HOME
ESR
EXPERIMENTS
LABS etc
|
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
|
proton-capture on 118Te, Page 1 of 29 |
Not logged in |
|
|
New entries since: | Thu Jan 1 01:00:00 1970 | |
Tue Mar 10 09:41:26 2020, Jan, Detectors, x-ray background from BaF,
|
Mon Mar 23 12:30:39 2020, laszlo, Analysis, with and without scraper,
|
Wed Mar 18 09:53:28 2020, Laszlo, Jan, General, vacuum after opening gate valve,
|
Thu Apr 23 19:09:58 2020, Laszlo, Calibration, theoretical K-REC cross sections , 9x
|
Sun Mar 15 17:13:21 2020, Laszlo, Jan, Calibration, the x-ray gate issue,
|
Thu Apr 22 10:56:20 2021, Jan, Detectors, target-chamber det. distances, 2021
|
Sat Mar 21 14:52:05 2020, Laszlo, General, target optimization,
|
Fri Mar 20 01:21:00 2020, Laszlo, General, target is switched on event based,
|
Sat Mar 21 21:36:06 2020, Jan, Runs, target incident,
|
Sun Mar 22 18:35:43 2020, Laszlo, , target dropped aagain,
|
Fri May 21 10:00:51 2021, Jan, Accelerator, target bump, 2021
|
Sun Mar 22 17:45:07 2020, Laszlo, General, switching to primary beam,
|
Thu Mar 19 15:09:29 2020, Jan, General, starting off with DSSSD,
|
Wed Sep 25 13:03:46 2019, Laszlo, Analysis, simulations on 118Te+p, 11x
|
Fri May 21 01:17:37 2021, Laszlo, Analysis, simple analysis code, 2021
|
Thu Dec 5 10:57:57 2019, Jan, Laszlo, Detectors, setting up the DSSD with beam,
|
Mon Mar 23 13:26:59 2020, Jan, Analysis, runs_90to99 SCRAPER RESULTS,
|
Mon Mar 23 14:32:03 2020, Jan, Analysis, runs_100to104 NO-SCRAPER RESULTS,
|
Fri Apr 5 05:46:20 2019, Jan, DAQ, running DRASI for (p,g),
|
Sat Mar 21 12:06:50 2020, Laszlo, General, run61 - SCRAPER moved out,
|
|