Fri May 28 02:51:02 2021, Mario, Sophia, Runs, Run 0168, 2021
|
only beam in the first minutes
No. of stacks: 10
|
Fri May 28 03:15:01 2021, Mario, Sophia, Runs, Run 0169, 2021
|
only beam in the first minutes
No. of stacks: 10
|
Fri May 28 04:45:06 2021, Mario, Sophia, Runs, Run 0170, 2021
|
only beam in the first minutes
No. of stacks: 10
|
Fri May 28 05:46:15 2021, Mario, Sophia, Runs, Run 0171, 2021
|
only beam in the first minutes
No. of stacks: 10
|
Mon Mar 23 08:51:01 2020, Laszlo,Yury, Runs, run entry - run095,
|
open file : run095
beam: 124Xe54+
|
Mon Mar 23 09:22:12 2020, Laszlo,Yury, Runs, run entry - run096,
|
open file : run096
beam: 124Xe54+
|
Mon Mar 23 10:08:12 2020, Laszlo,Yury, Runs, run entry - run098,
|
open file : run098
beam: 124Xe54+
|
Mon Mar 23 10:26:36 2020, Laszlo,Yury, Runs, run entry - run099,
|
open file : run099
beam: 124Xe54+
|
Mon Mar 23 11:00:29 2020, Laszlo,Sergey, Runs, run entry - run100 - SCRAPER removed!,
|
open file : run100
beam: 124Xe54+
|
Mon Mar 23 11:17:42 2020, Laszlo,Sergey, Runs, run entry - run101,
|
open file : run101
beam: 124Xe54+
|
Mon Mar 23 11:35:52 2020, Laszlo,Sergey, Runs, run entry - run102,
|
open file : run102
beam: 124Xe54+
|
Sat Mar 21 02:00:08 2020, Laszlo, Tino, Oliver, Runs, run entry - run051,
|
Beam is back at 01:59 am.
Open file: runstart051
|
Sat Mar 21 02:15:19 2020, Laszlo, Tino, Oliver, Runs, run entry - run051,
|
Open file: runstart051
beam: 118Te52+
|
Sat Mar 21 02:31:48 2020, Laszlo, Tino, Oliver, Runs, run entry - run051,
|
Open file: runstart051
beam: 118Te52+
|
Sat May 22 20:46:19 2021, Laszlo, Pierre.Michel, Enis, General, new scraper position, 2021
|
The scraper was moved into 2.5mm in absolute which corresponds to 20mm away from the beam axis.
Pressluft Antriebe
|
Sat May 22 22:29:48 2021, Laszlo, Pierre.Michel, Enis, General, new scraper position, 2021
|
The scraper was moved into 7.5 mm in absolute which corresponds to 25 mm away from the beam axis.
Pressluft Antriebe
|
Sun Mar 15 17:12:40 2020, Laszlo, Jan, Detectors, new Ortec spec amps ,
|
We are now using new SpecAmps for the x-ray detectors from ORTEC, they deliver much improved resolution but have other strange effects as discribed in the
next entry. |
Sun Mar 15 17:13:21 2020, Laszlo, Jan, Calibration, the x-ray gate issue,
|
We found a strange behaviour of our ADC gates for the x-ray detectors.
The setting as shown in the foto below corresponds to a delay of 5 us and a gate length of 15 us.
This is the only setting that produces nice spectra, even though the signals and gate are not aligned.
|
Wed Mar 18 09:53:28 2020, Laszlo, Jan, General, vacuum after opening gate valve,
|
Gate valve to DSSSD setup was opened on Tue 17.03. ~9:00
The vacuum on Wed 18.03. ~9:00 was
|
Sat Mar 21 22:57:28 2020, Laszlo, Jan, DAQ, changing cables of the Xray 90 and 145,
|
Energy signals of 90 and 145 degree detector have been checked and exchanged
They were connected to the wrong ADC channel.
|
|