HOME
ESR
EXPERIMENTS
LABS etc
|
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
E0075
E0203_E0018
E0052_2025
|
Bound beta decay experiment on Tl-205, Page 4 of 9 |
Not logged in |
 |
|
New entries since: | Thu Jan 1 01:00:00 1970 | |
Mon Mar 30 04:30:17 2020, Sergiy, Dima, Runs, Second measurement with 206Pb81+ beam at I_cooler = 200 mA
|
Thu Feb 27 14:04:12 2020, Ruijiu Chen, Detectors, Remote control of HV module
|
Thu Apr 2 09:21:19 2020, Ruijiu, Runs, 2nd measurement with 2 hrs storage time (repeat)
|
Wed Aug 5 17:19:16 2020, Rui-Jiu Chen, Analysis, Data structure
|
Thu Apr 2 21:03:40 2020, Ragan, Yuri, Sergey, Nikos, Runs, Zero hour measurement (S2:-10/35 mm)
|
Thu Apr 2 21:10:57 2020, Ragan, Yuri, Sergey, Nikos, Runs, One hour measurement (S2:-10/35 mm)
|
Thu Apr 2 02:38:32 2020, Ragan, Yuri, Sergey, Esther, Oliver, Runs, First measurement with zero storage time
|
Thu Apr 2 02:46:57 2020, Ragan, Yuri, Sergey, Esther, Oliver, Runs, Measurement with 2 hrs storage time
|
Mon Apr 6 08:37:02 2020, Ragan, Shahab, Pierre-Michel, Runs, 10 hour measurement (S2: 0/35 mm and S6: -20/7 mm) 8x
|
Sat Apr 4 15:59:16 2020, Ragan, Shahab, Alex, Esther, Runs, 0.5 hour measurement (S2: 0/35 mm and S6: -20/7 mm)   
|
Sat Apr 4 10:32:16 2020, Ragan, Shahab, Runs, Five hour measurement (S2: 0/35 mm and S6: -20/7 mm)  
|
Sun Apr 5 10:31:08 2020, Ragan, Shahab, Runs, Two hour measurement (S2: 0/35 mm and S6: -20/7 mm)    
|
Sun Apr 5 13:05:43 2020, Ragan, Shahab, Runs, Zero measurement (S2: 0/35 mm and S6: -20/7 mm)   
|
Sat Mar 28 11:07:49 2020, Ragan, RuiJiu, Tino, , General, Nikos is changing gas jet target
|
Sat Mar 28 11:00:14 2020, Ragan, RuiJiu, Mei, Yuri, Tino, Detectors, Movement of detector 
|
Sat Mar 28 11:20:10 2020, Ragan, RuiJiu, Mei, Yuri, Tino, General, Reducing beam intensity in ESR
|
Sat Mar 28 11:28:11 2020, Ragan, RuiJiu, Mei, Yuri, Tino, General, ESR open
|
Sat Mar 28 14:19:24 2020, Ragan, RuiJiu, Mei, Yuri, General, Instructions to change the electron cooler current
|
Sat Apr 4 23:44:22 2020, Ragan, RuiJiu, Laszlo, Runs, Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm)    
|
Sat Mar 28 16:29:27 2020, Ragan, RuiJiu, Esther, General, Malfunction of several ESR machines
|
|