HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 22 of 29  Not logged in ELOG logo
Entry  Fri Mar 20 04:29:45 2020, Jan, DAQ, DAQ settings for the first night,  e127.trlomain.cfgr3bfuser.cfgsetting.1584673412
 
Entry  Fri Mar 20 16:54:53 2020, Jan, DAQ, BaF OFF downscaled red=32,  
I introduced a downscaling by a factor of 2^5=32 for the BaF2 during target OFF.
The reason is, that we get a lot reasonable x-ray counts (K-alpha, K-REC) outside target ON phase.
So i want to minimize our deadtime during target OFF, to be able to use the data efficiently if needed.
Entry  Fri Mar 20 16:58:02 2020, Jan, DAQ, Xray2 & Xray3 cabling,  
We found that Xray2 and Xray3 the cabling is not consistent:

90 degree detector 
Entry  Sat Mar 21 22:57:28 2020, Laszlo, Jan, DAQ, changing cables of the Xray 90 and 145,  
Energy signals of 90 and 145 degree detector have been checked and exchanged
They were connected to the wrong ADC channel.
Entry  Mon Mar 23 14:23:01 2020, Pierre-Michel, DAQ, Backup recoil files,  
Recoil detector files backup to lxg1260:/data.local2/hillenbrand/Laszlo
Entry  Fri Apr 30 10:55:34 2021, Jan Glorius, DAQ, Xray multi-triggers - blocking gate, 2021 
From the CFD of Xray1 (90deg) we get multiple trigger signals every ~5sec for unknown reasons. 
No hint from the preamp signals.
Entry  Thu May 6 11:03:46 2021, Jan Glorius, DAQ, Cabling Documentation, 2021 e127b_cabling_docu_06_05_2021_.pdfe127b_2021_cabling_documentation.xlsx
 
Entry  Sun May 16 12:55:48 2021, Jan Glorius, DAQ, event server lxg1299:6003, 2021 
new event server is set up at lxg1299 on port 6003
It runs as:
/data.local1/gstore/mrevserv64 lxg1275
Entry  Sun May 16 13:31:49 2021, Laszlo, DAQ, Cabling Documentation, 2021 e127b_2021_cabling_documentation.xlsx
Si HV and current was switched in the last documentation.
Entry  Mon May 24 06:30:42 2021, Ragan, DAQ, NTCAP, 2021 
NTCAP started for recording Schottky data

SC_2021-05-24_06-29-31
Entry  Thu Jun 24 09:43:01 2021, Jan Glorius, DAQ, Unpacker, 2021 
The unpacker used for the production runs of E127b is located at 
/u/litv-exp/unpacker/unpackexps/e127_TO_2021_with_ECL
Entry  Wed Oct 13 15:15:53 2021, Jan, DAQ, root-file header for analysis, 2021 e127b.h
Attached is the header file needed for root analysis.
Entry  Thu Sep 13 11:42:33 2018, Jan Glorius, Collaboration, Proposal,  E127_Reifarth_pg.pdfE127_Approval.pdf
Attached is the beam time proposal submitted and accepted by the G-PAC in 2017.    
Entry  Wed Oct 13 15:09:04 2021, Jan, Collaboration, K-REC cross sections A. Surzhykov, 2021 DCS_Z_52_Tp_7.049MeV_NEW.datDCS_Z_54_Tp_7.049MeV_NEW.datDCS_Z_52_Tp_6.042MeV_NEW.dat
Attached are the theory K-REC cross sections as calculated by Andrey Surzhykov (August 2021).

They are done for 118Te52+ on H2 at 7.049 and 6.042 MeV/u as well as for 124Xe54+ on H2 at 7.049 MeV/u.
Entry  Sun Mar 15 09:42:40 2020, Jan, Calibration, run030 - Xray90 calib Am241,  
measurement with old tennelec specAmps, do not use for efficiency!

Detector: 90
Entry  Sun Mar 15 13:08:38 2020, Jan, Calibration, run031 - Xray90 calib Ba133 hi-rate,  
measurement with old tennelec specAmps, do not use for efficiency!

Detector: 90
Entry  Sun Mar 15 13:40:11 2020, Jan, Calibration, run032 - Xray90 calib Ba133,  
measurement with old tennelec specAmps, do not use for efficiency!

Detector: 90
Entry  Sun Mar 15 13:52:05 2020, Jan, Calibration, run033 - Xray145 calib Am241,  
measurement with old tennelec specAmps, do not use for efficiency!

Detector: 145
Entry  Sun Mar 15 14:41:34 2020, Jan, Calibration, run034 - Xray145 calib B133 high rate -SOURCE MOVED!,  
measurement with old tennelec specAmps, do not use for efficiency!

The source moved during the calibration, measurement stopped at half time.
Entry  Sun Mar 15 15:08:44 2020, Jan, Calibration, run035 - Xray145 calib B133 high rate,  
measurement with old tennelec specAmps, do not use for efficiency!

Detector: 145
ELOG V3.1.5-fc6679b