HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  proton-capture on 118Te, Page 1 of 29  Not logged in ELOG logo
Entry  Tue Mar 10 09:41:26 2020, Jan, Detectors, x-ray background from BaF,  
The BaF2 detectors planned to be installed at the target induce an additional background in the x-ray detectors sitting below inside the target chamber.

We made test measurements with an x-ray detector for estimating the background in the region of interest for our K-REC measurements (35 to 50 keV).
Entry  Mon Mar 23 12:30:39 2020, laszlo, Analysis, with and without scraper,  124Xe_with_scraper_3D.png124Xe_with_scraper_2D.png124Xe_without_scraper_2D.png124Xe_without_scraper_3D.png
 
Entry  Wed Mar 18 09:53:28 2020, Laszlo, Jan, General, vacuum after opening gate valve,  vacuum_ESR1.jpgvacuum_setup1.jpg
Gate valve to DSSSD setup was opened on Tue 17.03. ~9:00

The vacuum on Wed 18.03. ~9:00 was
Entry  Thu Apr 23 19:09:58 2020, Laszlo, Calibration, theoretical K-REC cross sections ,  9x
Find attached Andrey Surzhykov's calculations for the theta angle in respect to the beam direction (in lab. frame) vs. cross section for 124Xe54+ and 118Te52+.
The calculations made for collision with two H atoms with the accuracy of 1%. There are no molecular corrections done, but these corrections are within
1%.
Entry  Sun Mar 15 17:13:21 2020, Laszlo, Jan, Calibration, the x-ray gate issue,  IMG_20200315_172129.jpg
We found a strange behaviour of our ADC gates for the x-ray detectors.
The setting as shown in the foto below corresponds to a delay of 5 us and a gate length of 15 us.
This is the only setting that produces nice spectra, even though the signals and gate are not aligned.
Entry  Thu Apr 22 10:56:20 2021, Jan, Detectors, target-chamber det. distances, 2021 E127_xray_distances.jpg
This is the lookup table for the distance of each x-ray detector to the target.
See attached foto for explanation.
Entry  Sat Mar 21 14:52:05 2020, Laszlo, General, target optimization,  IMG_20200321_145105.jpgIMG_20200321_145059.jpg
previous position of the beam at target was -3mm (for the night position)
max. intensity position of the beam at target 1s -1mm. --> now it is set to this position
Entry  Fri Mar 20 01:21:00 2020, Laszlo, General, target is switched on event based,  
 
Entry  Sat Mar 21 21:36:06 2020, Jan, Runs, target incident,  run67_target_incident.png
in run 66 or 67 we had a single ESR cycle for which the target didn't switch off for new injection and deceleration etc.
Very likely the DAQ also didn't get an OFF signal and collected OFF data to the TRIGGER=1 (ON data) branch.
As a consequence we collected about ~100 counts on the Si in one shot, which was about ~20 counts before this shot.
Entry  Sun Mar 22 18:35:43 2020, Laszlo, , target dropped aagain,  target_density_after_118Te_afternoon_runs.png
there was a drop again from 8.6e13 to 7e13 in the target density
Entry  Fri May 21 10:00:51 2021, Jan, Accelerator, target bump, 2021 
The target overlap was optimized on xray and si rates.
The setting now is -10mm in SC9
Entry  Sun Mar 22 17:45:07 2020, Laszlo, General, switching to primary beam,  
We have finished the measurement with the fragments.

Now Yury will setup up a primary beam through the FRS, but without target in FRS.
Entry  Thu Mar 19 15:09:29 2020, Jan, General, starting off with DSSSD,  
here is my short guide how to start with the measurement as soon as we have a beam available.

0. ESR timing in DAQ (maybe Uwe can also assist here)
Entry  Wed Sep 25 13:03:46 2019, Laszlo, Analysis, simulations on 118Te+p,  11x
I have made some simulations at 8AMeV, 7AMeV and 4AMeV energies for the main 118Te + p reaction channels. For the
Rutherford simulations credits to Yuanming! For each energy there are 3 simulations: without the scraper, with the
scraper (online), scraper (online) + E-truncation (offline). The scraper is treated as an "ideal scraper" meaning
Entry  Fri May 21 01:17:37 2021, Laszlo, Analysis, simple analysis code, 2021 
//a simple code (template) for offline analysis
//made by Laszlo, serves as a simple demonstration for enthusiastic shifters
//it creates a "no double counting Si 2D pos" histo
Entry  Thu Dec 5 10:57:57 2019, Jan, Laszlo, Detectors, setting up the DSSD with beam,  
This is a brief how-to about getting the DSSSD set up with stored beam and target in the ESR.

The main goals
Entry  Mon Mar 23 13:26:59 2020, Jan, Analysis, runs_90to99 SCRAPER RESULTS,  124Xe_Si_map.png124Xe_x-ray_35.png124Xe_x-ray_90.png124Xe_x-ray_145.png124Xe_Si_projection.png
With scraper, we have roughly 150-200 (p,g) counts now.

X-rays look fine!
Entry  Mon Mar 23 14:32:03 2020, Jan, Analysis, runs_100to104 NO-SCRAPER RESULTS,  124Xe_Si_map.png124Xe_Si_projection.png124Xe_x-ray_35.png124Xe_x-ray_90.png124Xe_x-ray_145.png
Without scraper, we have very few (p,g) counts, hard to get numbers quickly, maybe ~50.

X-rays look fine!
Entry  Fri Apr 5 05:46:20 2019, Jan, DAQ, running DRASI for (p,g),  
We now have a drasi DAQ running for our (p,g) experiments.
The RIO we have it installed right now is: r4l-58
It shall be used with the user <litv-exp>
Entry  Sat Mar 21 12:06:50 2020, Laszlo, General, run61 - SCRAPER moved out,  
we want to see any change on the Silicon count rate, because we will have now also Rutherford scattering. 
ELOG V3.1.5-fc6679b