Fri Mar 20 04:29:45 2020, Jan, DAQ, DAQ settings for the first night,
|
|
Fri Mar 20 16:54:53 2020, Jan, DAQ, BaF OFF downscaled red=32,
|
I introduced a downscaling by a factor of 2^5=32 for the BaF2 during target OFF.
The reason is, that we get a lot reasonable x-ray counts (K-alpha, K-REC) outside target ON phase.
So i want to minimize our deadtime during target OFF, to be able to use the data efficiently if needed.
|
Fri Mar 20 16:58:02 2020, Jan, DAQ, Xray2 & Xray3 cabling,
|
We found that Xray2 and Xray3 the cabling is not consistent:
90 degree detector
|
Sat Mar 21 22:57:28 2020, Laszlo, Jan, DAQ, changing cables of the Xray 90 and 145,
|
Energy signals of 90 and 145 degree detector have been checked and exchanged
They were connected to the wrong ADC channel.
|
Mon Mar 23 14:23:01 2020, Pierre-Michel, DAQ, Backup recoil files,
|
Recoil detector files backup to lxg1260:/data.local2/hillenbrand/Laszlo |
Fri Apr 30 10:55:34 2021, Jan Glorius, DAQ, Xray multi-triggers - blocking gate, 2021
|
From the CFD of Xray1 (90deg) we get multiple trigger signals every ~5sec for unknown reasons.
No hint from the preamp signals.
|
Thu May 6 11:03:46 2021, Jan Glorius, DAQ, Cabling Documentation, 2021
|
|
Sun May 16 12:55:48 2021, Jan Glorius, DAQ, event server lxg1299:6003, 2021
|
new event server is set up at lxg1299 on port 6003
It runs as:
/data.local1/gstore/mrevserv64 lxg1275 |
Sun May 16 13:31:49 2021, Laszlo, DAQ, Cabling Documentation, 2021
|
Si HV and current was switched in the last documentation. |
Mon May 24 06:30:42 2021, Ragan, DAQ, NTCAP, 2021
|
NTCAP started for recording Schottky data
SC_2021-05-24_06-29-31
|
Thu Jun 24 09:43:01 2021, Jan Glorius, DAQ, Unpacker, 2021
|
The unpacker used for the production runs of E127b is located at
/u/litv-exp/unpacker/unpackexps/e127_TO_2021_with_ECL
|
Wed Oct 13 15:15:53 2021, Jan, DAQ, root-file header for analysis, 2021
|
Attached is the header file needed for root analysis. |
Thu Sep 13 11:42:33 2018, Jan Glorius, Collaboration, Proposal,
|
Attached is the beam time proposal submitted and accepted by the G-PAC in 2017. |
Wed Oct 13 15:09:04 2021, Jan, Collaboration, K-REC cross sections A. Surzhykov, 2021
|
Attached are the theory K-REC cross sections as calculated by Andrey Surzhykov (August 2021).
They are done for 118Te52+ on H2 at 7.049 and 6.042 MeV/u as well as for 124Xe54+ on H2 at 7.049 MeV/u.
|
Sun Mar 15 09:42:40 2020, Jan, Calibration, run030 - Xray90 calib Am241,
|
measurement with old tennelec specAmps, do not use for efficiency!
Detector: 90
|
Sun Mar 15 13:08:38 2020, Jan, Calibration, run031 - Xray90 calib Ba133 hi-rate,
|
measurement with old tennelec specAmps, do not use for efficiency!
Detector: 90
|
Sun Mar 15 13:40:11 2020, Jan, Calibration, run032 - Xray90 calib Ba133,
|
measurement with old tennelec specAmps, do not use for efficiency!
Detector: 90
|
Sun Mar 15 13:52:05 2020, Jan, Calibration, run033 - Xray145 calib Am241,
|
measurement with old tennelec specAmps, do not use for efficiency!
Detector: 145
|
Sun Mar 15 14:41:34 2020, Jan, Calibration, run034 - Xray145 calib B133 high rate -SOURCE MOVED!,
|
measurement with old tennelec specAmps, do not use for efficiency!
The source moved during the calibration, measurement stopped at half time.
|
Sun Mar 15 15:08:44 2020, Jan, Calibration, run035 - Xray145 calib B133 high rate,
|
measurement with old tennelec specAmps, do not use for efficiency!
Detector: 145
|