HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay, Page 9 of 12  Not logged in ELOG logo
ID Date Author Category Subject
  73   Sat May 8 10:51:41 2021 Akash, Nic, Jelena, ZsoltCalibrationESR settings seem different
Settings don't look the same...so we are not yet writing files unless sure.
Attachment 1: Screenshot_2021-05-08_at_10.50.23.png
Screenshot_2021-05-08_at_10.50.23.png
  72   Sat May 8 08:44:32 2021 Akash, Nic, Jelena, ZsoltAcceleratorNo Beam!
08.43am: Beam stopped. HKR looking into it. Reason: they mentioned they don't know yet!

10.10am: SIS resumed operations. However, there are some issues with magnet power supplies for ESR and hence we still don't have beam. HKR member went to look for power supply expert.

10.15am: There were some random triggers coming from ESR, which resulted in files being written. To avoid this, the scope trig (both scopes) were taken out. As soon as the beam comes in 'properly', I will reconnect the trig in to the scopes (-akash).

10.40am: They sent something to ESR but it does not make sense...so HKR has called an ESR expert (Sergey).

11.30am: Yuri is here and trying to sort out the issue- no data being written yet.
  71   Sat May 8 08:16:08 2021 Akash, Nic, Jelena, ZsoltAnalysisNight shift analysis
(Jelena has analysed these data files)

E143_245MHz_2021.05.08.00* (-s 5.0 -t 0.5)  (2021.05.08.09.01.11.png)

E143_245MHz_2021.05.08.01* (-s 5.0 -t 0.5)  (2021.05.08.08.56.05.png)

E143_245MHz_2021.05.08.02* (-s 5.0 -t 0.5)  (2021.05.08.08.44.10.png)

E143_245MHz_2021.05.08.03* (-s 5.0 -t 0.5)  (2021.05.08.08.33.46.png)

E143_245MHz_2021.05.08.04* (-s 5.0 -t 0.5)  (2021.05.08.08.26.49.png)  

E143_245MHz_2021.05.08.05* (-s 5.0 -t 0.5)  (2021.05.08.07.58.22.png)

E143_245MHz_2021.05.08.06* (-s 5.0 -t 0.5)  (2021.05.08.08.12.14.png)

E143_245MHz_2021.05.08.07* (-s 5.0 -t 0.5)  (2021.05.08.09.12.53.png)

-------------------------------------------------------------------------

E143_410MHz_2021.05.08.00* (-s 5.0 -t 0.5)  (2021.05.08.10.20.39.png)

E143_410MHz_2021.05.08.01* (-s 5.0 -t 0.5)  (2021.05.08.10.16.46.png)

E143_410MHz_2021.05.08.02* (-s 5.0 -t 0.5)  (2021.05.08.10.13.09.png)

E143_410MHz_2021.05.08.03* (-s 5.0 -t 0.5)  (2021.05.08.10.07.05.png)

E143_410MHz_2021.05.08.04* (-s 5.0 -t 0.5)  (2021.05.08.10.04.05.png)

E143_410MHz_2021.05.08.05* (-s 5.0 -t 0.5)  (2021.05.08.09.51.12.png)

E143_410MHz_2021.05.08.06* (-s 5.0 -t 0.5)  (2021.05.08.09.45.12.png)

E143_410MHz_2021.05.08.07* (-s 5.0 -t 0.5)  (2021.05.08.09.38.33.png)
Attachment 1: 2021.05.08.07.58.22.png
2021.05.08.07.58.22.png
Attachment 2: 2021.05.08.08.12.14.png
2021.05.08.08.12.14.png
Attachment 3: 2021.05.08.08.26.49.png
2021.05.08.08.26.49.png
Attachment 4: 2021.05.08.08.33.46.png
2021.05.08.08.33.46.png
Attachment 5: 2021.05.08.08.44.10.png
2021.05.08.08.44.10.png
Attachment 6: 2021.05.08.08.56.05.png
2021.05.08.08.56.05.png
Attachment 7: 2021.05.08.09.01.11.png
2021.05.08.09.01.11.png
Attachment 8: 2021.05.08.09.12.53.png
2021.05.08.09.12.53.png
Attachment 9: 2021.05.08.09.38.33.png
2021.05.08.09.38.33.png
Attachment 10: 2021.05.08.09.45.12.png
2021.05.08.09.45.12.png
Attachment 11: 2021.05.08.09.51.12.png
2021.05.08.09.51.12.png
Attachment 12: 2021.05.08.10.04.05.png
2021.05.08.10.04.05.png
Attachment 13: 2021.05.08.10.07.05.png
2021.05.08.10.07.05.png
Attachment 14: 2021.05.08.10.13.09.png
2021.05.08.10.13.09.png
Attachment 15: 2021.05.08.10.16.46.png
2021.05.08.10.16.46.png
Attachment 16: 2021.05.08.10.20.39.png
2021.05.08.10.20.39.png
  70   Sat May 8 08:12:02 2021 Akash, Nic, Jelena, ZsoltGeneralSIS, ESR time structure changes
The structure of SIS extraction seems to have changed a little...also for ESR injection.

In the span of a few minutes both the structures changed again...to look more like in the previous shifts, with lesser or no negative component.
Attachment 1: Screenshot_2021-05-08_at_08.08.14.png
Screenshot_2021-05-08_at_08.08.14.png
  69   Sat May 8 07:34:08 2021 Akash, Nic, Jelena, ZsoltGeneralZoom has its own mind
Zoom kicked us all out... we managed to get back in...screen sharing is back on.
  68   Sat May 8 07:14:00 2021 Akash, Nic, Jelena, ZsoltGeneralMorning shift entry
Things look ok. No settings have been changed...

Analysis attempts are going on...
  67   Sat May 8 03:08:57 2021 Rui-Jiu ChenDAQChange reference level to -50dBm
Start a new run. The data of new run is in :
SC_2021-05-07_17-39-16
IQ_2021-05-07_17-39-16
  66   Sat May 8 03:05:42 2021 Rui-Jiu ChenDAQChange reference level to -60dBm
Start a new run. The data of new run is in :
SC_2021-05-07_17-33-29
IQ_2021-05-07_17-33-29
  65   Sat May 8 01:43:23 2021 Helmut WeickAccelerator70Se setting
If gamma_t = 1.3955 Tm stays, we will need Brho = 6.21902 Tm for 70Se.
The corresponding ESR Brho setting will be a bit shifted.
It then requires E-SIS = 446.55 MeV/u to get 70Se to this Brho and gamma_t.

For pre-drilling with 78Kr beam at same Brho use 416.70 MeV/u.
But we could also make a quick try without tuning before, just change all energies.
  64   Sat May 8 01:33:25 2021 Helmut WeickSimulationsfrequency list for 70Se setting
EXCEL table with all possible fragments injected into ESR.
The path length in ESR, gamma_t and harmonic are adjusted to the 72Ge data. 
Some lifetimes are limited but all intense lines are >30s in lab system.
There are two versions (for cooled beam with fixed v or uncooled (isochronous) 
with fixed average Brho, take the second (grey) column.
For larger frequency shifts harmonics will overlap.
You can add more isomers.
Attachment 1: freq-lines-70Se.JPG
freq-lines-70Se.JPG
Attachment 2: frag-freq-list.xlsx
  63   Sat May 8 01:06:19 2021 Philipp, MartaGeneralScreenshot
The signal of the transformer on the lower right panel is not really beam related. It is mostly noise. Changes are not so expected with this low beam intensity
Attachment 1: Screenshot_2021-05-08_at_00.58.16.png
Screenshot_2021-05-08_at_00.58.16.png
  62   Sat May 8 00:38:55 2021 Philipp, MartaGeneralScreenshot
Attachment 1: Screenshot_2021-05-08_at_00.32.16.png
Screenshot_2021-05-08_at_00.32.16.png
  61   Fri May 7 23:08:44 2021 Michael, KanikaAcceleratorBeam issues for short duration
The beam was lost for a few minutes from 23:01 to 23:06. It is back now.
  60   Fri May 7 22:48:33 2021 ChrisGeneralstill running...
In anticipation of the imminent shift change, a snapshot of how things look.
Attachment 1: E143-245MHz-2021.05.07.21.46.10.889.tiq.png
E143-245MHz-2021.05.07.21.46.10.889.tiq.png
Attachment 2: Zoom_screenshot.PNG
Zoom_screenshot.PNG
  59   Fri May 7 22:00:36 2021 ChrisAcceleratorbrief beam loss
Brief interruption in beam, ~21:42-21:51.
  58   Fri May 7 20:34:27 2021 Kanika, Michael, ShahabRunsback to 15 sec recording
now we are going back to 15 sec operation. Cave M (bio) operation is over
  57   Fri May 7 20:28:32 2021 Kanika, Michael, ShahabAnalysisSome pictures from the 410 detector
some pics.
Attachment 1: E143-410MHz-2021.05.07.20.21.32.783.tiq.png
E143-410MHz-2021.05.07.20.21.32.783.tiq.png
Attachment 2: E143-410MHz-2021.05.07.20.21.44.827.tiq.png
E143-410MHz-2021.05.07.20.21.44.827.tiq.png
Attachment 3: E143-410MHz-2021.05.07.20.21.56.869.tiq.png
E143-410MHz-2021.05.07.20.21.56.869.tiq.png
Attachment 4: E143-410MHz-2021.05.07.20.22.08.911.tiq.png
E143-410MHz-2021.05.07.20.22.08.911.tiq.png
Attachment 5: E143-410MHz-2021.05.07.20.22.20.952.tiq.png
E143-410MHz-2021.05.07.20.22.20.952.tiq.png
Attachment 6: E143-410MHz-2021.05.07.20.22.32.993.tiq.png
E143-410MHz-2021.05.07.20.22.32.993.tiq.png
Attachment 7: E143-410MHz-2021.05.07.20.22.45.037.tiq.png
E143-410MHz-2021.05.07.20.22.45.037.tiq.png
Attachment 8: E143-410MHz-2021.05.07.20.22.59.920.tiq.png
E143-410MHz-2021.05.07.20.22.59.920.tiq.png
Attachment 9: E143-410MHz-2021.05.07.20.23.17.103.tiq.png
E143-410MHz-2021.05.07.20.23.17.103.tiq.png
  56   Fri May 7 19:56:10 2021 Kanika, Michael, ShahabRunsZOOM session restart
restart zoom session
  55   Fri May 7 18:43:13 2021 Kanika, Michael, ShahabRunscave M experiment needs more spills
our pattern causes beam loss while scanning the biological probes in the Cave M bio experiment. They loose every other spill due to high request rate from ESR.

For the next 2 hours, the operators have changed the spill pattern that as long as they are scanning , we get only every 1 minute, otherwise we get our 15 seconds as usual.

after two hours this situation should be tuned back to the original spill pattern.
Attachment 1: rep.jpg
rep.jpg
  54   Fri May 7 18:08:35 2021 Kanika, Sergey, Yuri, Wolfram, Michael, ShahabRunsgoing back to the original energy
going back to the original energy 441 MeV/u

last filenames with the previous energy:

245: 2021.05.07.17.07.00.543
410: 2021.05.07.18.07.18.037
ELOG V3.1.5-fc6679b