ID |
Date |
Author |
Category |
Subject |
Text |
 |
21
|
Sat May 10 00:52:21 2025 |
Finn, Simon, Konstantin, Rodolfo | DAQ | Bunching - ammendment late shift | Some 209Bi80+ beam was provided for tests
measurement over the weekend. Currently the
beam is bunched at the second harmonic, corresponding |
|
22
|
Sat May 10 03:32:18 2025 |
Finn, Simon | General | Beam not bunched (?) | We think the beam in the ESR is not bunched.
There is a clear difference in PMT signal
if ions are in the ESR compared to no ions |
 |
23
|
Sat May 10 03:46:57 2025 |
Finn, Simon | Detectors | PMT north | In contrast to PMT Mid, the difference between
ions and no ions in the ESR (see screenshot
scaler) is not visible. Signal gets higher |
|
24
|
Sat May 10 03:54:46 2025 |
Finn, Simon, Carsten | General | Night shift sum up - ammendment day shift | As the beam in the ESR is most probably not
bunched, there was not much we could do.
During the night shift we:
|
|
25
|
Sat May 10 12:58:54 2025 |
Carsten | Detectors | Scrapers do not work reliably / Scraper positions for further tests | I tried scraping with pressurized-air devices
in order to verify the beam poistion. All
4 devices that we use do not work reliable |
|
27
|
Sat May 10 17:05:24 2025 |
Konstantin | Detectors | XUV detector and copper mirror control | I attach the manual of the XUV and copper
mirror control software, which is hosted
at the Raspberry Pi (140.181.91.15) below |
 |
28
|
Sat May 10 17:47:50 2025 |
Carsten, Wilfried | Accelerator | Drifttube Cooling works | The cooling ith a tentative DRALS pattern
works well.
Cooling voltage in SC8 is now 905 V higher:
|
|
29
|
Sat May 10 20:14:47 2025 |
Rodolfo, Wilfried, Carsten | General | Lights in ESR | The light (Beleuchtung) inside the Cave have
been ON since probably yesterday evening
(9. May) when Uli was inside the cave for |
|
30
|
Sat May 10 20:53:17 2025 |
Rodolfo, Konstantin | Accelerator | Reading of E-Cooler Voltage | We do not have the reading of the electron
cooler voltage. According to Grafana the
reading of the voltage stopped at 11:53:00, |
|
31
|
Sat May 10 22:47:29 2025 |
Konstantin | DAQ | HV Divider | The readout of the hv dividers is running
again. In order to restart the acquisition
if it has crashed, connect to the raspberry |
|
32
|
Sat May 10 23:30:37 2025 |
Rodolfo | Accelerator | Ion Pumps at the target section | The ion pumps (E02VP16i and E02VP17i) which
nearby the optical detection region produce
high count rate into the photomultipiers. |
 |
33
|
Sun May 11 03:10:41 2025 |
Konstantin, Simon | Detectors | Bunched beam on PMT | We checked again the time-resolved signal
on the PMTs and after several minutes of
accumulation we saw a the bunch shapes on |
  |
34
|
Sun May 11 03:23:18 2025 |
Simon, Konstantin | Calibration | Delaytime measurement | We performed another set of delay time measurements
to substitude the broken channel of PMT middle.
We did this in two step:
|
|
35
|
Sun May 11 05:16:22 2025 |
Konstantin, Simon | Accelerator | Breeding of Lithium | We measured the breeding efficiency of Li-like
ions in the ESR and the rates are way below
the expected 25%.
|
|
36
|
Sun May 11 05:25:07 2025 |
Simon, Konstantin | General | Detector drives | Currently, the particle detectors show a weird
behavior. Sometimes they drive too far. [B]IMPORTANT:
As long as it is unclear what is the reason |
|
37
|
Sun May 11 15:42:18 2025 |
Carsten | General | Particle detector / dielectronic recombination measurements | The DR setup was put into operation yesterday
and first spectra recorded (see below).
Particle detector behind cooler ("SA_SZ") |
 |
38
|
Sun May 11 17:30:24 2025 |
Carsten, Rodolfo, Jonas | General | Accidentally Skipped Breeding Step in File 0012.LMD | At ~17:26:30 the beam process was accidentally
set to not wait on breeding, affecting the
data in file 0012.LMD |
|
39
|
Sun May 11 20:08:37 2025 |
Carsten | Runs | DR runs with DC beam | We have 4 valid DR files for DR with unbunched
beam. Iel = 500mA
run_0011.lmd
|
 |
40
|
Sun May 11 23:16:14 2025 |
Carsten | Runs | Switched back to bunching beam | At about 22:30 we switched back to the bunched
beam.
The new NTCAP directory is IQ_2025-05-11_22-37-04, |
|
41
|
Mon May 12 07:19:16 2025 |
Finn, Simon, Konstantin | DAQ | DR Measurements | During this night we recorded several DR measurements.
Before the DR, we charged bread for about
10 minutes.
|
|