  213   Mon Mar 23 01:17:26 2020 ShahabGeneralLife time measurements using Schottky Did Schottky measurements using 5 shots with
and without gas target each
restarting the DAQ
  
  222   Mon Mar 23 05:55:24 2020 ShahabRunsKicker problem not solved yet no solution to kicker problem.    
  220   Mon Mar 23 03:58:25 2020 ShahabGeneralKicker guy arrived Kicker Guy (U. Blell) arrived in order to
fix modules.
  
  578   Wed Oct 13 15:09:04 2021 JanCollaborationK-REC cross sections A. Surzhykov2021Attached are the theory K-REC cross sections
as calculated by Andrey Surzhykov (August
2021).
 DCS_Z_52_Tp_7.049MeV_NEW.datDCS_Z_54_Tp_7.049MeV_NEW.datDCS_Z_52_Tp_6.042MeV_NEW.dat 
  351   Wed May 19 13:47:26 2021 Jan GloriusGeneralGasTarget Operation2021We have two tasks to take over for the target
operation:
 IMG_20210519_133923186_HDR.jpgIMG_20210519_133629322_HDR.jpg 
  23   Wed Sep 25 13:58:24 2019 LaszloGeneralGamow window energies for 118Te(p,g) # Z   A   Iso Re Rc   T9 upper width mxpos
 shift
 52 118 te118 pg 20  0.5  1.39  0.58  1.06
 PhysRevC.81.045807.pdf 
  59   Mon Mar 16 15:15:22 2020 JanCalibrationGamma- and X-ray intensities for efficiency calib Intensities for special gamma or x-ray lines
needed for efficiency calibration can be
found here:
  
  90   Fri Mar 20 22:54:30 2020 LaszloGeneralFirst view of the beam Intensity from Sis 1.7E9
The intensity is too.low at ESR to be visible.
However we could.catch it somehow with Shottky
 IMG_20200320_222748.jpgIMG_20200320_223424.jpg 
  497   Thu May 27 13:48:18 2021 Helmut WeickAcceleratorFRS wrong status display for one day2021By checking the log files we realized that
from yesterday 26.05. 13:44 - today 13:05
the FRS degrader was shown as out.
 drivestat-log.JPG 
  424   Mon May 24 17:48:04 2021 ErikaGeneralFRS shiftplan, name abbreviations and phone list2021FRS shift plan for this week:
[img]elog:424/1[/img]
 FRS_shiftplan.pngFRS_name_abbreviations.PNGFRS_phone_list.PNG 
  413   Mon May 24 05:20:36 2021 Helmut, Yuri, Faraz, SergeyAcceleratorFRS setup2021Logbook from start of FRS until 118Te injection  14x 
  352   Wed May 19 15:09:22 2021 Helmut WeickGeneralFRS settings, LISE file2021Here is a setting plan for FRS and corresponding
LISE files.
2 LISE files still use the old FRS-ESR optics,
 frequencies-E127.xlsxFRS-settings-E127.docx124Xe_ESR_Predrilling.lpp124Xe_118Te_2mmSci_oldmode.lpp124Xe_118Te_2mmSci_newoptics.lpp 
  496   Thu May 27 13:26:35 2021 JanAcceleratorFRS degrader failure2021Maybe, our degrader in FRS was removed by
hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
  
  125   Sat Mar 21 12:32:00 2020 LaszloGeneralEstimated target thickness Target thickness must be like 5mm (was measured
with a moving thin wire)
The beam thickness is small because of the
  
  126   Sat Mar 21 12:42:21 2020 RaganGeneralEntry to ESR for MCP detector Pierre Michel and Laszlo go inside the ESR
for switching on the MCP detector so that
the photons from the gas jet and secondary
  
  215   Mon Mar 23 01:53:59 2020 ShahabRunsEmpty shots in ESR since about 01:40 AM, there is no beam in
ESR. .
stopped data acquisition
  
  575   Thu Jul 8 13:39:34 2021 JanCalibrationElectron cooler parameters2021Below are the results from the e-cooler voltage
offset measurments done by Regina Hess et
al. using the voltage divider (VD).
  
  573   Wed Jun 23 12:29:35 2021 Jan, SophiaCalibrationEfficiency of the x-ray Detectors 2021For the x-ray detectors, efficiencies have
been measured, before and after the experiment
was performed. 
 Effizienz_x_ray_GEM1800_90.pngEffizienz_x_ray_GEM3000_145.pngEffizienz_x_ray_GLP_35_ohne33keV.png 
  438   Tue May 25 07:51:48 2021 JanAcceleratorESR stacking cycle length2021The full cycle length of ESR with 30 stacks
is about 7:45 minutes, out of which 15.5
sec are with target switched ON.
  
  226   Mon Mar 23 06:49:46 2020 ShahabRunsESR kicker also has some problems     