HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te, Page 25 of 29  Not logged in ELOG logo
Entry  Fri Mar 20 22:51:36 2020, Laszlo, General, Target on signal change,  IMG_20200320_223918.jpgIMG_20200320_224306.jpgIMG_20200320_224614.jpg
From the previous settings:
JetOn
  mashine number 11
Entry  Fri Mar 20 22:26:42 2020, Jan, Detectors, BaF2 deactivated,  
BaF2 detectors are deactivated nor for the following runs.
Entry  Fri Mar 20 19:37:43 2020, Jan, Calibration, Xray energies - rough 1. calibration ,  
-- E calibration seems to have changed! ---

This calibration is based on the source data taken before the experiment:
Entry  Fri Mar 20 16:58:02 2020, Jan, DAQ, Xray2 & Xray3 cabling,  
We found that Xray2 and Xray3 the cabling is not consistent:

90 degree detector 
Entry  Fri Mar 20 16:54:53 2020, Jan, DAQ, BaF OFF downscaled red=32,  
I introduced a downscaling by a factor of 2^5=32 for the BaF2 during target OFF.
The reason is, that we get a lot reasonable x-ray counts (K-alpha, K-REC) outside target ON phase.
So i want to minimize our deadtime during target OFF, to be able to use the data efficiently if needed.
Entry  Fri Mar 20 16:48:00 2020, Laszlo, General, flipped Si shaper output in x and y,  
Yesterday evening we have found out that the energy signals from the silicon are negative --> wrong polarity of the shapers was chosen while using the jumpers.
Cables coming from the preamp are switched now. --> in the recorded data the X and Y coordinates of the Si strip detector is the other way around!
Hopefully, the left and right side we can judge well...
Entry  Fri Mar 20 13:21:33 2020, Jan, Laszlo, Analysis, 124Xe data of first night,  90_deg.png35_deg.png145_deg.pngimage3063.pngimage4019.png
The unpacked data of all runs from the first night (46-50) is located at
litv-exp@lxg0188:/data.local2/E127_lmd/124Xe_1st_night.root
Entry  Fri Mar 20 11:00:25 2020, Ragan, RuiJiu, Runs, run entry - run050,  IMG_20200320_111413.jpg
Yuri and ESR team are optimising 
the deceleration in ESR.
DSSSD detector is taken out at 
Entry  Fri Mar 20 10:28:31 2020, Ragan, RuiJiu, Runs, run entry - run050,  
Beam is back at 10:27 am.
Open file: runstart050
Entry  Fri Mar 20 08:30:52 2020, Ragan, RuiJiu, Runs, run entry - run049,  
There is no beam due to water leakage in the transfer channel of SIS.

Stop file: run049 at 8:29 am
Entry  Fri Mar 20 08:01:40 2020, Ragan, RuiJiu, Runs, run entry - run049,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 07:30:16 2020, Ragan, RuiJiu, Runs, run entry - run049,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 07:01:06 2020, Shahab, Runs, run entry - run048,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 06:34:40 2020, Shahab, Runs, run entry - run048,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 06:00:26 2020, Shahab, Runs, run entry - run047,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 05:32:44 2020, Shahab, Runs, run entry - run047,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 05:03:03 2020, Shahab, Runs, run entry - run046,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 04:32:22 2020, Shahab, Runs, run entry - run046,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 04:29:45 2020, Jan, DAQ, DAQ settings for the first night,  e127.trlomain.cfgr3bfuser.cfgsetting.1584673412
 
Entry  Fri Mar 20 01:36:48 2020, Laszlo, General, 124Xe primary beam at 10Mev TargetON,  
We didmt see any effect on the lifetime if the target is switched on. It is because we use only hydrogen target (but why 
is.it so?)
ELOG V3.1.5-fc6679b