ID |
Date |
Author |
Category |
Subject |
Text |
 |
62
|
Wed May 14 22:05:54 2025 |
Rodolfo | Laser | Laser settings | Here are summarized some settings of the laser
system.
|
|
63
|
Thu May 15 00:45:19 2025 |
Carsten | DAQ | DRALS preliminary timing settings (DR part) | [B]DAC control on sadpc115[/B]
[LIST]
[*] Total measurement window: 600 001 ms |
|
64
|
Thu May 15 02:14:17 2025 |
Rodolfo, Konstantin, Simon | Laser | Laser broken | The pump laser is broken!
To be more specific the YAG crystal looks |
|
65
|
Thu May 15 02:34:30 2025 |
Dimitrios, Konstantin, Simon | Accelerator | Ion beam position | We measured the ion beam position with the
T-scrapers. Not that the blades are 8mm wide,
which must be considered to calculate the |
|
66
|
Thu May 15 13:40:47 2025 |
Carsten | Runs | DR run DC with 300mA and very fine stepwidth | Just changed settings towards a new scanning
range and bunched beam.
NTCAP, now: IQ_2025-05-15_12-00-29
|
|
67
|
Fri May 16 03:19:23 2025 |
Dimitrios, Finn, Konstantin | Accelerator | Changed settings to DRALS setup | Switched to bunching: Ring HF Bucket_fill(RF_manipulation)(SC7,BP2)
changed from [3.0, 0.0] -> [3.0, 3.0]
Injections 5 | Breeding 30 |
|
68
|
Fri May 16 03:22:05 2025 |
Carsten, Dimitrios, Konstantin | Calibration | DR scan and HV Calibration against Schottky frequency (NTCAP) | DR scan and HV Calibration against Schottky
frequency (NTCAP).
Since DR measurements are presently running |
|
70
|
Fri May 16 04:56:51 2025 |
Finn, Konstantin, Dimitrios | Runs | Night shift DR runs | We conducted some more DR runes in this night
shift at I_el = 300mA:
|
|
71
|
Fri May 16 08:01:27 2025 |
Finn, Konstantin, Dimitrios | Detectors | Schottky channels | 1kHz read out trigger NTCAP
DC Trafo --> B1 SRC1
|
|
72
|
Fri May 16 08:19:00 2025 |
Danyal, Christopher, Hendrik | Runs | morning shift DR runs | We are continuing taking more DR runes in
the morning shift at I_el = 300mA:
|
|
73
|
Fri May 16 11:09:38 2025 |
Danyal, Christopher | Laser | laser damage | here are some pictures of the laser damage
The Innolas technician is here now.
The
new crystal has arrived (Wilfried just delivered |
   |
74
|
Fri May 16 15:25:54 2025 |
Rodolfo, Christopher | Laser | Pumplaser | The pump laser is back into the operation.
|
|
75
|
Fri May 16 18:37:32 2025 |
Rodolfo, Carsten, Wilfried, Zoran, Ragandeep, Nils | Laser | Timing | After some minor adjustments for the laser
done by Rodolfo, the laser is back
at ESR and visible by the PD-SO.
|
|
76
|
Fri May 16 19:22:43 2025 |
Carsten | DAQ | New vlaues for DRALS | The Timing for DRALS has changed to a 12 min
measurement window (max time for laser scan).
The duration of the laser ramp planned to |
|
77
|
Fri May 16 21:23:44 2025 |
Ragandeep, Rodolfo, Zoran, Nils | Accelerator | Ion and laser beam position | We checked the ion beam position as well as
the laser position with the two scraper in
front (north) of the e-cooler (GECEDS1VU, |
|
79
|
Fri May 16 22:15:33 2025 |
Ragandeep, Rodolfo, Zoran, Nils | Laser | Scan range laser | The scan range according to Wilfried should
be
|
|
80
|
Fri May 16 22:50:00 2025 |
Ragandeep, Rodolfo, Zoran, Konstantin, Nils | Laser | Timing Laser + Ion | We adjusted the delay of the laser according
to the signal of the PD and the PMTs. |
|
81
|
Fri May 16 22:55:36 2025 |
Dimitrios, Finn, Konstantin | Laser | Starting first laser scan | NTCAP file name: SC_2025-05-16_22-54-39
We are starting now the laser scans. Therefore |
|
82
|
Sat May 17 08:36:20 2025 |
Wilfried, Christopher, Kristian | Laser | Laser Scans in coasting beam | switched to coasting beam
bucketfill (RF manipulation) (SC7, ...):
[[3.0],[3.0]] ---> [[3.0],[0.0]]
|
|
83
|
Sat May 17 11:57:13 2025 |
Wilfried, Christopher, Kristian | Laser | Scans with bunched beam | switched to bunched beam
bucketfill (RF manipulation) (SC7, ...):
[[3.0],[0.0]] ---> [[3.0],[3.0]]
|
|