HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 16 of 29  Not logged in ELOG logo
Entry  Fri Jun 28 14:06:28 2019, Jan, General, CAD of (p,g) setup,  
 
Entry  Wed Sep 25 13:58:24 2019, Laszlo, General, Gamow window energies for 118Te(p,g),  PhysRevC.81.045807.pdf
# Z   A   Iso Re Rc   T9 upper width mxpos  shift
 52 118 te118 pg 20  0.5  1.39  0.58  1.06  -0.01
 52 118 te118 pg 20  1.0  2.27  1.04  1.69  -0.01
Entry  Fri Feb 21 11:29:02 2020, Laszlo, General, Shift plan,  
https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0
Entry  Wed Mar 11 14:33:44 2020, Laszlo, General, beam time manual,  E127_experimental_manual.pdfmanual.odt
Here you can find the digital version of the E127 beam time manual.
Entry  Tue Mar 17 08:15:49 2020, Jan, General, current grids & screen in TE ,  2020-03-16_18-51-50-170.pngIMG_0694.jpg
measured beam diagnosis with 124Xe48+ at 326 MeV/u
Entry  Wed Mar 18 09:53:28 2020, Laszlo, Jan, General, vacuum after opening gate valve,  vacuum_ESR1.jpgvacuum_setup1.jpg
Gate valve to DSSSD setup was opened on Tue 17.03. ~9:00

The vacuum on Wed 18.03. ~9:00 was
Entry  Thu Mar 19 09:43:28 2020, Laszlo, General, Status of the ESR,  
After two days of tuning the beam, yesterday evening (~8pm), it was found out that within one ESR pattern using the new control system the harmonics of
the cavities cannot be changed. This gives us a fatal limitation, that we cannot go lower 
than 10MeV/u with the beam energy.
Entry  Thu Mar 19 15:09:29 2020, Jan, General, starting off with DSSSD,  
here is my short guide how to start with the measurement as soon as we have a beam available.

0. ESR timing in DAQ (maybe Uwe can also assist here)
Entry  Thu Mar 19 19:14:40 2020, Laszlo, General, primary beam measurement,  
Now our aim is to decelerate the primary beam (naked 124Xe) down to 10MeV/u. At this energy we can test our detectors and that how the scraping works. In
addition, in the E108b experiment, 124Xe(p,g), there is no measurement point at 10MeV/u.
Entry  Thu Mar 19 23:48:56 2020, Laszlo, General, 124Xe primary beam at 10Mev TargetOFF,  IMG_20200319_232647.jpgIMG_20200319_232704.jpgIMG_20200319_234450.jpg
Beam lifetime is estimated to be 11sec at least (hard to.see with the cursor the corrct values on the shottky monitor) 
but Yury says it is even 
~20sec. The particle njmbers are on the attached picture, however at 10Mev the cirrent measurement is not.really 
Entry  Fri Mar 20 01:11:58 2020, Laszlo, General, Target - beam jntersection,  IMG_20200320_011008.jpg
We have managed to find the target position with the beam by looking at the xray spectra. The trick was that at 10mev we 
only have a low increase in the xray rates, so.we went for 400Mev/u where the rate change was dramatic (see in the 
picture)
Entry  Fri Mar 20 01:21:00 2020, Laszlo, General, target is switched on event based,  
 
Entry  Fri Mar 20 01:36:48 2020, Laszlo, General, 124Xe primary beam at 10Mev TargetON,  
We didmt see any effect on the lifetime if the target is switched on. It is because we use only hydrogen target (but why 
is.it so?)
Entry  Fri Mar 20 16:48:00 2020, Laszlo, General, flipped Si shaper output in x and y,  
Yesterday evening we have found out that the energy signals from the silicon are negative --> wrong polarity of the shapers was chosen while using the jumpers.
Cables coming from the preamp are switched now. --> in the recorded data the X and Y coordinates of the Si strip detector is the other way around!
Hopefully, the left and right side we can judge well...
Entry  Fri Mar 20 22:51:36 2020, Laszlo, General, Target on signal change,  IMG_20200320_223918.jpgIMG_20200320_224306.jpgIMG_20200320_224614.jpg
From the previous settings:
JetOn
  mashine number 11
Entry  Fri Mar 20 22:54:30 2020, Laszlo, General, First view of the beam,  IMG_20200320_222748.jpgIMG_20200320_223424.jpg
Intensity from Sis 1.7E9
The intensity is too.low at ESR to be visible. However we could.catch it somehow with Shottky (picture below)
Entry  Fri Mar 20 23:43:26 2020, Laszlo, General, Vacuum while moving in the detector at yesterday evening,  DSSSD_moving_vacuum_change.JPGIMG_20200320_021131.jpg
Vacuum before DSSSD movement: 1.5844E-11
Top value after movement: 3.64378E-11
Entry  Sat Mar 21 01:25:07 2020, Laszlo, General, Vacuum while moving in the detector for fragment measurement,  DSSSD_moving_vacuum_change1.JPG
Stayed below E-10
Start:2.42E-11
Top after moving: 4.144E-11
Entry  Sat Mar 21 01:44:57 2020, Laszlo, General, ,  
from the SIS side they could optimize the intensity. we gained a factor ~3. Now the SIS intensity is at 
Entry  Sat Mar 21 02:36:44 2020, Laszlo, General, detector and scraper position,  IMG_20200321_025644.jpg
For the 124Xe primary beam measurement:
-with the DSSSD we scraped the beam at position -40
-position of the detector is set to -25. (1.5cm away from the beam)
ELOG V3.1.5-fc6679b