HOME
ESR
EXPERIMENTS
LABS etc
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
E0075
dN=0 experiment, all entries
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Category --
Analysis
Calibration
DAQ
General
Runs
Detectors
SlowControl
28 Entries
Goto page
1
,
2
ID
Date
Author
Category
Subject
Text
1
Tue Mar 23 08:39:11 2021
Martino Trassinelli
Target triggers
Settings for the event triggers (on left -
machine 6 event 32 / off right - machine
7 event 32) (first picture)
2
Tue Mar 23 08:42:11 2021
Martino Trassinelli
Runs
Beam nominal set-up
- 238U89+ at the energy of 30.16 MeV/u for
the Li-like from excitation --> 1-3 days
of beam time
3
Wed Mar 24 22:45:37 2021
Martino Trassinelli
General
Accelerator cycle
Cycle at present
4
Wed Mar 24 22:48:09 2021
Martino Trassinelli
Typical cycle
Typical cycle at present
5
Thu Mar 25 01:37:04 2021
Martino Trassinelli
Runs
Change in the gas-jet density
We reduced the pressure of the gas-jet target
at 0:45AM. Now it is about 7E11 (indicated
as 7x10E11 in the webpage of the control).
6
Thu Mar 25 08:59:50 2021
Martino Trassinelli
Runs
Summary of the last evening night
Starting from about 23:40 we have a complete
set-up with Ge detector and particle detector.
Gas jet density about 1.1e12.
7
Thu Mar 25 11:42:14 2021
Martino Trassinelli
DAQ
TDC recalibration
Check of the TDC spectrum:it is strange. Uwe
and Jan recheck all the chain. Still strange
behavior.
8
Thu Mar 25 13:29:22 2021
Martino Trassinelli
DAQ
mbs acquisition restarted
TDC changed and acquisition restarted.
We have now a 2D histogram time vs energy.
We should have some clues to solve the mystery.
9
Thu Mar 25 19:20:24 2021
Martino Trassinelli
General
Switch to Be-like line
Tuning the beam for the Be-like U from capture
in Li-like U.
Energy setting up to 39.293 MeV/u.
10
Thu Mar 25 23:59:46 2021
Robert
Runs
Data run for Be-like
We started a run with cooler energy set to
21715 V, corresponding to 21515 V with space
charge correction for Be-like from capture.
11
Fri Mar 26 07:26:48 2021
Robert
Runs
typical cycle for the be-like measurement
12
Fri Mar 26 08:35:25 2021
Martino Trassinelli
Runs
End of the Be-like beam
Problems from the high frequency in unilac.
We stoped the acquisition at 6:50 corresponding
to the lmd file n. 1184.
13
Fri Mar 26 09:10:02 2021
Martino Trassinelli
Analysis
Low energy Li-like beam TDC vs ADC from Ge detector
Arrival time vs energy of the Xray from the
Ge detector during the beam with Li-like
U at 39 MeV/u. Prompt data are visible, due
14
Fri Mar 26 20:42:31 2021
Robert
Analysis
image of the photons from the be-run
around 16 photons in the right energy range
after ~5 h of integration.
15
Tue Mar 30 11:03:17 2021
Robert
Runs
data run for Li like
We startet run on Tuesday 2 am with ~4E7 decellerated
ions.
We get a count rate of ~40 cts per hour in
16
Tue Mar 30 11:24:51 2021
Martino
Runs
Typical good cycles for He-like beam
17
Thu Apr 1 21:24:14 2021
Martino
Runs
H-like ion beam started for He-like
Starting the acquisition for the He-like U
with a H-like U beam at 41.035 MEV/u
Gas jet detector: 2.38E12 part/cm2
18
Sat Apr 3 12:01:01 2021
Robert
Analysis
Line energies for Germanium detector
19
Sat Apr 3 12:03:57 2021
Pierre-Michel
Analysis
X-ray spectrum
Live X-ray spectrum from U91+ at 41 MeV/u,
accumulated within 35.6 h according to Go4.
20
Sun Apr 4 15:26:57 2021
Robert
Runs
stability of ion beam current during He-like run
graph starts covers the whole he-like run
from Thursday evening to monday afternoon
21
Mon Apr 5 16:07:36 2021
Robert
Runs
He-like run
run started thursday 21/04/01 20:00,
ended monday 21/04/05 15:20,
time span of 91.5 h,
22
Tue Apr 6 14:27:59 2021
Martino
Runs
electron cooler voltages
Parameter U90+ @ 30.160 MeV/u U91+ @ 41.035
MeV/u U89+ @ 39.293 MeV/u
gamme 1.0324 1.04407
23
Tue Apr 6 14:47:26 2021
Robert
Analysis
stability of the spectrometers during He and Be run
the large spike in the outer spectrometer
is attributed to an open door of experimentierhalle,
which we closed at ~17:00 at 21/04/05.
24
Tue Apr 6 14:59:19 2021
Robert
Runs
second Be-like run
run started 210405 17:50
run ended 210407 11:30
no of files: 1452
25
Wed Apr 7 11:51:54 2021
Robert
Runs
stability of ion beam current during Be-like run
26
Wed Apr 7 11:52:52 2021
Robert
Analysis
spectrum He-like
27
Wed Apr 7 11:53:33 2021
Robert
Analysis
spectrum Li-like
28
Wed Apr 7 11:59:01 2021
Robert
Analysis
spectrum Be-like
Goto page
1
,
2
ELOG V3.1.5-fc6679b