HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 1 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Mar 10 09:41:26 2020, Jan, Detectors, x-ray background from BaF,  
Entry  Mon Mar 23 12:30:39 2020, laszlo, Analysis, with and without scraper,  124Xe_with_scraper_3D.png124Xe_with_scraper_2D.png124Xe_without_scraper_2D.png124Xe_without_scraper_3D.png
Entry  Wed Mar 18 09:53:28 2020, Laszlo, Jan, General, vacuum after opening gate valve,  vacuum_ESR1.jpgvacuum_setup1.jpg
Entry  Thu Apr 23 19:09:58 2020, Laszlo, Calibration, theoretical K-REC cross sections ,  9x
Entry  Sun Mar 15 17:13:21 2020, Laszlo, Jan, Calibration, the x-ray gate issue,  IMG_20200315_172129.jpg
Entry  Thu Apr 22 10:56:20 2021, Jan, Detectors, target-chamber det. distances, 2021 E127_xray_distances.jpg
Entry  Sat Mar 21 14:52:05 2020, Laszlo, General, target optimization,  IMG_20200321_145105.jpgIMG_20200321_145059.jpg
Entry  Fri Mar 20 01:21:00 2020, Laszlo, General, target is switched on event based,  
Entry  Sat Mar 21 21:36:06 2020, Jan, Runs, target incident,  run67_target_incident.png
Entry  Sun Mar 22 18:35:43 2020, Laszlo, , target dropped aagain,  target_density_after_118Te_afternoon_runs.png
Entry  Fri May 21 10:00:51 2021, Jan, Accelerator, target bump, 2021 
Entry  Sun Mar 22 17:45:07 2020, Laszlo, General, switching to primary beam,  
Entry  Thu Mar 19 15:09:29 2020, Jan, General, starting off with DSSSD,  
Entry  Wed Sep 25 13:03:46 2019, Laszlo, Analysis, simulations on 118Te+p,  11x
Entry  Fri May 21 01:17:37 2021, Laszlo, Analysis, simple analysis code, 2021 
Entry  Thu Dec 5 10:57:57 2019, Jan, Laszlo, Detectors, setting up the DSSD with beam,  
Entry  Mon Mar 23 13:26:59 2020, Jan, Analysis, runs_90to99 SCRAPER RESULTS,  124Xe_Si_map.png124Xe_x-ray_35.png124Xe_x-ray_90.png124Xe_x-ray_145.png124Xe_Si_projection.png
Entry  Mon Mar 23 14:32:03 2020, Jan, Analysis, runs_100to104 NO-SCRAPER RESULTS,  124Xe_Si_map.png124Xe_Si_projection.png124Xe_x-ray_35.png124Xe_x-ray_90.png124Xe_x-ray_145.png
Entry  Fri Apr 5 05:46:20 2019, Jan, DAQ, running DRASI for (p,g),  
Entry  Sat Mar 21 12:06:50 2020, Laszlo, General, run61 - SCRAPER moved out,  
ELOG V3.1.5-fc6679b