  38  
 | 
Tue Mar 10 09:41:26 2020 | 
Jan | Detectors | x-ray background from BaF |   | The BaF2 detectors planned to be installed 
at the target induce an additional background 
in the x-ray detectors sitting below inside | 
   | 
| 
  241  
 | 
Mon Mar 23 12:30:39 2020 | 
laszlo | Analysis | with and without scraper |   |   | 
       | 
| 
  62  
 | 
Wed Mar 18 09:53:28 2020 | 
Laszlo, Jan | General | vacuum after opening gate valve |   | Gate valve to DSSSD setup was opened on Tue 
17.03. ~9:00
 
 | 
     | 
| 
  277  
 | 
Thu Apr 23 19:09:58 2020 | 
Laszlo | Calibration | theoretical K-REC cross sections  |   | Find attached Andrey Surzhykov's calculations 
for the theta angle in respect to the beam 
direction (in lab. frame) vs. cross section | 
 9x   | 
| 
  48  
 | 
Sun Mar 15 17:13:21 2020 | 
Laszlo, Jan | Calibration | the x-ray gate issue |   | We found a strange behaviour of our ADC gates 
for the x-ray detectors.
 
The setting as shown in the foto below corresponds | 
    | 
| 
  291  
 | 
Thu Apr 22 10:56:20 2021 | 
Jan | Detectors | target-chamber det. distances | 2021 | This is the lookup table for the distance 
of each x-ray detector to the target.
 
See attached foto for explanation.
 | 
    | 
| 
  130  
 | 
Sat Mar 21 14:52:05 2020 | 
Laszlo | General | target optimization |   | previous position of the beam at target was 
-3mm (for the night position)
 
max. intensity position of the beam at target | 
     | 
| 
  68  
 | 
Fri Mar 20 01:21:00 2020 | 
Laszlo | General | target is switched on event based |   |   | 
   | 
| 
  147  
 | 
Sat Mar 21 21:36:06 2020 | 
Jan | Runs | target incident |   | in run 66 or 67 we had a single ESR cycle 
for which the target didn't switch off for 
new injection and deceleration etc.
 | 
    | 
| 
  201  
 | 
Sun Mar 22 18:35:43 2020 | 
Laszlo |   | target dropped aagain |   | there was a drop again from 8.6e13 to 7e13 
in the target density | 
    | 
| 
  361  
 | 
Fri May 21 10:00:51 2021 | 
Jan | Accelerator | target bump | 2021 | The target overlap was optimized on xray and 
si rates.
 
The setting now is -10mm in SC9 | 
   | 
| 
  198  
 | 
Sun Mar 22 17:45:07 2020 | 
Laszlo | General | switching to primary beam |   | We have finished the measurement with the 
fragments.
 
 | 
   | 
| 
  64  
 | 
Thu Mar 19 15:09:29 2020 | 
Jan | General | starting off with DSSSD |   | here is my short guide how to start with the 
measurement as soon as we have a beam available.
 
 | 
   | 
| 
  22  
 | 
Wed Sep 25 13:03:46 2019 | 
Laszlo | Analysis | simulations on 118Te+p |   | I have made some simulations at 8AMeV, 7AMeV 
and 4AMeV energies for the main 118Te + p 
reaction channels. For the
 | 
 11x   | 
| 
  360  
 | 
Fri May 21 01:17:37 2021 | 
Laszlo | Analysis | simple analysis code | 2021 | //a simple code (template) for offline analysis
 
//made by Laszlo, serves as a simple demonstration 
for enthusiastic shifters
 | 
   | 
| 
  30  
 | 
Thu Dec  5 10:57:57 2019 | 
Jan, Laszlo | Detectors | setting up the DSSD with beam |   | This is a brief how-to about getting the DSSSD 
set up with stored beam and target in the 
ESR.
 | 
   | 
| 
  244  
 | 
Mon Mar 23 13:26:59 2020 | 
Jan | Analysis | runs_90to99 SCRAPER RESULTS |   | With scraper, we have roughly 150-200 (p,g) 
counts now.
 
 | 
        | 
| 
  251  
 | 
Mon Mar 23 14:32:03 2020 | 
Jan | Analysis | runs_100to104 NO-SCRAPER RESULTS |   | Without scraper, we have very few (p,g) counts, 
hard to get numbers quickly, maybe ~50.
 
 | 
        | 
| 
  5  
 | 
Fri Apr  5 05:46:20 2019 | 
Jan | DAQ | running DRASI for (p,g) |   | We now have a drasi DAQ running for our (p,g) 
experiments.
 
The RIO we have it installed right now is: | 
   | 
| 
  123  
 | 
Sat Mar 21 12:06:50 2020 | 
Laszlo | General | run61 - SCRAPER moved out |   | we want to see any change on the Silicon count 
rate, because we will have now also Rutherford 
scattering.  | 
   |