ID |
Date |
Author |
Category |
Subject |
Text |
|
9
|
Tue May 28 08:36:14 2019 |
Jan | DAQ | MBS start & RFIO server | You need a DAQ-PC and the RIO crate computer.
All of the DAQ proceedures laid out here
are operated from inside the DAQ screen session.
|
|
28
|
Sat Mar 28 04:50:34 2020 |
Ragan | Detectors | MWPC | Alex and Pierre-Michel applied 1500 V to the
anode and adjusted the threshold in Messhute.
x1 signal was small & noisy and rest of the |
|
61
|
Sun Mar 29 21:55:47 2020 |
Ragan | General | MWPC | Alex goes to Messhute to check the signals
from MPWC. After he completes, we start with
the measurements with the primary beam ) |
|
42
|
Sat Mar 28 16:29:27 2020 |
Ragan, RuiJiu, Esther | General | Malfunction of several ESR machines | The HKR crew informs us that several machines
in ESR are showing malfunctions.
The on-call expert cannot be reached.
|
|
115
|
Thu Apr 2 02:46:57 2020 |
Ragan, Yuri, Sergey, Esther, Oliver | Runs | Measurement with 2 hrs storage time |
|
|
118
|
Thu Apr 2 07:01:32 2020 |
Ragan, Esther, Oliver | Runs | Measurement with 4 hrs storage time | beam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: 4 hrs
|
|
170
|
Thu Apr 9 11:16:35 2020 |
Ragan | General | Measurements done in the experiment | |
|
29
|
Sat Mar 28 11:00:14 2020 |
Ragan, RuiJiu, Mei, Yuri, Tino | Detectors | Movement of detector | 10:51 am the CsISiPHOS is moved to 65 mm from
60 mm.The spot on the DSSSD is changed by
5 mm which confirms the hit of the beam.
|
|
183
|
Sun May 30 12:09:00 2021 |
Ragan | General | NTCAP | Attached is the info given by Carsten.
The instructions to operate NTCAP are given
on https://wiki.gsi.de/ESR_EXP/ManualOfNTCAP |
|
21
|
Fri Mar 27 13:40:54 2020 |
Ragan | General | NTCap start and shutdown information | The attachment contains information on how
to start and shutdown NTCap and bridge computer. |
|
139
|
Fri Apr 3 17:55:13 2020 |
Shahab | Runs | Nice picture from 205-Tl | In this high contrast Schottky recording,
the main three frequency peaks are resolved
w.r.t. time from left to right:
|
|
30
|
Sat Mar 28 11:07:49 2020 |
Ragan, RuiJiu, Tino, | General | Nikos is changing gas jet target | The gas jet target is now being changed from
H2 to Ar by Nikos. |
|
148
|
Sat Apr 4 17:32:01 2020 |
Ragan, Alex, Esther | General | No beam in ESR | The beam is coming from SIS but doesn't arrive
in ESR because the quadrupole magnets in
ESR have failed.
|
|
164
|
Mon Apr 6 05:43:50 2020 |
Ragan, Laszlo, Nikos | Runs | One and a half hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1.5 hr
|
|
126
|
Fri Apr 3 01:22:13 2020 |
Ragan, Pierre-Michel, Dima | Runs | One hour measurement (S2: 0/35 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hr
|
|
123
|
Thu Apr 2 21:10:57 2020 |
Ragan, Yuri, Sergey, Nikos | Runs | One hour measurement (S2:-10/35 mm) | beam: 205Tl81+ (no scraping, Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hrs
|
|
161
|
Sun Apr 5 23:28:01 2020 |
Ragan, Alex, Esther | Runs | One-hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hr
|
7x |
166
|
Mon Apr 6 09:34:58 2020 |
Shahab | Runs | Pictures from one and a half hour measurement | cheers! |
|
25
|
Fri Mar 27 20:52:31 2020 |
Ragan | General | Plans for the measurement with 206Pb81+ | We plan to measure:
1. Lifetime of H-like 206Pb81+ beam with |
|
132
|
Fri Apr 3 10:06:15 2020 |
Shahab | Runs | Plots from Scopes | Just two plots from the scopes for documentation:
magnets.png:
|
|