ID |
Date |
Author |
Category |
Subject |
54
|
Mon Jun 23 18:36:39 2025 |
Wilfried, Simon | Detectors | PMT test with LED |
We tested the PMTs again, this time with an UV LED that is mounted at a window close to the XUV detector.
PMT south showed a very clear increase in count rate from about 1 to 50 Hz.
PMT mid also showed a small increase by a few Hz.
For PMT north there was no great change between LED off and on, but we think that the count rate also very slightly increased. Note, that PMT north is also the furthest away from the LED.
Also we saw a difference between single- and multi-photon events at PMT south. |
30
|
Fri Jun 20 15:58:21 2025 |
Wilfried, Konstantin, Simon | Laser | Laser stepwidth |
From previous Bi-Beamtimes, we expect the width of the transition to be >50GHz (FWHM). The current step width is 0.002nm which corresponds to 8GHz, so the laser would be in resonance for 6 steps.
We should aim for at least 5 steps in resonance.
line width (sigma) | >20GHz
|
FWHM | ~50GHz
|
step width (fundamental) | 0.004nm (4GHz)
|
step width (doubled) | 0.002nm (8GHz)
|
|
70
|
Sat Jun 28 06:29:58 2025 |
Stefan, Simon, Konstantin | Runs | Morning shift 28.06. |
6:30 Problem with ion source, on-call service is called
7:30 There is a short in the ion source and it needs to be changed. Expected down time about 2h
10:30 Ion source was successfully changed, but while ramping up the source a power supply failed. Next on-call service is on their way to GSI.
13:00 ions are back
We changed the dye as the laser intensity was quite low. That didnt help, so Konstantin came in to change the dye cell. That did help.
No scans during morning shift. |
73
|
Sun Jun 29 06:11:49 2025 |
Stefan, Konstantin | Runs | Morning Shift 29.06. |
Time | Part. Det. Int | SIS-intensity | accumulations in ESR | cooler-HV PTB K250 | cooler-HV PTB red | cooler-HV orange | LMD-DAQ1 Files | LMD-DAQ2 Files | scan range(nm) | number of positions | dwell time (laser shots) | n loops | checked laser position | mesytec rate ok | TE slits | comments |
|
06:09 | 3300 | 2.7e9 | 40 | - | - | - | 296 | 269 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
08:49 | 16000 | 2.5e9 | 40 | - | - | - | 297 | 270 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
09:10 | 4100 | 2.6e9 | 40 | - | - | - | 298 | 271 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | slightly modified the laser position, which was necessary to ensure proper laser-ion superposition after retuning the laser, some bad injections from SIS |
09:2X | 16000 | 2.8e9 | 40 | - | - | - | 299 | 272 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
09:59 | 2200 | 2.4e9 | 40 | - | - | - | 300 | 273 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | One bad injection cycle between the previous measurement and this one. Particle detector reset lately |
10:33 | 3800 | 2.0e9 | 40 | - | - | - | 301 | 274 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
10:52 | 4200 | 2.1e9 | 40 | - | - | - | 302 | 275 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
11:17 | 4100 | 2.1e9 | 30 | - | - | - | 303 | 276 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
11:41 | 4400 | 2.1e9 | 30 | - | - | - | 304 | 277 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
11:53 | 4600 | 2.1e9 | 30 | - | - | - | 305 | 279 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | Bad (empty) injections from SIS |
12:19 | 4600 | 2.5e9 | 30 | - | - | - | 306 | 279 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | Potentially problems with transfer beam line |
12:33 | 3700 | 2.1e9 | 30 | - | - | - | 307 | 280 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
12:50 | 4300 | 2.1e9 | 30 | - | - | - | 308 | 281 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
13:07 | 18300 | 2.5e9 | 30 | - | - | - | 309 | 282 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
13:30 | 2300 | 2.5e9 | 30 | - | - | - | 310 | 283 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
14:05 | 1 | 2.5e9 | 30 | - | - | - | 311 | 284 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | Particle detector hasn't moved in |
|
We did a recalibration of the FCU. After this (7:40) a SIS power supply failure was detected, and we are waiting now for the on-call service.
HHT cave access around 10:06 during a short break due to a source failure.
Every once in a while we have empty shots from SIS. |
3
|
Wed Jun 4 16:17:47 2025 |
Simon | Detectors | Nitrogen |
The nitrogen supply for the PMTs is turned ON. |
1
|
Tue May 20 16:14:30 2025 |
Rodolfo, Simon | Detectors | PMT arrangement at ESR |
This is the arrangement of the photomultipiers at the optical detection region at ESR for Thorium 2025
PMT | Model | SN | | Operation Voltage | Threshold
|
South | ET9422B | 1042 | Broadband | -1500 V |
|
Middle | ET9423B | 653 | Smallband | -2650 V | 10 (preliminary)
|
North | ET9423B | 652 | Smallband | -2650 V | 12 (preliminary)
|
|
|
Attachment 1: PMT_Arrangement_2025-05-20.jpg
|
|
4
|
Wed Jun 4 16:18:57 2025 |
Rodolfo, Simon | Detectors | PMT dark count rates |
I adjusted the offsets of the amplifiers in the cave and measured the dark count rates :
PMT | Model | | Operation Voltage | Count rate (Hz)
|
South | ET9422B | Broadband | -1500 V | 1300
|
Middle | ET9423B | Smallband | -2650 V | 20
|
North | ET9423B | Smallband | -2650 V | 30
|
Also the MCP anode of the XUV detector is now connected to the amplifiers and fed to the data cable of "PMT Cu".
Quote: | This is the arrangement of the photomultipiers at the optical detection region at ESR for Thorium 2025
PMT | Model | SN | | Operation Voltage | Threshold
|
South | ET9422B | 1042 | Broadband | -1500 V |
|
Middle | ET9423B | 653 | Smallband | -2650 V | 10 (preliminary)
|
North | ET9423B | 652 | Smallband | -2650 V | 12 (preliminary)
|
|
|
|
5
|
Fri Jun 6 14:27:10 2025 |
Rodolfo, Konstantin | Laser | MRC Beam Stabilization Presettings |
These are the settings for the Beam Stabilization from MRC.
Laser-beam energy ca. 18 mJ @ 275 nm |
Attachment 1: MRC-Settings_2025_06-06.JPG
|
|
Attachment 2: AFG_Settings_Thorium_2025-06-06.jpg
|
|
Attachment 3: MRC-Controller_Settings_Thorium_2025-06-06.jpg
|
|
35
|
Sat Jun 21 03:06:19 2025 |
Rodolfo, Alex, Hiroshi, Anton | Laser | beam overlap with t-scrapers |
motor | ion beam position (mm) from outside | ion beam position (mm) from inside
|
GECEDS1VU | -0,5 | -
|
GECEDS1HA | -13,0 | -4,5
|
GECEDS2VU | 1,0 | -
|
GECEDS2HA | -10,5 | -0,5
|
Note: To move GECEDS1VU the corresponding horizontal drive (GECEDS1HA) has to be at -4,0 mm.
Note: To move GECEDS2VU the corresponding horizontal drive (GECEDS2HA) has to be at 2,0 mm.
GECEDS1VU (from E.outside -74.0): -1,0 (start scraping)
-0,5 (ion beam disappear)
GECEDS1VU-End.I (24,8)
GECEDS1HA (from E.outside -96,2): -13,0 (ion beam disappear)
GECEDS1HA (from E.inside -79,5): -4,5 (ion beam disappear)
GECEDS1HA (-4,0): no interlock for GECEDS1VU => drive out to End-A
GECEDS2VU (from E.outside -70.7): 1,0 (ion beam disappear)
GECEDS1VU-End.I (30,4)
GECEDS2HA (from E.outside -86,4): -10,5 (ion beam disappear)
GECEDS2HA (from E.inside 78,6): -0,5(ion beam disappear) |
Attachment 1: 2025-06-21_05-14-39-706.png
|
|
Attachment 2: 2025-06-21_05-22-21-447.png
|
|
Attachment 3: 2025-06-21_05-27-59-895.png
|
|
Attachment 4: 2025-06-21_05-31-37-019.png
|
|
Attachment 5: MRC-settings_Th-Beam_2025-06-21.JPG
|
|
17
|
Tue Jun 17 19:25:30 2025 |
Rodolfo | Accelerator | T-Scrapers in E-Cooler |
Here are the instructions to drive the T-Scrapers inside the ESR Electron Cooler
- ECEDS1VU: Verriegelt mit ECEDS1HA. Der Antrieb kann nur fahren
wenn der Antrieb ECEDS1HA in Position -4,0 steht.
- ECEDS1HA: Verriegelt mit ECEDS1VU. Der Antrieb kann nur fahren
wenn der Antrieb ECEDS1VU in Stellung EI steht.
- ECEDS2VU: Verriegelt mit ECEDS2HA. Der Antrieb kann nur fahren
wenn der Antrieb ECEDS2HA in Position 0,0 steht.
- ECEDS2HA: Verriegelt mit ECEDS2VU. Der Antrieb kann nur fahren
wenn der Antrieb ECEDS2VU in Stellung EI steht.
According to Boywitt/Schuhmacher, BEA-MEI. Date: 28.07.2021 |
Attachment 1: Scrapereinstellung_am_E-Kühler.pdf
|
|
21
|
Wed Jun 18 03:12:25 2025 |
Rodolfo | Laser | Beam Stabilization |
The laser beam pointing has changed, even thought the MRC settings are the same as given in Entry 5 (this elog). This could be caused by a droping of the laser output energy which is now 13,8 mJ @275 nm |
Attachment 1: MRC-Settings_2025_06-18.JPG
|
|
31
|
Sat Jun 21 00:23:22 2025 |
Rodolfo | Laser | Dye |
I have prepared new (fresh) dye solutions of Fluorescein 27: 2 charges. They are in the Safety Cabinet (Sicherheitsschrank) in the ESR Laser lab |
Attachment 1: Farbstoff_FL27.jpg
|
|
60
|
Wed Jun 25 05:53:54 2025 |
Rodolfo | Laser | FCU |
Cobra's FCU was recalibrated. Table saved as FCU_547-554_RS_2024-06-25.fcu. |
42
|
Sat Jun 21 21:55:18 2025 |
Peter, Danyal, Marek | Detectors | PMT rates |
We have made two foam rings (outer diameter ca. 70 mm with a thickness of 10 mm each and placed them successively underneath PMT north.
ring 1: ID = 55 mm
ring 2: ID = 47 mm
Without rings we had measured ca. 20 counts per channel in a time of about 7 minutes. (1st picture below)
With ring 1 we have measured ca. 18 counts per channel in 7 mins.
with ring 1 and ring 2 we have measured ca. 15 counts per channel in 7 mins. (2nd picture below)
It is clear that the rate of PMT north decreases with increasing distance from the beampipe.
At this point it is not yet clear to us if the experiment will benefit from the 2 rings.
If the rings should be implemented, we propose to have one proper ring (20 mm high) made by the mechanical workshop. |
Attachment 1: no_rings_under_PMT_north.png
|
|
Attachment 2: 2_rings_under_PMT_north.png
|
|
43
|
Sat Jun 21 22:33:04 2025 |
Peter , Danyal | Detectors | PMTs are switched off |
We have switched off all 3 PMTs ! |
68
|
Fri Jun 27 14:23:39 2025 |
Nils, Wilfried, Carsten, Julian | Runs | Runs afternoon shift 27.06. |
15:30 We have a break due to an issue at UNILAC (quadrupole failed). Also radiation safety interlock was triggered at the fragment separator. This also pushed a faradaycup into the ESR (GE01DC3VP).
Just before the issue during the last bunching, the peak was misaligned to the marker in the Schottky. The marker was sitting on the right flank. So the electron-cooled 229Th did not match with the bunching frequency anymore. We are preparing to adjust the cooler voltage to fix this. For some reason the frequency recovered and is back to its original position. However, our accumulations do not seem to work as well as before, we stagnate much earlier and at a much lower level.
15:50 Beam is back, Carsten is still investigating the drop in intensity we saw before the UNILAC failure.
17:15 TE slits were on -8 and +8, opening to -11 and +11, no change to acquisition pattern, something is still wrong
18:00 We were locked out by HHT people for 30+ mins
18:27 We had to call in ESR support
Time | Part. Det. Int | SIS-intensity | accumulations in ESR | cooler-HV PTB K250 | cooler-HV PTB red | cooler-HV orange | LMD-DAQ1 Files | LMD-DAQ2 Files | scan range(nm) | number of positions | dwell time (laser shots) | n loops | checked laser position | mesytec rate ok | comments
|
14:24 | 15800 | 2.74 e9 | 30 | 104524 | 104527 | 104528 | 196 | 224 | 551.91 - 549.41 | 501 | 15 | 1 | yes | yes |
| Carsten optimizing beam at HKR with ESR colleagues
|
14:24 | 6800 | 1.16 e9 | 30 | 104524 | 104527 | 104528 | 197 | 225 | 551.91 - 549.41 | 501 | 15 | 1 | yes | yes |
| Carsten is back in measurement hut
|
16:30 | 1100 | 1.1 e9 | 40 | 104524 | 104527 | 104528 | 198 | 226 | 551.91 - 549.41 | 501 | 15 | 1 | yes | yes |
| Searching for reason for small particle number
|
17:00 | 1200 | 0.5 e9 | 30 | 104524 | 104527 | 104528 | 199 | 227 | 551.91 - 549.41 | 501 | 15 | 1 | yes | yes |
|
|
19:57 | 7800 | 1e9 | 30 | 104524 | 104527 | 104528 | 200 | 228 | 551.91 - 549.41 | 501 | 15 | 1 | yes | yes |
| Restarting some things at ESR
|
20:16 | 6800 | 1.5e9 | 30 | 104524 | 104527 | 104528 | 201 | 229 | 551.91 - 549.41 | 501 | 15 | 1 | yes | yes |
| Restarting some things at ESR
|
20:41 | 7200 | 1.5e9 | 30 | 104524 | 104527 | 104528 | 202 | 230 | 551.91 - 549.41 | 501 | 15 | 1 | yes | yes |
| Restarting some things at ESR
|
21:28 | 6000 | 2.65e9 | 30 | 104524 | 104527 | 104528 | 203 | 231 | 551.91 - 549.41 | 501 | 15 | 1 | yes | yes |
|
|
21:47 | 6600 | 2.7e9 | 30 | 104524 | 104527 | 104528 | 204 | 232 | 551.91 - 549.41 | 501 | 15 | 1 | yes | yes |
|
|
22:08 | 17000 | 2.5e9 | 30 | 104524 | 104527 | 104528 | 205 | 233 | 551.91 - 549.41 | 501 | 15 | 1 | yes | yes | TE slits -7 +7
|
|
| |
72
|
Sun Jun 29 03:03:56 2025 |
Nadine, Finn | Runs | Night shift runs with laser |
around 22:00 water cooling circuit failure of ESR electron cooler--> ~1h downtime
Wavemeter frequently overexposed around 549,3nm; other wavelengths are fine
Time | Part. Det. Int | SIS-intensity | accumulations in ESR | cooler-HV PTB K250 | cooler-HV PTB red | cooler-HV orange | LMD-DAQ1 Files | LMD-DAQ2 Files | scan range(nm) | number of positions | dwell time (laser shots) | n loops | checked laser position | mesytec rate ok | TE slits | comments |
|
23:25 | 13500 | 2.5e9 | 40 | - | - | - | 274 | 247 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
23:42 | 5000 | 2.5e9 | 40 | - | - | - | 275 | 248 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
00:02 | 5700 | 2.8e9 | 40 | - | - | - | 276 | 249 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
00:26 | 5000 | 3e9 | 30 | - | - | - | 277 | 250 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
00:40 | 5300 | 2.8e9 | 30 | - | - | - | 278 | 251 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
00:55 | 5550 | 3e9 | 30 | - | - | - | 279 | 252 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
01:13 | 16800 | 3e9 | 40 | - | - | - | 280 | 253 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
01:32 | 13300 | 3e9 | 50 | - | - | - | 281 | 254 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
01:50 | 13700 | 3e9 | 40 | - | - | - | 282 | 255 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
02:07 | 14450 | 3e9 | 40 | - | - | - | 283 | 256 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
02:24 | 13800 | 2.8e9 | 40 | - | - | - | 284 | 257 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
02:41 | 12600 | 2.8e9 | 40 | - | - | - | 285 | 258 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | not properly scraped; right peak -100dB |
02:58 | 13200 | 3e9 | 40 | - | - | - | 286 | 259 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
03:15 | 13700 | 2.7e9 | 40 | - | - | - | 287 | 260 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
03:32 | 3400 | 2.7e9 | 40 | - | - | - | 288 | 261 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
03:45 | 5000 | 2.7e9 | 40 | - | - | - | 289 | 262 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
04:12 | 3700 | 3e9 | 50 | - | - | - | 290 | 263 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
04:30 | 4100 | 3e9 | 40 | - | - | - | 291 | 264 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
04:47 | 12800 | 3e9 | 40 | - | - | - | 292 | 265 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
05:10 | 2800 | 2.7e9 | 60 | - | - | - | 293 | 266 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | file 266 was not closed until next file should be opend! Happens at 5:24 in the Morning |
05:28 | 12200 | 2.7e9 | 40 | - | - | - | 294 | 267 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
05:57 | 15000 | 2.7e9 | 40 | - | - | - | 295 | 268 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
06:09 | 00 | 2.7e9 | 40 | - | - | - | 296 | 269 | 550.610 - 548.110 | 501 | 15 | 1 | yes | yes | TE slits -9 +5.5 | |
| |
6
|
Wed Jun 11 11:20:23 2025 |
Konstantin, Simon | DAQ | octal gate generator delays |
We checked the set delays of the OG 8000 octal gate generator and compared them with the values measured before the Bi-beamtime (see entry 34).
All values match within an uncertainty of <1ns
| OG 8000 delay / ns |
Photodiode North | 62 |
Photodiode South | 66.2 |
PMT South | 157.5 |
PMT Middle | 156.6 |
PMT North | 159.4 |
Particle South | 329.8
|
|
11
|
Fri Jun 13 18:14:02 2025 |
Konstantin, Carsten | DAQ | DAQ Folder |
Dryrun of DAQs. Folders of the data are:
DAQ1 file | DAQ2 file | scan range | laser steps | comment |
/data.local2/2025_229Th/2025_229ThDAQ1_0090.lmd | /mnt/raw.data/229Th2025/Th25DAQ2_0106.lmd - */Th25DAQ2_0107.lmd | 550.4 - 549.6 | 201 | |
91 | 108 - 111 | 550.4 - 549.6 | 201 | |
92 | 112 | 550.4 - 549.6 | 201 | Changed step logic of Medusa back to previous version before the start of this run |
93 | 113 | 550.4 - 549.6 | 201 | |
94 | 114 | 550.4 - 549.6 | 201 | |
95 | 115 - 116 | 550.4 - 549.6 | 201 | |
96 | 117 | 550.4 - 549.6 | 201 |
|
Data were recorded with a synthesized RF of 1.5MHz |
12
|
Mon Jun 16 07:26:01 2025 |
Konstantin | DAQ | Startup of Medusa and DAQ1 |
The laser control software (Medusa) is hosted on the Windows PC ATPPC023. First connect via the command
atplaser@lxg1297:~$ xfreerdp /w:2500 /h:1400 /u:atplaser /v:atppc023.campus.gsi.de
You will be asked for the usual "atplaser" password. Please be aware that you're typing on an english keyboard!
Medusa is simply started by the link on the Desktop called "Medusa Laser Control". After startup you will see the main window (Attachment 1).
Please make also sure that the Wavelength meter software is running!!! Otherwise, wavelengths cannot be logged
In the main window different actions can be made (see also Attachment 2):
- Open additional views, options are "Display" (figure of recent values), "MBS Messenger" (connection status with MBS, lower part of Attachment 2), "Devices View" (most recent values of different devices, right part of Attachment 2)
- Make sure that "Make Data Available to MBS" is selected
- Definition of laser scan Parameters. The laser will perform an automated scan between the selected wavelengths. It's possible to define an increment or a number of laser steps as scan parameter. After the laser has received the specified number of rising edges on Trigger port #1 (Do not change the port number, since this corresponds to the Hardware setting!) the laser advances to the next frequency until the number of steps and scan repetitions is completed. There is an option to start the laser scan automatically, when a trigger was received on port #3 (The cabling is done. However, the pulse generation must be provided from SCU sddsc221 channel IO1 of timing receiver tr1 whenever needed).
- The button can be used to start and stop a scan. In some cases there might occur an USB communication error with the laser, which can also be reset by this button.
- IMPORTANT NOTE: Make sure that the FCU is enabled, since otherwise the BBO of the FCU does not follow the wavelength of the laser, which results in NO UV output power.
- After "Make Data Available to MBS" option (see 2.) has been selected, Medusa is awaiting the MBS client to connect.
- View of most recent parameter settings.
The complete startup routine to perform a laser scan is the following:
- Start medusa as described above
- Connect to "r4l-41":
atplaser@lxg1297:~$ ssh atplaser@r4l-41
- Change to the directory of the Th-MBS version:
R4L-41 > cd mbsrun/E0052/DAQ1
- Make a reset (optional):
R4L-41 > resl
- Start mbs:
R4L-41 > mbs
- Once you are in the mbs environment start the acquisition:
mbs > @startup
- Connect to the file server:
mbs > @connectdisk
- Start acquisition:
mbs > sta ac
With this command, the connection to the Medusa server should be established. This can be verified by the line
-R4L-41 :read_meb :connected succesfully to LabView Server.
of the MBS output, and in the MBS Messenger View of Medusa stating
Connected! Established connection to ...
- Open file:
mbs > @openfile
- Press Run-button in the Go4 analysis (must be started beforehand)
- Start laser scan in medusa
- Press Stop-button in the Go4 analysis
- Close file:
mbs > @closefile
As long as nothing crashes (keep fingers crossed), only steps 9-13 need to be repeated for subsequent scans. |
Attachment 1: MedusaStartup.JPG
|
|
Attachment 2: Medusa.png
|
|