HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 16 of 29  Not logged in ELOG logo
ID Date Author Categorydown Subject Year Text Attachments
  Draft   Fri Jun 28 14:06:28 2019 JanGeneralCAD of (p,g) setup     
  23   Wed Sep 25 13:58:24 2019 LaszloGeneralGamow window energies for 118Te(p,g) # Z   A   Iso Re Rc   T9 upper width mxpos
 shift
 52 118 te118 pg 20  0.5  1.39  0.58  1.06
 PhysRevC.81.045807.pdf 
  35   Fri Feb 21 11:29:02 2020 LaszloGeneralShift plan https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0   
  40   Wed Mar 11 14:33:44 2020 LaszloGeneralbeam time manual Here you can find the digital version of the
E127 beam time manual.
 E127_experimental_manual.pdfmanual.odt 
  60   Tue Mar 17 08:15:49 2020 JanGeneralcurrent grids & screen in TE  measured beam diagnosis with 124Xe48+ at 326
MeV/u
 2020-03-16_18-51-50-170.pngIMG_0694.jpg 
  62   Wed Mar 18 09:53:28 2020 Laszlo, JanGeneralvacuum after opening gate valve Gate valve to DSSSD setup was opened on Tue
17.03. ~9:00
 vacuum_ESR1.jpgvacuum_setup1.jpg 
  63   Thu Mar 19 09:43:28 2020 LaszloGeneralStatus of the ESR After two days of tuning the beam, yesterday
evening (~8pm), it was found out that within
one ESR pattern using the new control system
  
  64   Thu Mar 19 15:09:29 2020 JanGeneralstarting off with DSSSD here is my short guide how to start with the
measurement as soon as we have a beam available.
  
  65   Thu Mar 19 19:14:40 2020 LaszloGeneralprimary beam measurement Now our aim is to decelerate the primary beam
(naked 124Xe) down to 10MeV/u. At this energy
we can test our detectors and that how the
  
  66   Thu Mar 19 23:48:56 2020 LaszloGeneral124Xe primary beam at 10Mev TargetOFF Beam lifetime is estimated to be 11sec at
least (hard to.see with the cursor the corrct
values on the shottky monitor) 
 IMG_20200319_232647.jpgIMG_20200319_232704.jpgIMG_20200319_234450.jpg 
  67   Fri Mar 20 01:11:58 2020 LaszloGeneralTarget - beam jntersection We have managed to find the target position
with the beam by looking at the xray spectra.
The trick was that at 10mev we 
 IMG_20200320_011008.jpg 
  68   Fri Mar 20 01:21:00 2020 LaszloGeneraltarget is switched on event based     
  70   Fri Mar 20 01:36:48 2020 LaszloGeneral124Xe primary beam at 10Mev TargetON We didmt see any effect on the lifetime if
the target is switched on. It is because
we use only hydrogen target (but why 
  
  84   Fri Mar 20 16:48:00 2020 LaszloGeneralflipped Si shaper output in x and y Yesterday evening we have found out that the
energy signals from the silicon are negative
--> wrong polarity of the shapers was chosen
  
  89   Fri Mar 20 22:51:36 2020 LaszloGeneralTarget on signal change From the previous settings:
JetOn
  mashine number 11
 IMG_20200320_223918.jpgIMG_20200320_224306.jpgIMG_20200320_224614.jpg 
  90   Fri Mar 20 22:54:30 2020 LaszloGeneralFirst view of the beam Intensity from Sis 1.7E9
The intensity is too.low at ESR to be visible.
However we could.catch it somehow with Shottky
 IMG_20200320_222748.jpgIMG_20200320_223424.jpg 
  91   Fri Mar 20 23:43:26 2020 LaszloGeneralVacuum while moving in the detector at yesterday evening Vacuum before DSSSD movement: 1.5844E-11
Top value after movement: 3.64378E-11
 DSSSD_moving_vacuum_change.JPGIMG_20200320_021131.jpg 
  92   Sat Mar 21 01:25:07 2020 LaszloGeneralVacuum while moving in the detector for fragment measurement Stayed below E-10
Start:2.42E-11
Top after moving: 4.144E-11
 DSSSD_moving_vacuum_change1.JPG 
  93   Sat Mar 21 01:44:57 2020 LaszloGeneral  from the SIS side they could optimize the
intensity. we gained a factor ~3. Now the
SIS intensity is at 
  
  97   Sat Mar 21 02:36:44 2020 LaszloGeneraldetector and scraper position For the 124Xe primary beam measurement:
-with the DSSSD we scraped the beam at position
-40
 IMG_20200321_025644.jpg 
ELOG V3.1.5-fc6679b