, Zsolt | General | Zoom has its own mind | Zoom kicked us all out... we managed to get back in...screen sharing is back on.
 |  | 
| 68 | Sat May  8 07:14:00 2021 | Akash, Nic, Jelena, Zsolt | General | Morning shift entry | Things look ok. No settings have been changed... 
 Analysis attempts are going on...
 |  | 
| 67 | Sat May  8 03:08:57 2021 | Rui-Jiu Chen | DAQ | Change reference level to -50dBm | Start a new run. The data of new run is in :
 SC_2021-05-07_17-39-16
 |  | 
| 66 | Sat May  8 03:05:42 2021 | Rui-Jiu Chen | DAQ | Change reference level to -60dBm | Start a new run. The data of new run is in :
 SC_2021-05-07_17-33-29
 |  | 
| 65 | Sat May  8 01:43:23 2021 | Helmut Weick | Accelerator | 70Se setting | If gamma_t = 1.3955 Tm stays, we will need Brho = 6.21902 Tm for 70Se.
 The corresponding ESR Brho setting will be
 |  | 
| 64 | Sat May  8 01:33:25 2021 | Helmut Weick | Simulations | frequency list for 70Se setting | EXCEL table with all possible fragments injected into ESR.
 The path length in ESR, gamma_t and harmonic
 |    | 
| 63 | Sat May  8 01:06:19 2021 | Philipp, Marta | General | Screenshot | The signal of the transformer on the lower right panel is not really beam related. It
 is mostly noise. Changes are not so expected
 |   | 
| 62 | Sat May  8 00:38:55 2021 | Philipp, Marta | General | Screenshot |  |   | 
| 61 | Fri May  7 23:08:44 2021 | Michael, Kanika | Accelerator | Beam issues for short duration | The beam was lost for a few minutes from 23:01 to 23:06. It is back now.
 |  | 
| 60 | Fri May  7 22:48:33 2021 | Chris | General | still running... | In anticipation of the imminent shift change, a snapshot of how things look.
 |    | 
| 59 | Fri May  7 22:00:36 2021 | Chris | Accelerator | brief beam loss | Brief interruption in beam, ~21:42-21:51. |  | 
| 58 | Fri May  7 20:34:27 2021 | Kanika, Michael, Shahab | Runs | back to 15 sec recording | now we are going back to 15 sec operation. Cave M (bio) operation is over
 |  | 
| 57 | Fri May  7 20:28:32 2021 | Kanika, Michael, Shahab | Analysis | Some pictures from the 410 detector | some pics. | 9x   | 
| 56 | Fri May  7 19:56:10 2021 | Kanika, Michael, Shahab | Runs | ZOOM session restart | restart zoom session |  | 
| 55 | Fri May  7 18:43:13 2021 | Kanika, Michael, Shahab | Runs | cave M experiment needs more spills | our pattern causes beam loss while scanning the biological probes in the Cave M bio experiment.
 They loose every other spill due to high
 |   | 
| 54 | Fri May  7 18:08:35 2021 | Kanika, Sergey, Yuri, Wolfram, Michael, Shahab | Runs | going back to the original energy | going back to the original energy 441 MeV/u 
 last filenames with the previous energy:
 |  |