HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  LIBELLE 2025, Page 3 of 5  Not logged in ELOG logo
ID Date Author Category Subject Text Attachments
  42   Mon May 12 10:09:21 2025 Christopher, NilsAcceleratorIntervention TK Chopper - no beam for one hourAt 11am there will be an intervention for
about one hour related to the TK chopper
- hence no beam for SIS as well as ESR.
  
  43   Mon May 12 14:47:52 2025 ChristopherDAQfrequency counterFA-2 frequency counter  BG7TBL_FA-2_Frequency_Counter_Operator_Manual-62519_English_Ed.pdf 
  44   Mon May 12 21:39:49 2025 ZoranRunsDR running again with Bi209Stronger spectra than before, probably due
to a stronger overlap with the electron beam.
Open files starting with run_0022, finished
  
  45   Mon May 12 22:44:00 2025 ZoranRuns209Bi bunched beamntcap restarted (05-12_22-22-23), measuring
with bunched beam
10 min breeding time
  
  46   Mon May 12 23:34:39 2025 CarstenAnalysisSample DR SpectraSee attachment - electron current 500 mA.
First spectrum DC,
Second spectrum bunched.
 DR_209Bi_500mA_newESR_settings.pngDR_209Bi_500mA_newESR_settings_bunched.png 
  47   Tue May 13 00:05:39 2025 KonstantinCalibrationCooler HVThe DR measurement was repeated with proper
electron cooler settings. Readout of electron
cooler HV is not affected by the Grafana
  
  48   Tue May 13 00:36:27 2025 Finn, Simon, Konstantin DR measurements. Night shift.[TABLE border="1"]
Time |File | PTB 32 | PTB 33 | Ohmlabs |
ESR intensity SC8 | Typical SIS injections
  
  49   Tue May 13 00:43:31 2025 KonstantinGeneralConnection interruptConnection reset to all NUCs by accident manual
power cut.
  
  50   Tue May 13 01:21:16 2025 Konstantin, SimonAnalysisLongitudinal bunch lengthWe measured the longitudinal bunch length
for all different detectors
 Bildschirmfoto_2025-05-13_01-24-40.pngBildschirmfoto_2025-05-13_01-33-06.pngBildschirmfoto_2025-05-13_01-38-19.png 
  51   Tue May 13 12:59:49 2025 Carsten, Wilfried, Christopher, NilsGeneralSetup of ESR for 208BiIn the morning the colleagues from ESR setup
the beam for production of 208Bi81+, however
the identification (via the schottky) of
  
  52   Tue May 13 15:34:23 2025 YuriCalibrationParticle IdentificationSetting on 208Bi81+
Manipulation after accumulation and orbit
shift, before slowing down
  
  53   Tue May 13 17:46:35 2025 CarstenRunsStart of DR measurements with 208BiSame ramps as before, 8 repetitions.
ESR is set-up for breeding of 208Bi80+.
In order to reduce unwanted primary at injection
 DR_208Bi_500mA_unbunched(DC).pngDR_208Bi_500mA_unbunched(DC)_true_counts.png 
  54   Tue May 13 21:37:09 2025 CarstenRunsDR run with bunched beam / 500 mA /208Bi80+Just changed settings towards a new scanning
range and bunched beam.
Stopped and started NTCAP, now: IQ_2025-05-13_21-01-44
  
  55   Wed May 14 00:11:52 2025 Dimitrios, SimonRunsNight shift DR Bi-208[TABLE border="1"]
Time |File | PTB 32 | PTB 33 | Ohmlabs |
ESR intensity SC8 | Typical SIS injections
 Screenshot_2025-05-14_06-33-45.png 
  56   Wed May 14 02:19:46 2025 Dimitrios, SimonAnalysisLongitudinal bunch lengthWe repeated this measurement for 208-Bi. The
bunch lengths are about half as long (due
to lower space charge and consequently less
 Bildschirmfoto_2025-05-14_02-16-42.pngBildschirmfoto_2025-05-14_02-17-58.pngBildschirmfoto_2025-05-14_02-15-05.png 
  57   Wed May 14 06:31:28 2025 Dimitrios, SimonRunsDR scans @300mAWe reduced the electron cooler current to
300mA and continued measuring the DR spectrum.
  
  58   Wed May 14 08:24:39 2025 Danyal, Nils, Hendrik Day shiftRunsDR scans @300mAContinuing with the measurements of the last
shift, also at 300mA. Creating new file,
as beam got killed during last run.
  
  59   Wed May 14 11:59:39 2025 NilsAnalysisCurrent DR spectra 208BiResults so far for the DR scans @300mA e-cooler
current.
 DR_208Bi_300mA_raw.pngDR_208Bi_300mA_Time_normalized_.png 
  60   Wed May 14 12:43:43 2025 Danyal, Nils, Hendrik Day shiftRunsDR scans @300mAContinuing with the measurements of the last
shift, also at 300mA. Creating new file,
as beam got killed during last run.
  
  61   Wed May 14 19:06:51 2025 CarstenRunsDifferent pattern/ Fixes during the day new runs for 300 mA (increased intensities)During the day several things were discussed
concerning intensity and the pressurized
air devicees.
 DR_208Bi_300mA_optimized_ion_beam.pngDR_208Bi_300mA_optimized_ion_beam_cts.png 
ELOG V3.1.5-fc6679b