HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  proton-capture on 118Te, Page 7 of 29  Not logged in ELOG logo
ID Date Authorup Category Subject Year Text Attachments
  366   Fri May 21 15:15:59 2021 JanRunsRun 00552021open file : e127b_run0055.lmd

beam: 124Xe54+
  
  369   Fri May 21 19:36:46 2021 JanRunsRun 00562021open file : e127b_run0056.lmd

beam: 124Xe54+
  
  370   Fri May 21 20:09:00 2021 JanRunsRun 00572021open file : e127b_run0057.lmd

beam: 124Xe54+
  
  371   Fri May 21 21:02:53 2021 JanRunsRun 00582021open file : e127b_run0058.lmd

beam: 124Xe54+
  
  412   Sun May 23 23:44:37 2021 JanRunsRun 0088 - background BaF/Xray2021open file : e127b_run0088.lmd

no beam
  
  438   Tue May 25 07:51:48 2021 JanAcceleratorESR stacking cycle length2021The full cycle length of ESR with 30 stacks
is about 7:45 minutes, out of which 15.5
sec are with target switched ON.
  
  439   Tue May 25 08:36:15 2021 JanGenerallessons learned20211. before using stoch. cooling in ESR, boot
and update the windows PC
2. better diagnostics for low energy/intensity
  
  445   Tue May 25 11:58:30 2021 JanAnalysis118(p,g) counts until run01152021The two attached plots show the collected
Si data up to run0115.
 run91to115_Si_map.pngrun91to115_Si_projection.png 
  469   Wed May 26 14:28:23 2021 JanAnalysisXrays from 118Te & 124Xe2021Attached is a plot of the uncalibrated energy
spectra taken with the 90 degree xray detector
for 118Te (red) and 124Xe (blue).
 xray90_124Xe_118Te.png 
  496   Thu May 27 13:26:35 2021 JanAcceleratorFRS degrader failure2021Maybe, our degrader in FRS was removed by
hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
  
  522   Fri May 28 14:40:03 2021 JanRunsrun0175 - BaF calib. 22Na2021    
  523   Fri May 28 15:15:06 2021 JanAnalysis118Te(p,g) counts runs 135 to 1742021This is the summary of all Si data collected
at 6 MeV/u until run174 before the Alvarez
problem.
 run135to174_Si_map.pngrun135to174_Si_projection.png 
  571   Wed Jun 2 09:14:04 2021 JanGeneralTelegram Chat Export2021Attached is the exported Telegram chat.
There is the simple PDF and the zip-file
containing the chat in json-format as well
 E127_TelegramChat.pdfE127_TelegramChat_json.zip 
  575   Thu Jul 8 13:39:34 2021 JanCalibrationElectron cooler parameters2021Below are the results from the e-cooler voltage
offset measurments done by Regina Hess et
al. using the voltage divider (VD).
  
  576   Thu Jul 8 14:07:19 2021 JanCalibrationbeam energies2021Table of ion energies calculated from cooler
parameters
 CodeCogsEqn.pngCodeCogsEqn(1).png 
  578   Wed Oct 13 15:09:04 2021 JanCollaborationK-REC cross sections A. Surzhykov2021Attached are the theory K-REC cross sections
as calculated by Andrey Surzhykov (August
2021).
 DCS_Z_52_Tp_7.049MeV_NEW.datDCS_Z_54_Tp_7.049MeV_NEW.datDCS_Z_52_Tp_6.042MeV_NEW.dat 
  579   Wed Oct 13 15:15:53 2021 JanDAQroot-file header for analysis2021Attached is the header file needed for root
analysis.
 e127b.h 
  1   Thu Sep 13 11:42:33 2018 Jan GloriusCollaborationProposal Attached is the beam time proposal submitted
and accepted by the G-PAC in 2017.    
 E127_Reifarth_pg.pdfE127_Approval.pdf 
  293   Thu Apr 29 20:32:52 2021 Jan GloriusCalibrationcalibration sources2021We use the following list of sources for calibration
of the Xray detectors:
  
  294   Thu Apr 29 20:34:09 2021 Jan GloriusCalibrationrun0003 - Xray90 calib Pb210 d=167.5mm2021Efficiency calibration in the lab

Detector: GEM1800 - 90 deg
  
ELOG V3.1.5-fc6679b