HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075
  dN=0 experiment, Page 1 of 2  Not logged in ELOG logo
ID Date Author Category Subject Text Attachments
  1   Tue Mar 23 08:39:11 2021 Martino Trassinelli Target triggers Settings for the event triggers (on left -
machine 6 event 32 / off right - machine
7 event 32) (first picture)
 triggers_gas-jet.jpegtarget_inhibit.jpeg 
  2   Tue Mar 23 08:42:11 2021 Martino TrassinelliRunsBeam nominal set-up- 238U89+ at the energy of 30.16 MeV/u for
the Li-like from excitation --> 1-3 days
of beam time
  
  3   Wed Mar 24 22:45:37 2021 Martino TrassinelliGeneralAccelerator cycleCycle at present  acc_cycle.jpeg 
  4   Wed Mar 24 22:48:09 2021 Martino Trassinelli Typical cycleTypical cycle at present  typical_cycle.jpeg 
  5   Thu Mar 25 01:37:04 2021 Martino TrassinelliRunsChange in the gas-jet densityWe reduced the pressure of the gas-jet target
at 0:45AM. Now it is about 7E11 (indicated
as 7x10E11 in the webpage of the control).
 DSC_3187.JPG 
  6   Thu Mar 25 08:59:50 2021 Martino TrassinelliRunsSummary of the last evening nightStarting from about 23:40 we have a complete
set-up with Ge detector and particle detector.
Gas jet density about 1.1e12.
  
  7   Thu Mar 25 11:42:14 2021 Martino TrassinelliDAQTDC recalibrationCheck of the TDC spectrum:it is strange. Uwe
and Jan recheck all the chain. Still strange
behavior.  
  
  8   Thu Mar 25 13:29:22 2021 Martino TrassinelliDAQmbs acquisition restartedTDC changed and acquisition restarted.
We have now a 2D histogram time vs energy.
We should have some clues to solve the mystery.
  
  9   Thu Mar 25 19:20:24 2021 Martino TrassinelliGeneralSwitch to Be-like lineTuning the beam for the Be-like U from capture
in Li-like U. 
Energy setting up to 39.293 MeV/u.
  
  10   Thu Mar 25 23:59:46 2021 RobertRunsData run for Be-likeWe started a run with cooler energy set to
21715 V, corresponding to 21515 V with space
charge correction for Be-like from capture.
  
  11   Fri Mar 26 07:26:48 2021 RobertRunstypical cycle for the be-like measurement    20210326_071721.jpg20210325_235453.jpg 
  12   Fri Mar 26 08:35:25 2021 Martino TrassinelliRunsEnd of the Be-like beamProblems from the high frequency in unilac.
We stoped the acquisition at 6:50 corresponding
to the lmd file n. 1184.
  
  13   Fri Mar 26 09:10:02 2021 Martino TrassinelliAnalysisLow energy Li-like beam TDC vs ADC from Ge detectorArrival time vs energy of the Xray from the
Ge detector during the beam with Li-like
U at 39 MeV/u. Prompt data are visible, due
 time_vs_energy_Li-like_beam_30MeV.png 
  14   Fri Mar 26 20:42:31 2021 RobertAnalysisimage of the photons from the be-runaround 16 photons in the right energy range
after ~5 h of integration.
 Be-like_run_210325.jpg 
  15   Tue Mar 30 11:03:17 2021 RobertRunsdata run for Li likeWe startet run on Tuesday 2 am with ~4E7 decellerated
ions. 
We get a count rate of ~40 cts per hour in
  
  16   Tue Mar 30 11:24:51 2021 MartinoRunsTypical good cycles for He-like beam   WhatsApp_Image_2021-03-30_at_11.16.25_(1).jpegWhatsApp_Image_2021-03-30_at_11.16.25.jpeg 
  17   Thu Apr 1 21:24:14 2021 MartinoRunsH-like ion beam started for He-likeStarting the acquisition for the He-like U
with a H-like U beam at 41.035 MEV/u
Gas jet detector: 2.38E12 part/cm2
 DSC_3217.JPGDSC_3218.JPG 
  18   Sat Apr 3 12:01:01 2021 RobertAnalysisLine energies for Germanium detector   Energies_for_Ge_detector.pdf 
  19   Sat Apr 3 12:03:57 2021 Pierre-MichelAnalysisX-ray spectrumLive X-ray spectrum from U91+ at 41 MeV/u,
accumulated within 35.6 h according to Go4.
 E_Cal_35deg_H-like_beam_41MeV.png 
  20   Sun Apr 4 15:26:57 2021 RobertRunsstability of ion beam current during He-like rungraph starts covers the whole he-like run
from Thursday evening to monday afternoon
 ioncurrentHe-like-run.png 
ELOG V3.1.5-fc6679b