Entry  Fri Mar 20 22:51:36 2020, Laszlo, General, Target on signal change,  IMG_20200320_223918.jpgIMG_20200320_224306.jpgIMG_20200320_224614.jpg
From the previous settings:
JetOn
  mashine number 11
Entry  Fri Mar 20 22:26:42 2020, Jan, Detectors, BaF2 deactivated,  
BaF2 detectors are deactivated nor for the following runs.
Entry  Fri Mar 20 19:37:43 2020, Jan, Calibration, Xray energies - rough 1. calibration ,  
-- E calibration seems to have changed! ---

This calibration is based on the source data taken before the experiment:
Entry  Fri Mar 20 16:58:02 2020, Jan, DAQ, Xray2 & Xray3 cabling,  
We found that Xray2 and Xray3 the cabling is not consistent:

90 degree detector 
Entry  Fri Mar 20 16:54:53 2020, Jan, DAQ, BaF OFF downscaled red=32,  
I introduced a downscaling by a factor of 2^5=32 for the BaF2 during target OFF.
The reason is, that we get a lot reasonable x-ray counts (K-alpha, K-REC) outside target ON phase.
So i want to minimize our deadtime during target OFF, to be able to use the data efficiently if needed.
Entry  Fri Mar 20 16:48:00 2020, Laszlo, General, flipped Si shaper output in x and y,  
Yesterday evening we have found out that the energy signals from the silicon are negative --> wrong polarity of the shapers was chosen while using the jumpers.
Cables coming from the preamp are switched now. --> in the recorded data the X and Y coordinates of the Si strip detector is the other way around!
Hopefully, the left and right side we can judge well...
Entry  Fri Mar 20 13:21:33 2020, Jan, Laszlo, Analysis, 124Xe data of first night,  90_deg.png35_deg.png145_deg.pngimage3063.pngimage4019.png
The unpacked data of all runs from the first night (46-50) is located at
litv-exp@lxg0188:/data.local2/E127_lmd/124Xe_1st_night.root
Entry  Fri Mar 20 11:00:25 2020, Ragan, RuiJiu, Runs, run entry - run050,  IMG_20200320_111413.jpg
Yuri and ESR team are optimising 
the deceleration in ESR.
DSSSD detector is taken out at 
Entry  Fri Mar 20 10:28:31 2020, Ragan, RuiJiu, Runs, run entry - run050,  
Beam is back at 10:27 am.
Open file: runstart050
Entry  Fri Mar 20 08:30:52 2020, Ragan, RuiJiu, Runs, run entry - run049,  
There is no beam due to water leakage in the transfer channel of SIS.

Stop file: run049 at 8:29 am
Entry  Fri Mar 20 08:01:40 2020, Ragan, RuiJiu, Runs, run entry - run049,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 07:30:16 2020, Ragan, RuiJiu, Runs, run entry - run049,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 07:01:06 2020, Shahab, Runs, run entry - run048,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 06:34:40 2020, Shahab, Runs, run entry - run048,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 06:00:26 2020, Shahab, Runs, run entry - run047,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 05:32:44 2020, Shahab, Runs, run entry - run047,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 05:03:03 2020, Shahab, Runs, run entry - run046,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 04:32:22 2020, Shahab, Runs, run entry - run046,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 04:29:45 2020, Jan, DAQ, DAQ settings for the first night,  e127.trlomain.cfgr3bfuser.cfgsetting.1584673412
 
Entry  Fri Mar 20 01:36:48 2020, Laszlo, General, 124Xe primary beam at 10Mev TargetON,  
We didmt see any effect on the lifetime if the target is switched on. It is because we use only hydrogen target (but why 