HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205, Page 1 of 9  Not logged in ELOG logo
IDdown Date Author Category Subject Text Attachments
  184   Wed Aug 25 15:13:41 2021 JanDAQSC13 clock frequencyThe frequency of the clock used as reference
in scaler channel 13 has been measured precisely.
In contrast to what was expected (1.5MHz
  
  183   Sun May 30 12:09:00 2021 RaganGeneralNTCAPAttached is the info given by Carsten.
The instructions to operate NTCAP are given
on https://wiki.gsi.de/ESR_EXP/ManualOfNTCAP
 ntcap_carsten.pdf 
  182   Mon Mar 29 16:31:09 2021 Pierre-MichelDAQcross section(1.393*^-8 + 3.18*^-13 + 4.707*^-8)/4.707*^-8
= 1.29595
 Pb81onAr.png 
  181   Tue Dec 15 09:25:41 2020 JanDAQSiCsIPhos signal/amplitude reconstruction   amps.pdf 
  180   Tue Dec 8 15:47:07 2020 JanDetectorsmanual preamp & shaper settings for CsISiPhosattached is a document showing fotos of all
involved amplifiers in the chain to document
the manual settings active during the experiment.
 amp_settings.pdf 
  178   Thu Nov 19 09:14:40 2020 JanDetectorsremote MSCF settings for CsISiPHOSAttached is a list of all set values for the
5 MSCF shaper modules.
This was done prior to run0251, which served
 setting.1585477986det_mapping.png 
  177   Thu Nov 5 15:13:43 2020 JanAnalysisroot script exampleAttached is an example root script/macro that
shows how to use scripts for analysis.
 e121_analysis.Ce121_mapped.he121_raw.h 
  176   Mon Nov 2 16:45:55 2020 JanDAQf_user & mbslogAttached is the f_user.c and the mbslog.l
files.
The readout function is for the following
 f_user.cmbslog.l 
  175   Thu Oct 1 22:20:03 2020 JanDAQfinal unpacker configWe identified an issue with randomly missing
adc channels in all lmd-files before run
0273.
 E121.specdet_mapping.hh 
  174   Wed Aug 5 17:19:16 2020 Rui-Jiu ChenAnalysisData structure   DataStructure.pdf 
  173   Mon Apr 20 11:17:18 2020 RaganGeneralLogbook   logbook.pdfcombined_FRS.pdfcombined_data.pdf 
  172   Fri Apr 17 18:27:34 2020 ruijiuAnalysisbackup data1.connect USB harddisk  to computer lxg1254
and  copy data to sever.
 IMG_20200417_162202.jpg 
  171   Thu Apr 9 11:47:28 2020 ruijiu backup data2020.4.8  12:00Started copying 
data。
2020.4.9    11:52 Copied 6.3TB 
 IMG_20200409_113155.jpg 
  170   Thu Apr 9 11:16:35 2020 RaganGeneralMeasurements done in the experiment   storage11.pdfstorage12.pdfstorage13.pdf 
  169   Mon Apr 6 20:03:50 2020 RaganGeneralExperiment finished ))E121 experiment is finished with the last
10 hours measurement at 19:47 ))
Many thanks to everyone for there significant
  
  168   Mon Apr 6 14:57:04 2020 ShahabRunscooler downcooler component GECEBG2T again had to be
reset.
  
  167   Mon Apr 6 14:17:54 2020 Yuri, ShahabRunsFRS valvesWe saw reduction in ESR beam life. It turned
out that FRS has opened valves and venting
caused us reduction of the quality of vacuum
 2020-04-06_14-22-20-965.png 
  166   Mon Apr 6 09:34:58 2020 ShahabRunsPictures from one and a half hour measurementcheers!  wideband_rec_001.PNG 
  165   Mon Apr 6 08:37:02 2020 Ragan, Shahab, Pierre-MichelRuns10 hour measurement (S2: 0/35 mm and S6: -20/7 mm)beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 10 hr
 8x 
  164   Mon Apr 6 05:43:50 2020 Ragan, Laszlo, NikosRunsOne and a half hour measurement (S2: 0/35 mm and S6: -20/7 mm)beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1.5 hr
 2020-04-06_06-18-59-809.png946073FA-3077-4CBF-900B-565BD19CF040.jpeg10FEB6AE-653B-4803-9927-EEB5BF33D3ED.jpeg2020-04-06_08-03-40-493.png 
ELOG V3.1.5-fc6679b