  Dielectronic recombination-assisted laser spectroscopy, Page 4 of 6  Not logged in ELOG logo
Entry  Thu May 12 15:50:33 2022, Max, Accelerator, No ESR beam 
Since 13:30 we have no beam in the ESR. There is a problem with the ESR septum.
The magnets department is investigating.
Entry  Thu May 12 16:35:17 2022, Max, Wilfried, Zoran, Accelerator, NO BEAM UNTIL TOMORROW MORNING 
The problem at the ESR septum is serious. They have to remove the broken part and try to repair it.
Maybe tomorrow in the morning briefing there will be more information about this.

The night shift will not take place!
The morning shift starts at 9:00 or on further notice!

The PMTs are switched off and the laser also.
    Reply  Fri May 13 08:32:41 2022, Zoran, Accelerator, NO BEAM UNTIL TOMORROW MORNING 
> The problem at the ESR septum is serious. They have to remove the broken part and try to repair it.
> Maybe tomorrow in the morning briefing there will be more information about this.
>
> The night shift will not take place!
> The morning shift starts at 9:00 or on further notice!
>
> The PMTs are switched off and the laser also.

Update from the morning briefing: the DCCT (power converter) of the injection septum was demounted and the EPS group is trying to fix it. There is no replacement available, so if they do not succeed this beamtime is over. They promised more information in the midday meeting at 12:45.

In the ESR Messhüte is some cake ("Trostkuchen").
Entry  Fri May 13 11:46:51 2022, Sebastian, Simon, , Laser energy 
We (Sebastian and I) measured the output energy of the laser system again.
All values in [mJ] and over 500 laser-pulses average

DateOut of Quanta Ray @ 532 nmSeed energy for Cobra @ 532 nmOut of Cobra @ 601 nm
10.05.202253348571
11.05.202248448067
12.05.202257850175
13.05.202263249878


The lambda/2 is at 100°. Correction factor for the 532nm-monitor is 8.4.
Entry  Fri May 13 16:55:58 2022, Danyal, Carsten, Phillip, Wilfried, General, End of E128 Beamtime  
Dear all,

unfortunately, the E128 experiment must now come to an early end. 
The problem(s) with the injection septum are severe and no work around solution (with acceptable risks) could be found. 
Several things were tried, but without hope. 

Many thanks to everybody involved during the preparation time and the shifts during the beamtime. 

Best wishes,

Wilfried
    Reply  Mon May 16 14:20:05 2022, Ragan, Danyal, Carsten, Phillip, Wilfried et al., General, E128 Beamtime  
> Dear all,
> 
> unfortunately, the E128 experiment must now come to an early end. 
> The problem(s) with the injection septum are severe and no work around solution (with acceptable risks) could be found. 
> Several things were tried, but without hope. 
> 
> Many thanks to everybody involved during the preparation time and the shifts during the beamtime. 
> 
> Best wishes,
> 
> Wilfried

There is beam again in the ESR. The plan is to take beam until tomorrow morning. 
Entry  Mon May 16 15:57:37 2022, Rodolfo, Laser, Wavemeter calibration WS7_VorKalibrationMitHe-Ne_16-05-2022.PNGWS7_NachKalibrationMitHe-Ne_16-05-2022.PNG
I have calibrated our Wavemeter WS7 using the temperature stabilized He-Ne Laser (SIOS EN60 825-1:2014). In the screenshots below you can see the readout of the wavemeter before (vor) and after (nach) calibration.
Entry  Mon May 16 17:15:56 2022, Carsten, Analysis, DAQ /Analysis - shift of peaks in the accumulated spectra, changes in code 
After a phone call with Wilfried I implemented an offset to all hit channels of the stacked / accumulated spectra where one chekcs the timing peaks.

Therfore, I made a copy of the analysis in 208Bi1 (one "1" at the end). And here, in the file TLdaAnlProc.cxx I added an offset of +70 to the hit channel (variable UInt_t hit, around line 335 /336 of the code).
Pleasse note that I just inlcuded one line with a "magic" number here, since I cannnot test teh compiling and was afraid to introduce an error.

So the lines were

UInt_t hit =tdcSE[i][j];

changed to 

UInt_t hit =tdcSE[i][j];
hit = hit + 70;

Plesaede note that you need to recompile and check and set all conditions for the time-preak window.

So , you now use the analysis in 208Bi1
Entry  Mon May 16 17:38:38 2022, Max, Danyal, Wilfried, Rodolfo, General, laser bunch timing timing1605.png
We overlapped the laser and ion bunch in the time domain. 
Therefore we delayed the bunching HF in order to see the PMT signal between bin 10 and 22. Before the signal Peak was in channel ~145-5 and difficult to gate on.
Afterwards we also have to shift the laser.
The new values are:

PD NO: 77.5
PD SO: 113
Ion bunch: 16.5 
Entry  Mon May 16 18:01:23 2022, mbsMax, Danyal, Wilfried, Rodolfo, Patrick, Kristian, David, Ruijiu , Runs, runs afternoon/night shift 16.05 
These are the runs after the septum was repaired on 16.05.

Time ESR-intensity ESR-intensity after orbit change cooler-HV LMD-DAQ2 file nr LMD-DAQ1 file nr scan range(nm) step width increment (nm) dwell time(s) n loops comments
ca. 18:00 ? ~3.0e7 223222 504-505 8121 601.62 - 601.405 0.005 5s 4 DAQ2 late start
18:11 ? ~3.3e7 223222 506 8122 601.62 - 601.405 0.005 5s 4 aborted, ions are rapidly lost after Bahnverlagerung
18:33 4.5e7 ~3.7e7 223222 507-509 8123 601.62 - 601.405 0.005 5s 4 removed all scrapers, beam life time is better, high intensity, slight instability in bunching, ion intensity at the end: 1.4e7, DC Trafo was in saturation so ampl. was turned down
19:32 ? 3.7e7 223222 512 8125 601.62 - 601.405 0.005 5s 4 rf bunching amplitude decreased from 350V -> 280V
20:00 ? 3.6e7 223223 514 8127 601.745 - 601.32 0.01 5s 4 43 steps of laser, therefore 1 step offset from loop to loop, laser already of ?
20:30 ? 2.9e7 223223 520-522 8129 601.760 - 601.320 0.01 5s 6 aborted after 3 loops, laserstabi was off, probably during hole measurement
21:01 ? 3.6e7 223223 524-528 8130 601.760 - 601.320 0.01 5s 6
21:30 ? 3.4e7 223223 529-532 8131 601.760 - 601.320 0.01 5s 6 coasting beam now !!!
22:10 ? 3.7e7 223223 534-537 8132 601.760 - 601.320 0.01 5s 6 Night shift took over.
22:40 4.4e7 3.6e7 223223 539-542 8133 601.760 - 601.320 0.01 5s 6
23:52 3.8e7 3.2e7 223223 545-548 8134 - 8135 601.760 - 601.320 0.01 5s 6 Switched off the nitrogen before this run, stopped acq. after 4 loops (laser gone), PMT north saw a lot of noise? (ID:78) -> larger files.
00:39 4.3e7 3.2e7 223222 552-555 8136 601.760 - 601.320 0.01 5s 6 The secondary DAC always requires 2-3 restarts until it is working.
01:10 3.8e7 3.0e7 223222 557-558 8137 601.760 - 601.320 0.01 5s 6 Laser moved away during the third loop, acq. stopped.
01:33 4.2e7 3.1e7 223222 561-564 8139 601.760 - 601.320 0.01 5s 6 The previous laser scan was still running, restarted the acq. once.
02:00 > 4.0e7 3.4e7 223222 566-569 8140 601.760 - 601.320 0.01 5s 6
02:30 > 4.0e7 3.2e7 223222 573-576 8141 601.760 - 601.320 0.01 5s 6
02:58 4.2e7 3.4e7 223222 579-582 8142 601.760 - 601.320 0.01 5s 6
03:45 4.2e7 3.3e7 223222 585-589 8143 601.760 - 601.320 0.01 5s 6 Back to bunched beam mode
04:15 4.7e7 3.4e7 223222 594-598 8144 601.760 - 601.320 0.01 5s 6
04:43 4.4e7 3.4e7 223222 600-604 8145 601.960 - 601.520 0.01 5s 6 We changed the scan range Big grin
05:10 4.3e7 3.3e7 223221 606-610 8146 601.960 - 601.520 0.01 5s 6 It looks like the "overWavel" plots actually work better now, because the laser steps somehow are counted wrongly, leading to shifts between loops.
05:37 4.2e7 3.7e7 223221 611-615 8147 601.960 - 601.520 0.01 5s 6
06:27 ? ? 223219 616-618 8148 601.960 - 601.520 0.01 5s 6 Since Go4 was still running during startup we were not able to look into the data during the scan. After reduction of particle number, the dc trafo is no longer capable to measure to number of ions.
06:56 ? ? 223219 619-620 8149 601.960 - 601.520 0.01 5s 6
07:25 ? ? 223219 621-622 8150 601.9 - 601.7 0.01 5s 6 Changed the scan range t0 601.9-601.7 and reduced step increment to 0,005nm
07:56 ? ? 223219 623-624 8151 601.9 - 601.7 0.01 5s 6
08:20 ? ? 223219 625-625 8152 601.9 - 601.7 0.01 5s 6 Restarted scan without new injection, DAQ2 was not running during this scan
08:44 ? ? 223220 626-627 8153 601.9 - 601.7 0.01 5s 6 Reduced Loop number to 4 (aborted after 4 completed scans)
09:03 ? ? 223220 628 8154 601.9 - 601.7 0.01 5s 6 Reduced Loop number to 3 (before starting a new scan)
09:17 ? ? 223221 629 8155 601.9 - 601.7 0.01 5s 6
Since
Entry  Mon May 16 19:20:55 2022, Max, Wilfried, Analysis, start go4 before laser scan 
It is necessary to start go4 before you start the laser scan. Otherwise you get an offset in the laser Step plots.
Entry  Mon May 16 21:08:48 2022, Rodolfo & Max, Laser, Laser power 
We checked the energy of the laser and optimized it a bit

TimeSeed energy for Cobra @ 532 nmOut of Cobra @ 601 nm
20:4141563
20:4850673


The lambda/2 is now at 108°.
Entry  Mon May 16 22:19:54 2022, Patrick, DAQ, Keep go4 running (in theory), MBS 
To accumulate more data into the opened go4, do not restart MBS, but just

sto ac
clo fi
open file lxg1297:/data.local2/208Bi/208Bi -auto -rfio
sta ac

Note: This does not work, because go4 somehow accumulates ~5 extra laser steps when starting a new scan which results in an x-axis-offset between the runs.
Entry  Mon May 16 22:57:40 2022, Patrick, Kristian, David, Ruijiu , Detectors, Switched off nitrogen 2022-05-16_PMTs_after_nitrogen_off.png
Background counts with nitrogen and air.
Less multiphoton events with air (see pictures, histogram extended to 30 with nitrogen).


Read in 4_Lasersteps/Counts

nitrogen:
XUV: 15e4
Middle: 8e4
North: 9e4

air:
XUV: 13e4
Middle: 1.2e4
North: 0.7e4
Entry  Tue May 17 00:44:01 2022, Patrick, Kristian, DAQ, Changed PMT North CFD channel 
In run 8134 - 8135 PMT North showed a super high background rate. After the scan we checked the signal cables.

Incoming signal was still good until CFD. We changed channel from 2 to 12. New threshold is 36, was 10.
Entry  Tue May 17 06:37:28 2022, YL, KM, Accelerator, Reduced beam intensity 
The resonance in 209Bi has been seen during the night.
Reducing the intensity by a factor~1000, to simulate 208Bi conditions
Running low intensity since ~6:15-6:20
The present intensity is so low that DCCT does not see the beam.
On Schottky the beam is clearly seen as ~30-40 dB over the background.
The real intensity is to be determined from the NTCap, which is running (checked).
Entry  Tue May 17 10:38:44 2022, Konstantin, Detectors, PMT North changed 
PMT located at the northern window was again replaced by the narrow-band PMT (ET Enterprise type 9423 SB, SN: 650).
Entry  Fri May 27 10:39:53 2022, Kristian, DAQ, PMT North noise IMG_20220527_095501.jpg
During the last run, PMT North showed some weird noise.

The PMT was replaced by the deep UV PMT with small aceptance range (100-200nm) but there was still a lot of noise on the output channel in the Messhütte, see attached photo. The intensity of the noise signal was as strong as a normal signal count.

I replaced all cables and used other preamplifier channels. The noise is gone and the baseline is flat now. However, the timing of PMT north will be a bit different now, so we should use PMT middle for the laser/ion overlap as we did before.

Graziano opened the valves for the laser and turned off the vacuum gauges and emergency lights. The background of the UV PMT looks normal (Middle 10 Hz, North 1 Hz) so I think we are fine here.
Entry  Fri May 27 14:57:23 2022, Rodolfo, Laser, Laser Energy 
I have started up the laser system (Q-Ray & Cobra) again. Here some parameters*:

- Q-Ray's output energy (@532 nm: 547 mJ.
- Seed energy for Cobra# (@532 nm): 504 mJ.
- Cobra's output energy (@ 601.7 nm): 71 mJ.

* all values averaged over 500 pulses.
# angle of lambda/2-plate: 107°
Entry  Fri May 27 20:39:50 2022, Carsten, Analysis, Short Manual for updated Go4 DAQ (version 2022_05_27) Short_Introduction_to_the_208Bi_Go4_Analysis.pdfShort_Introduction_to_the_208Bi_Go4_Analysis.odt
Short descriptions of the most recent version of the GO4 code is attached. I will install the corresponding vesion early on sunday.
Entry  Mon May 30 00:56:33 2022, Max, Patrick, Laser, Beam overlap 2022-05-30_laser_beam.png2022-05-30_beamstab_settings.png
The ion beam positions are (+- 1mm):


devicemove in dir.scratch (mm)gone (mm)gone +- 4.5 (mm)x0 (mm)
GECEDS1VUup -1.5 0.7 5.2
GECEDS1HAright -26 -22 -17.5 -4.7
left -10.0 -13.0 -17.5
GECEDS2VUup -2.0 0.0 4.5
GECEDS2HAright -22.0 -18.5 -14.0 3.1
left -6.0 -9.5 -14.0



Notes:
  • In between a measurement the scrapers stopped working in the device control. Therefore, we had to go into the electronics room.
  • Position to scratch charge transferred beam: S1HA at -35.
  • Beam diameter is roughly 6-7 mm (horizontally) and 4 mm vertically (as opposed to 1-2 mm).
  • The charge transferred ion beam seems to shift the position of the main beam over time (1cm / 2h) as the main beam "transfers its intensity".
Entry  Mon May 30 01:13:40 2022, Konstantin, Max, Patrick, Detectors, XUV-Detector voltage off 
XUV-Detector shows up to 100 kHz and, therefore, was turned off.