HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te, Page 19 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subject Yeardown Text Attachments
  67   Fri Mar 20 01:11:58 2020 LaszloGeneralTarget - beam jntersection We have managed to find the target position
with the beam by looking at the xray spectra.
The trick was that at 10mev we 
 IMG_20200320_011008.jpg 
  68   Fri Mar 20 01:21:00 2020 LaszloGeneraltarget is switched on event based     
  69   Fri Mar 20 01:22:23 2020 ShahabRunsSetting for Gas target Setting for the machines.  IMG_20200320_012048.jpg 
  70   Fri Mar 20 01:36:48 2020 LaszloGeneral124Xe primary beam at 10Mev TargetON We didmt see any effect on the lifetime if
the target is switched on. It is because
we use only hydrogen target (but why 
  
  71   Fri Mar 20 04:29:45 2020 JanDAQDAQ settings for the first night    e127.trlomain.cfgr3bfuser.cfgsetting.1584673412 
  72   Fri Mar 20 04:32:22 2020 ShahabRunsrun entry - run046 beam: 124Xe54+
energy: 10 MeV/u
  
  73   Fri Mar 20 05:03:03 2020 ShahabRunsrun entry - run046 beam: 124Xe54+
energy: 10 MeV/u
  
  74   Fri Mar 20 05:32:44 2020 ShahabRunsrun entry - run047 beam: 124Xe54+
energy: 10 MeV/u
  
  75   Fri Mar 20 06:00:26 2020 ShahabRunsrun entry - run047 beam: 124Xe54+
energy: 10 MeV/u
  
  76   Fri Mar 20 06:34:40 2020 ShahabRunsrun entry - run048 beam: 124Xe54+
energy: 10 MeV/u
  
  77   Fri Mar 20 07:01:06 2020 ShahabRunsrun entry - run048 beam: 124Xe54+
energy: 10 MeV/u
  
  78   Fri Mar 20 07:30:16 2020 Ragan, RuiJiuRunsrun entry - run049 beam: 124Xe54+
energy: 10 MeV/u
  
  79   Fri Mar 20 08:01:40 2020 Ragan, RuiJiuRunsrun entry - run049 beam: 124Xe54+
energy: 10 MeV/u
  
  80   Fri Mar 20 08:30:52 2020 Ragan, RuiJiuRunsrun entry - run049 There is no beam due to water leakage in the
transfer channel of SIS.
  
  81   Fri Mar 20 10:28:31 2020 Ragan, RuiJiuRunsrun entry - run050 Beam is back at 10:27 am.
Open file: runstart050
  
  82   Fri Mar 20 11:00:25 2020 Ragan, RuiJiuRunsrun entry - run050 Yuri and ESR team are optimising 
the deceleration in ESR.
DSSSD detector is taken out at 
 IMG_20200320_111413.jpg 
  83   Fri Mar 20 13:21:33 2020 Jan, LaszloAnalysis124Xe data of first night The unpacked data of all runs from the first
night (46-50) is located at
litv-exp@lxg0188:/data.local2/E127_lmd/124Xe_1st_night.root
 90_deg.png35_deg.png145_deg.pngimage3063.pngimage4019.png 
  84   Fri Mar 20 16:48:00 2020 LaszloGeneralflipped Si shaper output in x and y Yesterday evening we have found out that the
energy signals from the silicon are negative
--> wrong polarity of the shapers was chosen
  
  85   Fri Mar 20 16:54:53 2020 JanDAQBaF OFF downscaled red=32 I introduced a downscaling by a factor of
2^5=32 for the BaF2 during target OFF.
The reason is, that we get a lot reasonable
  
  86   Fri Mar 20 16:58:02 2020 JanDAQXray2 & Xray3 cabling We found that Xray2 and Xray3 the cabling
is not consistent:
  
ELOG V3.1.5-fc6679b