    Reply  Thu Jul 1 17:01:43 2021, Jacobus, Runs, Frequency shift 245MHz-2021.07.01.16.12.03.686.tiq.png
> The freqency suddenly shifted at time 16:11:47 and remained shifted until now 
> 
> The ESR status in the monitor stayed blue. No obvious sign that a magnet was down. The operators are checking
> 
> Sergey telephoned, he is also not sure but suggests stopping starting the ESR. We will wait for Yuri

In attachment, the moment when the shift occurred. 
Entry  Fri Jul 2 01:31:35 2021, The remote Canadian beavers (Iris, Guy), Analysis, First spectra after bottle change 410MHz-2021.07.01.23.38.25.809.tiq.png410MHz-2021.07.01.23.38.08.817.tiq.png
The first good spectra after the gas bottle change is from 23:38:25 (on the 410 MHz Analyzer) 
    Reply  Sun May 9 05:11:55 2021, Iris (Chris G., Jacobus, Michele), Runs, First 52Mn run (no 52Mn unfortunately) 
> Run E143-245 MHz-2021.05.09.01.17.42.265.tiq is the first run of the experiment on 52Mn.


And Run E143-410MHz-2021.05.09.03.27.37.368.tiq	from 2021-05-09 03:27 is the first run on the 410 MHz detector. Started a bit later than the 245 MHz detector.
 
Entry  Sun May 9 02:19:04 2021, Jacobus, Shahab, Runs, First 52Mn run  
Run E143-245 MHz-2021.05.09.01.17.42.265.tiq is the first run of the experiment on 52Mn.
Entry  Wed Jun 30 20:58:06 2021, Ragan, Helena, General, Few minutes of disruption 
There was a disruption from the SIS side for a few minutes.
Entry  Tue May 4 13:26:40 2021, Yuri, Simulations, Expected spectrum 72Ge 
A       Z      M/q                Int    difference in kHz@245MHz
68	30	2.263614752	35	-933.1
70	31	2.255131564	124	-457.0
36	16	2.247394703	1	-21.2
45	20	2.24726171	1	-13.7
81	36	2.247136805	1	-6.7
72	32	2.247041397	376	-1.3
72	32	2.247018215	376	0
63	28	2.246941324	1	4.3
54	24	2.246906236	1	6.3
74	33	2.239572482	568	420.9
65	29	2.238342523	100	490.5
76	34	2.232371568	62	829.3
67	30	2.230357529	100	943.7
69	31	2.222859086	172	1370.7
60	27	2.219224118	100	1578.3
62	28	2.211179746	100	2038.7
77	35	2.197207311	116	2842.5
Entry  Sun May 9 02:45:50 2021, Jacobus, Michele, Shahab, Runs, Example of possible 52.Mn isomer 52Mn_002.PNG
this is how it should look like
    Reply  Sun May 9 02:51:44 2021, Iris, Runs, Example of possible 52.Mn isomer 
So the "isomers" pop up at ~-600 Hz and +580 Hz... is the -600 Hz on the left the 378 keV isomer (21 min) and the +580 Hz on the right the g.s.?
    Reply  Sun May 9 03:24:12 2021, Iris (Shahab, Jacobus, Chris G., Michele), Runs, Example of possible 52.Mn isomer 
Short update from Yuri: these are not our isomers. These are 45Sc (left, 12 keV isomer not resolvable) and 75Br (center), and the right-most peak of the triplet is a satellite (has a different line shape, much narrower).




> So the "isomers" pop up at ~-600 Hz and +580 Hz... is the -600 Hz on the left the 378 keV isomer (21 min) and the +580 Hz on the right the g.s.?
Entry  Fri May 7 17:12:14 2021, Kanika, Sergey, Yuri, Wolfram, Michael, Shahab, Runs, Energy change -6 MeV/u 
changed the energy down to 435 MeV/u
Entry  Fri May 7 17:35:22 2021, Kanika, Sergey, Yuri, Wolfram, Michael, Shahab, Runs, Energy change +6 MeV/u 
We will now go up in energy to 447 MeV (+6 MeV) from the original energy

last file name with previous energy:

245: 2021.05.07.16.33.47.178
410: 2021.07.05.17.34.04.780
Entry  Thu May 6 21:26:02 2021, Yuri et al., Accelerator, Energies 
gamma_t = 1.3955
Br(72Ge) corresponds to 6.79575 Tm
E (Kr) at Br(72Ge) = 392.9 MeV/u
ESIS = 467.45 MeV/u (pre-drilling, after 1.8 g/cm2 target)
ESIS = 440.98 MeV/u (final energy for 72Ge)

-during setup, a 20 mm offset in the TE line was observed. Beam centered via changing the Br of the beamline (~4 MeV/u up). Optimized pre-drilling transmission ~20% (with thick target)
Entry  Mon May 10 08:49:01 2021, Kanika, Alex, RuiJiu, General, End of the measurement 
The beam was stopped at about 08:40.
Entry  Fri Jul 2 13:44:50 2021, Sergey, et al, Accelerator, El cooler 
Up to now, attempts to cool the fat line between Se and Ar were conducted. We give up it now and remove cooling
Entry  Sat May 8 10:51:41 2021, Akash, Nic, Jelena, Zsolt, Calibration, ESR settings seem different Screenshot_2021-05-08_at_10.50.23.png
Settings don't look the same...so we are not yet writing files unless sure.
Entry  Thu May 6 17:48:48 2021, W. Korten, Helmut, General, ESR setting for 72Ge ions with primary beam  
Setting the 78Kr (after the target) to the Brho of the 72Ge beam at 368.4 MeV/u (gamma=1.3955), i.e. 6.79575 Tm, which leads to an energy of 392.93 (of 78Kr). 
With the 10mm Be target the beam energy should then be 467.8 MeV/u .
Yes, with my slightly different target thickenss 467.5 MeV/u (Helmut).

For 72Ge at this Brho after the target it then needs 440.95 MeV/u.
LISE in proj. fragmentation option Morissey for projectile energy loss and ATIMA 1.4 with Be 1839 mg/cm^2).
Entry  Fri May 7 10:05:06 2021, Yuri, Accelerator, E02DS3HG does not drive 
E02DS3HG stays at -35 mm and does not react
Entry  Wed Jun 30 20:14:44 2021, Ragan, Helena, General, Drop in SIS intensity 
There is a drop in SIS intensity and the operators are informed.
Entry  Thu May 6 16:45:42 2021, Ragan, Rui-Jiu, DAQ, Data taking with NTCAP 1.jpg2.jpg
NTCAP is on and data taking has started.
On time: 16:39

SC_2021-05-06_16-39-09
\IQ_2021-05-06_16-39-09

IQ Rate: 20 MS/s
Carrier frequency: 245 MHz
Reference level(dBm):-30
RF attenuation(dB):40
IF attenuation(dB):19.9288

Data file
Samples/records:2^18=262144
Records/File:2^12=4096

SC file: 
Entries/file:2^18=262144

Master path:
o:\E143\iq 
o:\E143\sc
Entry  Fri May 7 04:39:00 2021, Liliana, Akash, Wolfram, Helmut, Shahab, Runs, Data taking starts 
File start being recorded at 4:38 am 
Sync with the server is working. 

Be aware that the timestamp of the files is 1h behind with respect to real time