HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  proton-capture on 118Te, Page 3 of 29  Not logged in ELOG logo
Entry  Tue Feb 2 13:59:00 2021, Jan, Detectors, DSSD installation and alignment, 2021 
Entry  Wed Nov 6 14:13:53 2019, Jan, Laszlo, Detectors, DSSSD - 1st movement - realignment,  
Entry  Fri Jun 5 14:06:15 2020, Laszlo, Detectors, DSSSD and SCRAPER position estimate for Xe and Te experiments, 2020 SP54120060514100.pdfDSSSD_new1.pdfIMG_20200321_025644.jpg
Entry  Sat May 22 16:28:10 2021, Laszlo, General, DSSSD movement, 2021 
Entry  Tue Mar 10 08:52:34 2020, Jan, Detectors, DSSSD positioning,  optimum_detector_position_2.jpg
Entry  Sat Mar 21 06:02:22 2020, Tino, Oliver, General, Detector filling,  
Entry  Wed May 26 20:34:50 2021, Ragan, Thanassis, Detectors, Detector filling, 2021 
Entry  Fri Nov 15 10:46:12 2019, Laszlo, Detectors, Detector movement from HKR,  IMG_20191114_135600.jpg
Entry  Tue May 19 16:48:15 2020, Laszlo, General, E127 beamtime overview,  E127_beamtime_overview.pngE127_beamtime_overview.pdf
Entry  Mon Mar 23 14:12:54 2020, Ragan, Runs, E127 experiment stops,  
Entry  Mon May 31 10:08:42 2021, Jan, Sophia, Runs, E127b runsheet, 2021 e127b_runsheet.ods
Entry  Sun Mar 22 23:19:23 2020, Michael, General, ESR Vacuum readings,  ESR_Vakuum2020-03-22-2318.PNG
Entry  Mon Mar 23 06:49:46 2020, Shahab, Runs, ESR kicker also has some problems,  
Entry  Tue May 25 07:51:48 2021, Jan, Accelerator, ESR stacking cycle length, 2021 
Entry  Wed Jun 23 12:29:35 2021, Jan, Sophia, Calibration, Efficiency of the x-ray Detectors , 2021 Effizienz_x_ray_GEM1800_90.pngEffizienz_x_ray_GEM3000_145.pngEffizienz_x_ray_GLP_35_ohne33keV.png
Entry  Thu Jul 8 13:39:34 2021, Jan, Calibration, Electron cooler parameters, 2021 
Entry  Mon Mar 23 01:53:59 2020, Shahab, Runs, Empty shots in ESR,  
Entry  Sat Mar 21 12:42:21 2020, Ragan, General, Entry to ESR for MCP detector,  
Entry  Sat Mar 21 12:32:00 2020, Laszlo, General, Estimated target thickness,  
Entry  Thu May 27 13:26:35 2021, Jan, Accelerator, FRS degrader failure, 2021 
ELOG V3.1.5-fc6679b