ID |
Date |
Author |
Category |
Subject |
Year |
Text |
|
94
|
Sat Mar 21 02:00:08 2020 |
Laszlo, Tino, Oliver | Runs | run entry - run051 | | Beam is back at 01:59 am.
Open file: runstart051
|
|
95
|
Sat Mar 21 02:15:19 2020 |
Laszlo, Tino, Oliver | Runs | run entry - run051 | | Open file: runstart051
beam: 118Te52+
|
|
96
|
Sat Mar 21 02:31:48 2020 |
Laszlo, Tino, Oliver | Runs | run entry - run051 | | Open file: runstart051
beam: 118Te52+
|
|
98
|
Sat Mar 21 03:01:22 2020 |
Tino, Oliver | Runs | run entry - run051 | | Open file: runstart051
beam: 118Te52+
|
|
81
|
Fri Mar 20 10:28:31 2020 |
Ragan, RuiJiu | Runs | run entry - run050 | | Beam is back at 10:27 am.
Open file: runstart050
|
|
82
|
Fri Mar 20 11:00:25 2020 |
Ragan, RuiJiu | Runs | run entry - run050 | | Yuri and ESR team are optimising
the deceleration in ESR.
DSSSD detector is taken out at
|
|
78
|
Fri Mar 20 07:30:16 2020 |
Ragan, RuiJiu | Runs | run entry - run049 | | beam: 124Xe54+
energy: 10 MeV/u
|
|
79
|
Fri Mar 20 08:01:40 2020 |
Ragan, RuiJiu | Runs | run entry - run049 | | beam: 124Xe54+
energy: 10 MeV/u
|
|
80
|
Fri Mar 20 08:30:52 2020 |
Ragan, RuiJiu | Runs | run entry - run049 | | There is no beam due to water leakage in the
transfer channel of SIS.
|
|
76
|
Fri Mar 20 06:34:40 2020 |
Shahab | Runs | run entry - run048 | | beam: 124Xe54+
energy: 10 MeV/u
|
|
77
|
Fri Mar 20 07:01:06 2020 |
Shahab | Runs | run entry - run048 | | beam: 124Xe54+
energy: 10 MeV/u
|
|
74
|
Fri Mar 20 05:32:44 2020 |
Shahab | Runs | run entry - run047 | | beam: 124Xe54+
energy: 10 MeV/u
|
|
75
|
Fri Mar 20 06:00:26 2020 |
Shahab | Runs | run entry - run047 | | beam: 124Xe54+
energy: 10 MeV/u
|
|
72
|
Fri Mar 20 04:32:22 2020 |
Shahab | Runs | run entry - run046 | | beam: 124Xe54+
energy: 10 MeV/u
|
|
73
|
Fri Mar 20 05:03:03 2020 |
Shahab | Runs | run entry - run046 | | beam: 124Xe54+
energy: 10 MeV/u
|
|
221
|
Mon Mar 23 04:08:12 2020 |
Shahab | Runs | run 93 stopped | | run 93 which was during faulty kicker was
stopped so that the kicker module can be
repaired. |
|
140
|
Sat Mar 21 18:13:22 2020 |
Shahab | General | rough comparison gas target off and on | | rough comparison of life time at 10 MeV/u
when target off with on. more noise in background
means weaker signal. |
|
579
|
Wed Oct 13 15:15:53 2021 |
Jan | DAQ | root-file header for analysis | 2021 | Attached is the header file needed for root
analysis. |
|
152
|
Sat Mar 21 23:12:38 2020 |
Jan | Detectors | removed BaF detectors | | After run 67 and before run 68, the BaF detectors
have been removed in order to reduce the
Compton background in the x-ray detectors. |
|
567
|
Sun May 30 14:40:55 2021 |
Jan, Sophia | Detectors | real detector assignment | 2021 | ************************************
GEM1800 @ 90deg (xray1)
GLP2000 @ 35deg (xray2)
|
|