| ID | Date | Author | Category | Subject | Year | Text |  | 
| 134 | Sat Mar 21 15:30:34 2020 | Sergiy | General | go into the ESR |  | We are going into the ESR to check the electronics. Use calibration sources (133Ba etc).
 |  | 
| 133 | Sat Mar 21 15:26:49 2020 | Laszlo | General | SCRAPER is ON use again |  | Yuri puts back the scraper (Egelhof 1 - GE01DD1IG) into position = +19. (where it was in the
 evening)
 |  | 
| 132 | Sat Mar 21 15:23:57 2020 | Sergiy | Runs | run entry - run063 |  | open file : run063 
 beam: 118Te52+
 |  | 
| 130 | Sat Mar 21 14:52:05 2020 | Laszlo | General | target optimization |  | previous position of the beam at target was -3mm (for the night position)
 max. intensity position of the beam at target
 |    | 
| 129 | Sat Mar 21 13:44:16 2020 | Pierre-Michel | Detectors | Recoil detector |  | We turn on Recoil detector, to use it as a monitor for target overlap.
 
 |   | 
| 128 | Sat Mar 21 13:37:53 2020 | Laszlo |  | MCP can monitor target |  | now with the MCP we can see clearly the effect of the target :) (scintillation?)
 so we want to scan through the target thickness
 |  | 
| 127 | Sat Mar 21 13:24:10 2020 | Laszlo | Runs | run entry - run063 |  | open file : run063 
 beam: 118Te52+
 |  | 
| 126 | Sat Mar 21 12:42:21 2020 | Ragan | General | Entry to ESR for MCP detector |  | Pierre Michel and Laszlo go inside the ESR for switching on the MCP detector so that
 the photons from the gas jet and secondary
 |  | 
| 125 | Sat Mar 21 12:32:00 2020 | Laszlo | General | Estimated target thickness |  | Target thickness must be like 5mm (was measured with a moving thin wire)
 The beam thickness is small because of the
 |  | 
| 124 | Sat Mar 21 12:30:30 2020 | Ragan | Runs | run entry - run061 |  | beam: 118Te52+
 energy: 10 MeV/u
 |  | 
| 123 | Sat Mar 21 12:06:50 2020 | Laszlo | General | run61 - SCRAPER moved out |  | we want to see any change on the Silicon count rate, because we will have now also Rutherford
 scattering.
 |  | 
| 122 | Sat Mar 21 12:02:57 2020 | Ragan, Laszlo | General | run entry - run061 |  | 12:02 pm - scapper is taken out completely 
 open file : runstart061
 |  | 
| 121 | Sat Mar 21 12:00:27 2020 | Ragan, Alex | Runs | run entry - run060 |  | beam: 118Te52+
 energy: 10 MeV/u
 |  | 
| 120 | Sat Mar 21 11:32:46 2020 | Ragan, Alex | Runs | run entry - run060 |  | Open file: runstart060 
 beam: 118Te52+
 |  | 
| 119 | Sat Mar 21 11:30:04 2020 | Laszlo | General | MWPC movement |  | now we try to move the capture detector (MWPC in the 1. dipol before our Si setup) inside
 the ring while the DAQ was ON
 |   | 
| 118 | Sat Mar 21 11:25:47 2020 | Laszlo |  | possible misalignement between target and fragment beam |  | after 9hours of measurement we see only 19 counts on our targetON silicon detector histo.
 this low count rate can indicate two scenarios:
 |   | 
| 117 | Sat Mar 21 11:04:47 2020 | Ragan,  Alex, Laszlo | Runs | run entry - run059 |  | beam: 118Te52+ energy: 10 MeV/u
 
 |  | 
| 116 | Sat Mar 21 10:28:23 2020 | Ragan,  Alex | Runs | run entry - run059 |  | Open file: runstart059 
 beam: 118Te52+
 |  | 
| 115 | Sat Mar 21 10:20:27 2020 | Ragan, Alex | General | Target LN2 |  | The LN2 Dewar on the ESR roof has been refilled. |  | 
| 114 | Sat Mar 21 10:00:19 2020 | Ragan, Alex | Runs | run entry - run058 |  | beam: 118Te52+ energy: 10 MeV/u
 
 |  |