Mon Apr 6 05:43:50 2020, Ragan, Laszlo, Nikos, Runs, One and a half hour measurement (S2: 0/35 mm and S6: -20/7 mm)
|
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1.5 hr
|
Mon Apr 6 08:37:02 2020, Ragan, Shahab, Pierre-Michel, Runs, 10 hour measurement (S2: 0/35 mm and S6: -20/7 mm) 8x
|
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 10 hr
|
Mon Apr 6 09:34:58 2020, Shahab, Runs, Pictures from one and a half hour measurement
|
cheers! |
Mon Apr 6 14:17:54 2020, Yuri, Shahab, Runs, FRS valves
|
We saw reduction in ESR beam life. It turned out that FRS has opened valves and venting caused us reduction of the quality of vacuum in ESR leading to beam
loss. We manged to closed GEE5VV so that now beam is stable somehow.
|
Mon Apr 6 14:57:04 2020, Shahab, Runs, cooler down
|
cooler component GECEBG2T again had to be reset. |
Mon Apr 6 20:03:50 2020, Ragan, General, Experiment finished ))
|
E121 experiment is finished with the last 10 hours measurement at 19:47 ))
Many thanks to everyone for there significant contributions )) |
Thu Apr 9 11:16:35 2020, Ragan, General, Measurements done in the experiment
|
|
Thu Apr 9 11:47:28 2020, ruijiu, , backup data
|
2020.4.8 12:00Started copying
data。
2020.4.9 11:52 Copied 6.3TB
|
Fri Apr 17 18:27:34 2020, ruijiu, Analysis, backup data
|
1.connect USB harddisk to computer lxg1254 and copy data to sever.
sync -rtmv --progress --checkSUD /media/sdgl/data/ litv-exp@sbk0l9:/lustre/ap/litv-exp/2020-
|
Mon Apr 20 11:17:18 2020, Ragan, General, Logbook
|
|
Wed Aug 5 17:19:16 2020, Rui-Jiu Chen, Analysis, Data structure
|
|
Thu Oct 1 22:20:03 2020, Jan, DAQ, final unpacker config
|
We identified an issue with randomly missing adc channels in all lmd-files before run 0273.
This led to errors in the unpacking process.
|
Mon Nov 2 16:45:55 2020, Jan, DAQ, f_user & mbslog
|
Attached is the f_user.c and the mbslog.l files.
The readout function is for the following setup:
3x ADC CAEN V785
|
Thu Nov 5 15:13:43 2020, Jan, Analysis, root script example
|
Attached is an example root script/macro that shows how to use scripts for analysis.
Usage:
|
Thu Nov 19 09:14:40 2020, Jan, Detectors, remote MSCF settings for CsISiPHOS
|
Attached is a list of all set values for the 5 MSCF shaper modules.
This was done prior to run0251, which served as a final benchmark for those settings.
See: https://elog.gsi.de/esr/E121/62
|
Tue Dec 8 15:47:07 2020, Jan, Detectors, manual preamp & shaper settings for CsISiPhos
|
attached is a document showing fotos of all involved amplifiers in the chain to document the manual settings active during the experiment.
Summary:
|
Tue Dec 15 09:25:41 2020, Jan, DAQ, SiCsIPhos signal/amplitude reconstruction
|
|
Mon Mar 29 16:31:09 2021, Pierre-Michel, DAQ, cross section
|
(1.393*^-8 + 3.18*^-13 + 4.707*^-8)/4.707*^-8 = 1.29595 |
Sun May 30 12:09:00 2021, Ragan, General, NTCAP
|
Attached is the info given by Carsten.
The instructions to operate NTCAP are given on https://wiki.gsi.de/ESR_EXP/ManualOfNTCAP |
Wed Aug 25 15:13:41 2021, Jan, DAQ, SC13 clock frequency
|
The frequency of the clock used as reference in scaler channel 13 has been measured precisely.
In contrast to what was expected (1.5MHz precisely), it is:
|