1
|
Wed Jun 15 13:11:38 2022 |
Guy Leckenby | DAQ | Signal Diagram | Attached is the signal mapping that will be
used for the BEAVERTAIL test.
|
|
2
|
Fri Jun 17 15:32:47 2022 |
Guy Leckenby | Electronics | Preamp Settings | Bias Select: In general, higher bias resistors
-> lower electronic noise. However, higher
resistance = larger voltage drop due to leakage |
|
3
|
Mon Jun 20 10:36:56 2022 |
Guy Leckenby | DAQ | DAQ Startup Commands | Three terminals/processes are required to
record data on a local machine.
1. log in x86l-131.
|
|
4
|
Tue Jun 21 02:37:07 2022 |
Guy Leckenby, Iris Dillmann, Chris Griffin | General | Run notes | Beam: 208Pb(82+), 269.0 MeV/u, ~2*10^7 ions
in ESR
|
|
5
|
Wed Jun 22 18:01:18 2022 |
Guy Leckenby | Detectors | Detector Arrangment | Attached is the detector arrangement for the
3 setups used during the tests. |
|
6
|
Wed Jun 22 19:14:12 2022 |
Guy Leckenby | DAQ | FBEX Script Choices | Here were the f_user.c choices we implemented
for this experiment.
|
|
7
|
Tue Jun 28 17:42:53 2022 |
Guy Leckenby | DAQ | Cabling Changes | In the previous signal map, I incorrectly
mapped the DSSD channels. To correctly read
out the DSSD for the new test, we will swap |
|
8
|
Fri Jul 29 15:33:08 2022 |
Guy Leckenby | Electronics | Results of Noise Testing | Uwe and I were able to get some noise testing
done before the ESR was closed with asbestos
exposure. We used the new flange so didn't |
|
9
|
Mon Nov 7 14:14:38 2022 |
Chris Griffin, Guy Leckenby | Electronics | MSI-8 module details | MSI-8 module details.
MMPR1 card configurations:
|
|
10
|
Fri Nov 11 10:27:59 2022 |
Chris Griffin, Guy Leckenby | Detectors | Current leakage currents | Attached are photos of leakage currents for
the current GAGG and BGO setups.
This setup uses the new flange (blue gas |
|
11
|
Tue Nov 15 14:30:25 2022 |
Chris Griffin | Electronics | Old flange noise | Last week we tested both the new and old flanges
with the GAGG housing set up described in
the previous ELog entry.
|
|
12
|
Thu Nov 17 13:42:16 2022 |
Chris Griffin | Detectors | Detector config changes | I have changed the configuration of Housing
2 (BGO) to account for the detector being
fixed (bond wires) and provide a "plug-and-play" |
|
14
|
Mon May 29 12:23:48 2023 |
Guy Leckenby, Chris Griffin | Electronics | Old flange noise re-tests | Whilst constructing a new flange to replace
the old one, we did some tests again to compare
the performance of new vs old flange.
|
|
15
|
Thu Jun 1 09:39:24 2023 |
Guy Leckenby, Chris Griffin | Electronics | New new flange test | We tested the new new flange using the same
setup as in ELOG entry 14. The noise level
seemed to be somewhere between the middle |
|
16
|
Thu Jun 1 10:42:31 2023 |
Guy Leckenby | Electronics | Summary of Preamp Testing | MSI-8 and MPR-16 preamps have nominal differential
output ranges of +/-1.8V and +/-1.2V respectively
at maximum input (ie 5GeV).
|
|
17
|
Tue Dec 12 12:57:16 2023 |
Jan | DAQ | test lmd-files with pulser | We took a few lmd-files with different settings
of the febex DAQ to provide data for go4
development, when the DAQ is not running.
|
|