  Dielectronic recombination-assisted laser spectroscopy, Page 4 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Category Subject Text Attachments
  15   Fri May 6 16:41:57 2022 Patrick, RodolfoLaserWavemeterWe coupled the laser through a multi-mode
fiber into the wavemeter.
With the main amplifier enabled, we got enough
 Screenshot_(4).pngBi2022_laserscan_test.PNG 
  87   Mon May 30 02:33:45 2022 Patrick, MBS MaxDAQMBS procedureIt is possible to keep go4 running now. Summary
of the procedure:
  
  77   Mon May 16 22:57:40 2022 Patrick, Kristian, David, Ruijiu DetectorsSwitched off nitrogenBackground counts with nitrogen and air.
Less multiphoton events with air (see pictures,
histogram extended to 30 with nitrogen).
 2022-05-16_PMTs_after_nitrogen_off.png 
  78   Tue May 17 00:44:01 2022 Patrick, KristianDAQChanged PMT North CFD channelIn run 8134 - 8135 PMT North showed a super
high background rate. After the scan we checked
the signal cables.
  
  97   Tue May 31 03:18:52 2022 Patrick, KonstantinLaserLaser timingThe final timings are (in bins +-1):

PD NO: 103
  
  51   Wed May 11 23:34:39 2022 Patrick, CarstenDetectorsParticle Detectors / Scraper positionsVoltages of particle detectors off.

Scraper positions:
  
  54   Thu May 12 03:25:37 2022 PatrickDAQLaser scan complete signal offAs in ID:46, the 'laser scan complete' again
is not coming in.
It is not very useful to repeatedly fix cable
  
  76   Mon May 16 22:19:54 2022 PatrickDAQKeep go4 running (in theory), MBSTo accumulate more data into the opened go4,
do not restart MBS, but just
  
  65   Thu May 12 16:35:17 2022 Max, Wilfried, ZoranAcceleratorNO BEAM UNTIL TOMORROW MORNINGThe problem at the ESR septum is serious.
They have to remove the broken part and try
to repair it.
  
  49   Wed May 11 22:19:17 2022 Max, Wilfried, VolkerLaserlaser bunch timingWe overlapped the laser and ion bunch in the
time domain. The delay has to be set on the
module above the laser and NOT in the ESR
 timing10_5_22.png 
  50   Wed May 11 22:45:22 2022 Max, Wilfried, PatrickGeneralscanning wavelengthThe scan parameters for the next shift are:

in COBRACONTROL:
  
  74   Mon May 16 19:20:55 2022 Max, WilfriedAnalysisstart go4 before laser scanIt is necessary to start go4 before you start
the laser scan. Otherwise you get an offset
in the laser Step plots.
  
  104   Tue May 31 21:58:55 2022 Max, RodolfoLaserMRC Settings for 209Bi We have change the laser settings for the
spectroscopy of 209Bi. 
 MRC_209Bi_31-05-2022_2157.png 
  86   Mon May 30 02:12:20 2022 Max, Patrick, ~Konstantin, Ragan, KenRunsruns night shift 30.05.These are the first runs of the substitute
beamtime.
 2022-05-30_resonance_10_loops.png48_AM.png 
  84   Mon May 30 00:56:33 2022 Max, PatrickLaserBeam overlapThe ion beam positions are (+- 1mm):

 2022-05-30_laser_beam.png2022-05-30_beamstab_settings.png 
  63   Thu May 12 15:34:47 2022 Max, Kristian, SebastianDAQlaser scan, laser step and laser busy checkedWe checked all three signals in the Messhütte.
Laser scan and laser step are OK.
The Laser busy signal is for large increments
  
  72   Mon May 16 17:38:38 2022 Max, Danyal, Wilfried, RodolfoGenerallaser bunch timingWe overlapped the laser and ion bunch in the
time domain. 
Therefore we delayed the bunching HF in order
 timing1605.png 
  99   Tue May 31 17:22:09 2022 Max, Carsten, Danyal, Rodolfo, WilfriedGeneralchange E-cooler current I_e = 50 mA
At 17:15 we changed again the E-cooler current
I_e = 50 mA  
  
  98   Tue May 31 15:19:58 2022 Max, Carsten, DanyalGeneralscans for different E-cool currents
until 15:15 we have measured with I_e = 100
mA (3 loops per file) 
  
  64   Thu May 12 15:50:33 2022 MaxAcceleratorNo ESR beamSince 13:30 we have no beam in the ESR. There
is a problem with the ESR septum.
The magnets department is investigating.
  