ID |
Date |
Author |
Category |
Subject |
Text |
|
113
|
Tue Jun 6 09:33:00 2023 |
Rodolfo | Laser | Fiber coupler | Cobra's new fiber-coupling unit for wavelength
reading. |
|
112
|
Wed Jan 18 13:02:12 2023 |
Rodolfo | Laser | Testing WS6 with Cobra | Testing the WS6 (S.N. 3950) together with
the Cobra.
|
|
111
|
Fri Jan 13 17:05:22 2023 |
Rodolfo | Laser | Testing WS6 | Testing the new Wavemeter (HighFinesse, WS6,
SN3950) with the QRAY laser light @ 532 nm.
Multimode fiber von High Finesse:FC/PC S |
|
110
|
Thu Jun 30 11:12:21 2022 |
Carsten | Analysis | Updated Go4 Analysis with small Bugfix (PMTOverWavelength SPectra) | Here attached is a more recentversion of the
Go4 Analysis Code with some smaller bugfixes.
For adaequate *.C files please have alook |
|
109
|
Fri Jun 3 12:01:17 2022 |
Danyal | Detectors | switched off XUV detector on 1 June ~17:00 | I have switched off the XUV detector on 1
June at about 17:00.
The high voltages of the MCP (in ESR laser |
|
108
|
Wed Jun 1 17:20:04 2022 |
Rodolfo | Laser | HeNe @ WS7 | |
|
107
|
Wed Jun 1 08:39:50 2022 |
Kristian, Konstantin | Calibration | Wavemeter reading | We recorded files with high wavemeter readout
rate and saved it at the atplaser network
drive (Q:) - Bismuth - wavemeter folder.
|
|
106
|
Wed Jun 1 00:16:02 2022 |
Konstantin, Simon | DAQ | Timing 209Bi thick target | Timing for the final measurements on 209Bi
was determined for the new frequency 1.93777MHz.
Peak positions are
|
|
105
|
Wed Jun 1 00:03:08 2022 |
Konstantin, Simon, Kristian | Runs | 209-Bi runs | [TABLE border="1"]
Time | SIS-intensity | ESR-intensity after
orbit change| cooler-HV | cooler current |
|
104
|
Tue May 31 21:58:55 2022 |
Max, Rodolfo | Laser | MRC Settings for 209Bi | We have change the laser settings for the
spectroscopy of 209Bi.
|
|
103
|
Tue May 31 21:08:04 2022 |
Carsten, Max | Detectors | XUV detector automation off | We deactivated the automation of the XUV detector.
It stays out now. |
|
102
|
Tue May 31 19:59:49 2022 |
Carsten, Danyal | Accelerator | change in frequency mismatch 208Bi --> 209Bi | time = 20:00
The RF has been adjusted so that it bunches |
|
101
|
Tue May 31 19:37:30 2022 |
Carsten, Max, Wilfried | Detectors | SASZ and NASZ voltages switched off | SASZ and NASZ voltages were switched off bevor
we went back to 209Bi. Laser beam stabilization
turned off. |
|
100
|
Tue May 31 19:32:56 2022 |
Carsten, Wilfried, Max | Calibration | electron cooler calibration voltage - frequency | [TABLE border="1"]
SetVoltage (DeltaU) | MeasVoltage | freq
| Current
|
|
99
|
Tue May 31 17:22:09 2022 |
Max, Carsten, Danyal, Rodolfo, Wilfried | General | change E-cooler current I_e = 50 mA |
At 17:15 we changed again the E-cooler current
I_e = 50 mA
|
|
98
|
Tue May 31 15:19:58 2022 |
Max, Carsten, Danyal | General | scans for different E-cool currents |
until 15:15 we have measured with I_e = 100
mA (3 loops per file)
|
|
97
|
Tue May 31 03:18:52 2022 |
Patrick, Konstantin | Laser | Laser timing | The final timings are (in bins +-1):
PD NO: 103
|
|
96
|
Mon May 30 23:18:06 2022 |
Carsten, Rodolfo, Konstantin, Patrick, Ragan, Ken, Kristian, Max, Danyal | Runs | Runs shifts 31.05. | These are the first runs with 208Bi.
[TABLE border="1"]
|
|
94
|
Mon May 30 21:52:08 2022 |
Wilfried, Danyal, David, Rodolfo | General | Position of T-Scrapers | We have determined the position of the H-like
208Bi ion beam using the T-Scrapers. The
position actually did not change in comparison |
|
93
|
Mon May 30 20:58:26 2022 |
Carsten | Accelerator | New Settings for 208Bi Beam | Old SetParameters.C and old SetConditions.C
were saved as SetParameters_209.C and SetConditions_209.C
|
|