HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 23 of 29  Not logged in ELOG logo
Entry  Sat Mar 21 13:44:16 2020, Pierre-Michel, Detectors, Recoil detector,  Recoil.pdf
We turn on Recoil detector, to use it as a monitor for target overlap.

MCP front -2500 V for highest signal rate. 
Entry  Sat Mar 21 13:37:53 2020, Laszlo, , MCP can monitor target,  
now with the MCP we can see clearly the effect of the target :) (scintillation?)
so we want to scan through the target thickness with the beam and choose the best position afterwards.
Entry  Sat Mar 21 13:24:10 2020, Laszlo, Runs, run entry - run063,  
open file : run063

beam: 118Te52+
Entry  Sat Mar 21 12:42:21 2020, Ragan, General, Entry to ESR for MCP detector,  
Pierre Michel and Laszlo go inside the ESR for switching on the MCP detector so that the photons from the gas jet and secondary beam interaction can be
seen.
Entry  Sat Mar 21 12:32:00 2020, Laszlo, General, Estimated target thickness,  
Target thickness must be like 5mm (was measured with a moving thin wire)
The beam thickness is small because of the low intensity
Maybe we hit the target a bit offset --> less rate?
Entry  Sat Mar 21 12:30:30 2020, Ragan, Runs, run entry - run061,  

beam: 118Te52+
energy: 10 MeV/u
Entry  Sat Mar 21 12:06:50 2020, Laszlo, General, run61 - SCRAPER moved out,  
we want to see any change on the Silicon count rate, because we will have now also Rutherford scattering. 
Entry  Sat Mar 21 12:02:57 2020, Ragan, Laszlo, General, run entry - run061,  
12:02 pm - scapper is taken out completely 
open file : runstart061
Entry  Sat Mar 21 12:00:27 2020, Ragan, Alex, Runs, run entry - run060,  

beam: 118Te52+
energy: 10 MeV/u
Entry  Sat Mar 21 11:32:46 2020, Ragan, Alex, Runs, run entry - run060,  
Open file: runstart060

beam: 118Te52+
Entry  Sat Mar 21 11:30:04 2020, Laszlo, General, MWPC movement,  MWPC_movement.png
now we try to move the capture detector (MWPC in the 1. dipol before our Si setup) inside the ring while the DAQ was ON

we tried to move it as close as possible to the beam
Entry  Sat Mar 21 11:25:47 2020, Laszlo, , possible misalignement between target and fragment beam,  Te_measurement_after_first_night.png
after 9hours of measurement we see only 19 counts on our targetON silicon detector histo. this low count rate can indicate two scenarios:
-we have a mismatch between the beam and the target (not much if any overlap)
-mabye the very low intersity of the beam (we cannot really monitor this, there are only estimates...)
Entry  Sat Mar 21 11:04:47 2020, Ragan, Alex, Laszlo, Runs, run entry - run059,  
beam: 118Te52+
energy: 10 MeV/u
Entry  Sat Mar 21 10:28:23 2020, Ragan, Alex, Runs, run entry - run059,  
Open file: runstart059

beam: 118Te52+
Entry  Sat Mar 21 10:20:27 2020, Ragan, Alex, General, Target LN2,  
The LN2 Dewar on the ESR roof has been refilled.
Entry  Sat Mar 21 10:00:19 2020, Ragan, Alex, Runs, run entry - run058,  
beam: 118Te52+
energy: 10 MeV/u
Entry  Sat Mar 21 09:30:32 2020, Ragan, RuiJiu, Alex, Runs, run entry - run058,  
Open file: runstart058

beam: 118Te52+
Entry  Sat Mar 21 09:00:29 2020, Ragan, RuiJiu, Runs, run entry - run057,  
beam: 118Te52+
energy: 10 MeV/u
Entry  Sat Mar 21 08:31:27 2020, Ragan, RuiJiu, Runs, run entry - run057,  
Open file: runstart057

beam: 118Te52+
Entry  Sat Mar 21 08:01:03 2020, Ragan, RuiJiu, Runs, run entry - run056,  
beam: 118Te52+
energy: 10 MeV/u
ELOG V3.1.5-fc6679b