ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by
  22   Fri Nov 22 11:07:36 2019 Phetest without bakeoutBeam Diagnostic Chambers from India for HEBT - small one   unknownDONERefused09.01.2020Customised10.01.2020 - still pumpingAccepted15.01.20Mahr Rainer
Inside of the chamber is dirty (black mark when wiped with tissue). At the moment (16.12.2019), the chamber is under cleaning. Chamber has been cleaned on the 18.12.2019, stored in the Testing Halle. Vacuum acceptance test on the chamber - started on the 09.01.2020.
  23   Fri Nov 22 11:08:19 2019 Phetest with bakeoutSEM-Monitor for Beam Diagnostic SIS18   02.12.2019DONEAccepted03.12.2019Setup 213.12.2019Cond. Accep.06.01.2020Fiedler, Sebastian
  24   Fri Nov 22 11:09:19 2019 Phetest with bakeoutGrid for Beam Diagnostic SIS18   02.12.2019DONEAccepted03.12.2019Setup 113.12.2019Cond. Accep.06.01.2020Fiedler, Sebastian
  25   Fri Nov 22 11:09:59 2019 PheOtherSeptum SIS100 - NEG coated chamberEnd 2019Delayed unknownTO COME       
  26   Fri Nov 22 11:10:33 2019 Phetest with bakeoutDipole Chambers for SIS100 (2box)25.11.19DelayedUnknown17.01.20DONEAccepted12.02.2020 End februarAccepted  
All chambers are inserted with success into the magnet. Leak check for: 07-6-013-3; 07-6-009-6; 07-6-011-9
  Draft   Fri Nov 22 11:11:00 2019 Phetest with bakeoutQuad Chambers for SIS100   unknownTO COME       
  28   Fri Nov 22 11:11:24 2019 Pheleak check4th batch of roughing CWT for SIS100   06.01.20DONEAccepted10.02.2020Customised13.03.20Accepted Stored in Weiterstadt
07-51-50-6; 07-51-38-4;07-51-47-6; 07-51-33-9; 07-51-02-5 (GEWINDEBOHRUNG IM KONTAKBLOCK WRONG);07-51-43-8; 07-51-41-4;07-51-44-5;07-51-42-1;04-51-39-1; 07-51-48-3; 07-51-40-7; 07-51-49-0;07-51-45-2; 07-51-46-9
  29   Fri Nov 22 11:11:56 2019 Phetest with bakeout'Spill-Cavitaet" ???August 2019DelayedKW26 TO COME       
  30   Thu Nov 28 11:09:29 2019 Cristinatest with bakeoutReference chamber for Grid for beam diagnostic SIS18   06.01.2020DONENot Needed09.01.2020; Setup 119.01.20Accepted--------------------
  Draft   Thu Nov 28 11:11:16 2019 Cristinatest with bakeoutReference chamber for Monitor for beam diagnostic   09.01.2020on-goingNot Needed08.01.2020; 09:05 am; repeat due to leak - 13.01.2019, 07:00 amSetup 2    
  32   Mon Dec 2 14:28:58 2019 CristinaGeneralTS1MU1-test with magnetAugust 2019 delayed to KW6 2020DelayedUnkwonN/ADONEAccepted04.03.2020Customised Accepted Grossmontage
Test bakeout inside the magnet
  34   Wed Dec 4 10:08:42 2019 Cristinatest with bakeoutMacor 3 charge   04.12.19DONEAccepted11.02.2020Customised20.03.2020Cond. Accep.23.03.2020T. Giacomini
  35   Thu Dec 12 09:20:54 2019 Cristinatest with bakeoutIPM SIS100-GiacominiJannuary 2020DelayedUnknown21.04.2020DONENot Needed04.05.2020Customised15.05.2020AcceptedMai/JuniBrough to the TH
  36   Thu Dec 12 09:22:19 2019 Cristinatest without bakeoutPalmer PU Tank- DimopoulouJanuary 2020on scheduleJanuary 2020January 2020DONEAccepted28.01.20Customised31.01.20Accepted03.02.20Grossmontage
  37   Thu Dec 12 10:19:06 2019 Cristinatest with bakeoutPumping chamber SIS100 -StefanEnd 2019DelayedBeginning202010.12.19DONEAcceptedJanuaryCustomised05.02.2020Accepted Stored in the TH
  38   Fri Dec 13 09:03:27 2019 Christianleak checkFasersonde Unilac   12.12.19DONEAccepted12.12.19Customised16.12.19Refused16.12.19Sthraldiagnose
  39   Mon Dec 16 15:27:50 2019 Phetest without bakeoutBeam Diagnostic from Inida - big one   13.13.2019 DONERefused15.01.20Customised19.01.20Accepted24.01.201M.Müller
The chamber has a dent. At the moment (16.12.2019), the chamber is under test for mechanical acceptance.
  40   Tue Dec 17 13:39:20 2019 Pheleak checkFasersonde Unilac -2 test   17.12.2019DONENot Needed17.12.2019Customised17.12.2019Accepted20.12.2019Beam diagnostic
This phase probe was tested by Christian Kolligs on the 12.12.2019 and it has leak rate of 1E-6 mbar.l/s.

The probe was then repaired by the Beam Diagnostic and tested again on the 17.12.2019 by Toni Coronato: it was leaky again. Repaired again and installed in the Unilac on the 20.12.19
  41   Wed Dec 18 11:27:54 2019 Pheleak checkTransistion tube for SIS100 string testBeginning 2020DelayedFebruary06.02.2020DONERefused   Refused  
  42   Thu Jan 16 09:05:12 2020 Cristinatest without bakeoutBPM SIS100- 2010-327.01.20Delayed30.01.2030.01.20DONEAccepted03.02.2020Customised05.02.2020Refused10.02.2020M.Müller
New mobile pumping station - the controller for the IMG did not work. The pressure is recorded from the gauge controller of Mobile pumping setup 2.