HOME
ESR
EXPERIMENTS
LABS etc
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
proton-capture on 118Te, Page 19 of 29
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Category --
Analysis
Calibration
DAQ
General
Collaboration
Runs
Detectors
Simulations
Accelerator
572 Entries
Goto page
Previous
1
,
2
,
3
...
18
, 19,
20
...
27
,
28
,
29
Next
ID
Date
Author
Category
Subject
Year
Text
67
Fri Mar 20 01:11:58 2020
Laszlo
General
Target - beam jntersection
We have managed to find the target position
with the beam by looking at the xray spectra.
The trick was that at 10mev we
68
Fri Mar 20 01:21:00 2020
Laszlo
General
target is switched on event based
69
Fri Mar 20 01:22:23 2020
Shahab
Runs
Setting for Gas target
Setting for the machines.
70
Fri Mar 20 01:36:48 2020
Laszlo
General
124Xe primary beam at 10Mev TargetON
We didmt see any effect on the lifetime if
the target is switched on. It is because
we use only hydrogen target (but why
71
Fri Mar 20 04:29:45 2020
Jan
DAQ
DAQ settings for the first night
72
Fri Mar 20 04:32:22 2020
Shahab
Runs
run entry - run046
beam: 124Xe54+
energy: 10 MeV/u
73
Fri Mar 20 05:03:03 2020
Shahab
Runs
run entry - run046
beam: 124Xe54+
energy: 10 MeV/u
74
Fri Mar 20 05:32:44 2020
Shahab
Runs
run entry - run047
beam: 124Xe54+
energy: 10 MeV/u
75
Fri Mar 20 06:00:26 2020
Shahab
Runs
run entry - run047
beam: 124Xe54+
energy: 10 MeV/u
76
Fri Mar 20 06:34:40 2020
Shahab
Runs
run entry - run048
beam: 124Xe54+
energy: 10 MeV/u
77
Fri Mar 20 07:01:06 2020
Shahab
Runs
run entry - run048
beam: 124Xe54+
energy: 10 MeV/u
78
Fri Mar 20 07:30:16 2020
Ragan, RuiJiu
Runs
run entry - run049
beam: 124Xe54+
energy: 10 MeV/u
79
Fri Mar 20 08:01:40 2020
Ragan, RuiJiu
Runs
run entry - run049
beam: 124Xe54+
energy: 10 MeV/u
80
Fri Mar 20 08:30:52 2020
Ragan, RuiJiu
Runs
run entry - run049
There is no beam due to water leakage in the
transfer channel of SIS.
81
Fri Mar 20 10:28:31 2020
Ragan, RuiJiu
Runs
run entry - run050
Beam is back at 10:27 am.
Open file: runstart050
82
Fri Mar 20 11:00:25 2020
Ragan, RuiJiu
Runs
run entry - run050
Yuri and ESR team are optimising
the deceleration in ESR.
DSSSD detector is taken out at
83
Fri Mar 20 13:21:33 2020
Jan, Laszlo
Analysis
124Xe data of first night
The unpacked data of all runs from the first
night (46-50) is located at
litv-exp@lxg0188:/data.local2/E127_lmd/124Xe_1st_night.root
84
Fri Mar 20 16:48:00 2020
Laszlo
General
flipped Si shaper output in x and y
Yesterday evening we have found out that the
energy signals from the silicon are negative
--> wrong polarity of the shapers was chosen
85
Fri Mar 20 16:54:53 2020
Jan
DAQ
BaF OFF downscaled red=32
I introduced a downscaling by a factor of
2^5=32 for the BaF2 during target OFF.
The reason is, that we get a lot reasonable
86
Fri Mar 20 16:58:02 2020
Jan
DAQ
Xray2 & Xray3 cabling
We found that Xray2 and Xray3 the cabling
is not consistent:
Goto page
Previous
1
,
2
,
3
...
18
, 19,
20
...
27
,
28
,
29
Next
ELOG V3.1.5-fc6679b