HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205, Page 4 of 9  Not logged in ELOG logo
ID Date Authorup Category Subject Text Attachments
  113   Thu Apr 2 02:36:48 2020 RaganGeneralStochastic cooling and orbit problemOn 1 April by 5 pm, we could stop the stochastic
cooling after the stacking process and also
change the orbit of the Tl beam to centre.
  
  117   Thu Apr 2 06:25:13 2020 RaganRunsTemplatebeam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: ___ hrs
  
  121   Thu Apr 2 15:24:15 2020 RaganGeneralHow to know whether electron cooling is workingFor Alle and Kuehler the bottom left status
should look like as shown in pictures below.
 IMG_8238.JPGIMG_8239.JPG 
  143   Sat Apr 4 03:06:12 2020 RaganGeneralInstructions if electron cooler goes off during long storage time measurementsPlease read the attachment.  electron_cooler.pdf 
  169   Mon Apr 6 20:03:50 2020 RaganGeneralExperiment finished ))E121 experiment is finished with the last
10 hours measurement at 19:47 ))
Many thanks to everyone for there significant
  
  170   Thu Apr 9 11:16:35 2020 RaganGeneralMeasurements done in the experiment   storage11.pdfstorage12.pdfstorage13.pdf 
  173   Mon Apr 20 11:17:18 2020 RaganGeneralLogbook   logbook.pdfcombined_FRS.pdfcombined_data.pdf 
  183   Sun May 30 12:09:00 2021 RaganGeneralNTCAPAttached is the info given by Carsten.
The instructions to operate NTCAP are given
on https://wiki.gsi.de/ESR_EXP/ManualOfNTCAP
 ntcap_carsten.pdf 
  148   Sat Apr 4 17:32:01 2020 Ragan, Alex, EstherGeneralNo beam in ESRThe beam is coming from SIS but doesn't arrive
in ESR because the quadrupole magnets in
ESR have failed.
  
  149   Sat Apr 4 18:29:44 2020 Ragan, Alex, EstherRuns0 hour measurement (S2: 0/35 mm and S6: -20/7 mm)beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
 2020-04-04_18-27-53-442.png2020-04-04_18-41-54-901.pngF5D184AC-FB3E-4F9F-B839-F71BC55C0996.jpegE4176CCB-1828-4E2E-85FB-0AC4BDC2808B.jpeg 
  150   Sat Apr 4 18:57:49 2020 Ragan, Alex, EstherGeneralTiming problem with SIS & ESR and problems with stackingThere are further problems with beam stacking
in ESR. It works occasionally but keeps failing.
There is also timing problem between SIS
  
  151   Sat Apr 4 19:55:37 2020 Ragan, Alex, EstherRunsFailed measurement...Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm)FAILED - measurement was stopped by sudden
loss of the beam 
 2020-04-04_19-54-47-760.png2020-04-04_20-02-26-363.png 
  158   Sun Apr 5 15:28:35 2020 Ragan, Alex, EstherRunsFour hour measurement (S2: 0/35 mm and S6: -20/7 mm)beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 4 hr
 7x 
  159   Sun Apr 5 20:23:02 2020 Ragan, Alex, EstherRunsHalf-hour measurement (S2: 0/35 mm and S6: -20/7 mm)beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
 7x 
  160   Sun Apr 5 21:50:02 2020 Ragan, Alex, EstherRunsHalf-hour measurement (S2: 0/35 mm and S6: -20/7 mm)beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
 7x 
  161   Sun Apr 5 23:28:01 2020 Ragan, Alex, EstherRunsOne-hour measurement (S2: 0/35 mm and S6: -20/7 mm)beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hr
 7x 
  116   Thu Apr 2 05:00:44 2020 Ragan, Esther, OliverRunsSecond measurement with 2 hrs storage timeElectron cooler was off here. Thus, this measurement
is not what we needed.
(in the picture below, it can be seen that
 734CA93E-95FD-4C6E-8E90-8DCD961E4352.jpeg 
  118   Thu Apr 2 07:01:32 2020 Ragan, Esther, OliverRunsMeasurement with 4 hrs storage timebeam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: 4 hrs
  
  162   Mon Apr 6 01:02:00 2020 Ragan, Laszlo, NikosRunsThree hour measurement (S2: 0/35 mm and S6: -20/7 mm)beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 3 hr
 9x 
  163   Mon Apr 6 05:28:55 2020 Ragan, Laszlo, NikosRunsZero hour measurement (S2: 0/35 mm and S6: -20/7 mm)beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
 46C168E2-D1D5-4CD3-B87F-7F82D045D527.jpegC55A1803-E814-412F-B3DC-40FE24946F8A.MOV75662B09-68EE-49FD-9BB2-71766305ECF8.jpeg1C0040AA-3CE4-4019-B85E-0049EBE85384.jpeg2020-04-06_05-40-47-352.png 
ELOG V3.1.5-fc6679b