Entry  Thu May 27 20:50:06 2021, Michele, Cobus, Runs, Run 0162, 2021 

No. of stacks: 10 
length SC10: 2x 5.5s 
Entry  Thu May 27 21:14:16 2021, Michele, Cobus, Runs, Run 0163, 2021 

No. of stacks: 10 
length SC10: 2x 5.5s 
Entry  Thu May 27 22:00:28 2021, Michele, Cobus, Runs, Run 0164, 2021 

No. of stacks: 10 
length SC10: 2x 5.5s 
Entry  Thu May 27 22:45:13 2021, Michele, Cobus, Runs, Run 0165, 2021 

No. of stacks: 10 
length SC10: 2x 5.5s 
Entry  Sun May 23 07:40:48 2021, Michele, Beatriz, Runs, Run 0087, 2021 
open file : e127b_run0086.lmd

beam: 124Xe54+
Entry  Wed May 26 06:27:18 2021, Michele, Beatriz, Runs, Run 0127, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Sun Mar 22 19:49:12 2020, Michael, Laszlo, Yuri, , Yuri is still tuning FRS,  
We filled the Xray detectors.
Yuri is sill tuning FRS for primary beam.
Entry  Sun Mar 22 22:00:49 2020, Michael, Laszlo, Yuri, Runs, run entry - run089 - switched to Primary beam,  
Yuri is still tuning, but we are collecting data. Beam is in. Detectors are out.

open file : run089
Entry  Sun Mar 22 22:06:21 2020, Michael, Laszlo, Yuri, Runs, run entry - run089 - stopped,  
closed file again.

Yuri is still tuning, but we are collecting data. Beam is in. Detectors are out.
Entry  Sun Mar 22 22:46:56 2020, Michael, Laszlo, Yuri, Runs, run entry - run090,  
Taking data again with primary beam.

open file : run090
Entry  Sun Mar 22 17:49:28 2020, Michael, Laszlo, Runs, run entry - run088,  Trafo_run88.png
The beam is still unchanged. We just start a run to collect all remaining data.
Data is probably scratch, expect changing conditions at the machines during the run.
Entry  Sun Mar 22 18:41:50 2020, Michael, Laszlo, Runs, run entry - run088,  
Closed file run088 at 17:55. No beam in ESR.
Entry  Sun Mar 22 15:39:29 2020, Michael, Runs, run entry - run086,  
open file : run086

beam: 118Te52+
Entry  Sun Mar 22 16:10:12 2020, Michael, Runs, run entry - run086,  
open file : run086

beam: 118Te52+
Entry  Sun Mar 22 16:39:37 2020, Michael, Runs, run entry - run087,  
Four shots at the end of 086/beginning of 87 were empty, no SIS kicker. Beam operators fixed it quickly.

open file : run087
Entry  Sun Mar 22 17:09:49 2020, Michael, Runs, run entry - run087,  
open file : run087

beam: 118Te52+
Entry  Sun Mar 22 17:35:39 2020, Michael, Runs, run entry - run087. ,  
Closing file at 17:39, stopping data taking. Yuri will switch to primary beam through FRS without target.

Also a minor observation is, that at the end of the target on phase, the X-ray count rate is going up very high. (Data acquisition was in Jet Off mode)
Entry  Sun Mar 22 23:19:23 2020, Michael, General, ESR Vacuum readings,  ESR_Vakuum2020-03-22-2318.PNG
 
Entry  Thu May 27 23:44:56 2021, Mario, Sophia, Runs, Run 0166, 2021 
Note: beam was gone for 8 min (23:47 - 23:55) and from 00:01 on.
No. of stacks: 10 
length SC10: 2x 5.5s 
Entry  Fri May 28 00:16:15 2021, Mario, Sophia, Runs, Run 0167, 2021 
No. of stacks: 10 
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 