  19   Wed May 12 10:15:47 2021 Volker HannenDAQUnplugged TDC inputs for MCP front and backTo reduce the load on the VUPROM TDC, we unplugged
the TDC inputs for the front and back signals
of the MCP of the XUV detector.
  
  70   Sun May 16 02:18:53 2021 SebastianGeneralUV Drop1:25 a.m. huge drop in UV laser power
-> small crystal bump with both y screws
of bbo oven
  
  51   Fri May 14 09:00:55 2021 SebastianGeneralUNILAC Problems~30 min downtime

--> LASER ADJUSTEMENTS!
  
  50   Fri May 14 08:55:53 2021 SebastianGeneralToDO 14.5 ...so far1.) ion lasser overlap and scraper test

2.) change bunching frequency to middle of
  
  84   Mon May 17 21:43:56 2021 DanyalGeneralThe test beamtime was a success.Dear all,

The test beamtime is now over. 
  
  1   Mon May 10 07:58:13 2021 DanyalGeneralTelephone numbers and Zoom linkTelephone numbers:

ESR laser lab: +49 (0)6159 71 - 2882
  
  68   Sat May 15 11:26:44 2021 BenediktGeneralTEM parametersWe changed the horizontal position of the
laser beam a bit, so that we maximized the
fluorescence signal on the XUV detector (coasting
  
  75   Sun May 16 05:09:27 2021 TeamGeneralSwitch to 285pspulse length -> 285ps

minimum 62mW inside ESR (depending on laser
  
  77   Sun May 16 06:13:46 2021 TeamGeneralSwitch to 166ps     
  38   Thu May 13 03:35:25 2021 LarsGeneralStatus: Current schedule ... so far1.) so far: 
h = 2, 4, 6, 7, 8, 10, 12, 14, 16, 18, 20,
30
  
  57   Fri May 14 16:37:01 2021 BenediktGeneralStatus updateRight now, we have to adjust the ion beam
a bit to overlap better with the laser beam.
We keep the laser wavelength at resonance
  
  45   Fri May 14 04:50:46 2021 Team #NightGeneralScraper Tests Ion / Laser Beamlaser is 4-6mm below the ion beam.
It could be that the interaction between
both beams came only from the interaction
  
  17   Wed May 12 09:59:08 2021 BenediktGeneralRigol DSG821 signal generator settings   CF7701F6-86BE-406C-8FAD-F3161463181C.jpeg 
  79   Sun May 16 07:18:56 2021 Night Shift Sebastian/Max/NoahGeneralPreparation for automated laser scansWe shut the laser system down to prepare automated
laser scans
  
  22   Wed May 12 18:59:15 2021 Ken UeberholzGeneralPower is backPower is back and most things are running
again
  
  41   Thu May 13 21:00:48 2021 BenediktGeneralNew reprate of the UV laserThe lasersystem now operates at a reparte
of 9.038946 MHz. This is 7 times f_rev (see
previous post).
  
  40   Thu May 13 20:18:10 2021 BenediktGeneralNew f_revThe ions were changed to a different speed
today at 2 PM. The new revolution frequency
is now 1.291278 MHz.
  
  67   Sat May 15 11:06:31 2021 BenediktGeneralNew Zoom link for the momenthttps://tu-darmstadt.zoom.us/j/4948400422?pwd=SEJaUzBuYXM0TTd6UWxoZTFlWEZxUT09

Meeting ID: 494 840 0422
  
  36   Thu May 13 02:42:58 2021 SebastianGeneralLasershutter ESR Entrance?!attached should be the name of the entrance
laser shutter. just in case somebody will
close it ;)
 IMG_20210513_020027_resized_20210513_024049198.jpg 
  69   Sat May 15 12:11:54 2021 BenediktGeneralLaser-bunch-timingOptimizing the laser bunch timing.
h = 7 (9.0389145 MHz)
Reprate is already set to same frequency.
  