ID Date Author Categorydown Subject Year
  202   Sun Mar 22 18:41:50 2020 Michael, LaszloRunsrun entry - run088 
Closed file run088 at 17:55. No beam in ESR.
  205   Sun Mar 22 22:00:49 2020 Michael, Laszlo, YuriRunsrun entry - run089 - switched to Primary beam 
Yuri is still tuning, but we are collecting data. Beam is in. Detectors are out.

open file : run089

beam: 124Xe54+ (?)
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 22:00:26 , first file: run089_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 22:02 pm.

ON Rates
Si_X:        Hz
Si_Y:        Hz
Xray_35:     Hz
Xray_90:     Hz
Xray_145:    Hz
BaF_OR:      Hz

Si voltage:          off  
Si leakage current:  off

SIS particles before:           ~3.05e8
ESR current at injection:        380 uA
ESR particles after decel.:     
Target ON density:              

copy and repeat the above (below the line) every 30 minutes
  206   Sun Mar 22 22:06:21 2020 Michael, Laszlo, YuriRunsrun entry - run089 - stopped 
closed file again.

Yuri is still tuning, but we are collecting data. Beam is in. Detectors are out.

open file : run089

beam: 124Xe54+ (?)
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 22:00:26 , first file: run089_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 22:02 pm.

ON Rates
Si_X:        Hz
Si_Y:        Hz
Xray_35:     Hz
Xray_90:     Hz
Xray_145:    Hz
BaF_OR:      Hz

Si voltage:          off  
Si leakage current:  off

SIS particles before:           ~3.05e8
ESR current at injection:        380 uA
ESR particles after decel.:     
Target ON density:              

copy and repeat the above (below the line) every 30 minutes
  207   Sun Mar 22 22:46:56 2020 Michael, Laszlo, YuriRunsrun entry - run090 
Taking data again with primary beam.

open file : run090

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 23:07:10, first file: run087_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 23:10 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   83 Hz
Xray_145:  14 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  3.98 uA


SIS particles before:           ~2e8
ESR current at injection:       297 uA
ESR particles after decel.:     
Target ON density:              6.1e13

copy and repeat the above (below the line) every 30 minutes
  209   Sun Mar 22 23:59:12 2020 ShahabRunsrun entry - run091 
Taking data again with primary beam.

open file : run090

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 23:07:10, first file: run091_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 23:57:53

ON Rates
Si_X:      1 Hz
Si_Y:      1 Hz
Xray_35:   5 Hz
Xray_90:   102 Hz
Xray_145:  35 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.23 uA


SIS particles before:           4.6e8
ESR current at injection:      
ESR particles after decel.:     1.12e7
Target ON density:              5e13

copy and repeat the above (below the line) every 30 minutes
  211   Mon Mar 23 00:36:51 2020 ShahabRunsrun entry - run091 
Taking data again with primary beam.

open file : run091

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 23:07:10, first file: run091_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 00:36

ON Rates
Si_X:      3 Hz
Si_Y:      3 Hz
Xray_35:   1 Hz
Xray_90:   57 Hz
Xray_145:  16 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.25 uA


SIS particles before:           7e8
ESR current at injection:      
ESR particles after decel.:     8.5e6
Target ON density:              5e13

copy and repeat the above (below the line) every 30 minutes
  214   Mon Mar 23 01:18:16 2020 ShahabRunsrun entry - run092 
Taking data again with primary beam.

open file : run092

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 23:07:10, first file: run092_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 01:16

ON Rates
Si_X:      2 Hz
Si_Y:      2 Hz
Xray_35:   0 Hz
Xray_90:   92 Hz
Xray_145:  36 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.12 uA


SIS particles before:           7.6e8
ESR current at injection:      
ESR particles after decel.:     2.3e6
Target ON density:              5.55e13

copy and repeat the above (below the line) every 30 minutes
  215   Mon Mar 23 01:53:59 2020 ShahabRunsEmpty shots in ESR 
since about 01:40 AM, there is no beam in ESR. .
stopped data acquisition
OPs are working on it. After searching, OPs decided that something is wrong with ESR.
  216   Mon Mar 23 03:04:56 2020 ShahabRunsrun entry - run093 
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.

open file : run093

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 03:04, first file: run093_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 03:04

ON Rates
Si_X:       1 Hz
Si_Y:       1 Hz
Xray_35:    3 Hz
Xray_90:    34 Hz
Xray_145:   18 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.18 uA


SIS particles before:           4.9e8
ESR current at injection:      
ESR particles after decel.:     8.7e6
Target ON density:              5.55e13

copy and repeat the above (below the line) every 30 minutes
  217   Mon Mar 23 03:07:11 2020 ShahabRunsSIS Kicker problem 
After calling ESR on-call duty (M. Steck) he confirmed that the ESR is fine and suspected the SIS kicker modules.

SIS operators then checked and could confirm that module 5 is out of order and module 4 sometimes works sometimes not.

They asked me I said better to run as good as possible with lower number of modules until the end of experiment, then later change the module. because otherwise changing module might take time.

they tried to increase the kick angle to check if they can move the spot to the center.

some shots went well but mostly failed.

they decided to call the Rufbereitschaft.

meanwhile I started the run number 93 to at least collect some data from some of the correct shots.

if counts are too high I will stop it.

let's see.
  218   Mon Mar 23 03:38:01 2020 ShahabRunsrun entry - run093 
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.

open file : run093

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 03:04, first file: run093_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 03:36

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    1 Hz
Xray_90:    45 Hz
Xray_145:   19 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.29 uA


SIS particles before:           5.6e8
ESR current at injection:      
ESR particles after decel.:     8.64e6
Target ON density:              4.35e13

copy and repeat the above (below the line) every 30 minutes
  219   Mon Mar 23 03:53:41 2020 ShahabRunsReduced intensity inspite of faulty kicker 
SIS Kicker is still faulty. but we managed to reduce again the intensity to around 2e6 particles in ring to reduce scattering on scraper.
  221   Mon Mar 23 04:08:12 2020 ShahabRunsrun 93 stopped 
run 93 which was during faulty kicker was stopped so that the kicker module can be repaired.
  222   Mon Mar 23 05:55:24 2020 ShahabRunsKicker problem not solved yet 
no solution to kicker problem. 
  223   Mon Mar 23 05:59:01 2020 ShahabRunsSIS Kicker  
SIS Kicker seems to be working properly. but we have to see how regularly it will work.
  224   Mon Mar 23 06:20:06 2020 ShahabRunsPosition on scintillator corrected sitll no beam in ESR 
position on the scintillator was corrected by the OPs to center, but beam is still not in ESR.
  225   Mon Mar 23 06:40:17 2020 ShahabRunsno beam in SIS nor in ESR 
manic Monday morning.
  226   Mon Mar 23 06:49:46 2020 ShahabRunsESR kicker also has some problems 
  228   Mon Mar 23 08:04:07 2020 Shahab, Laszlo,YuryRunsrun entry - run0942020
open file : run094

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.

at the 3. shoot counting backwards from the end of this file the TARGET LEFT ON for the whole cycle --> got a burst of particles on the detector in 
Target ON Mode as well. --> CUT OUT THIS ONE 1min PHASE!

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 08:15, first file: run094_0001.lmd
run stop  at 08:17, last file:  run_094.lmd

_______________________________________________________________________________

time: 08:10

ON Rates
Si_X:       2 Hz
Si_Y:       2 Hz
Xray_35:    5 Hz
Xray_90:    84 Hz
Xray_145:   18 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.32 uA


SIS particles before:           2.5e8
ESR current at injection:       4.5e7
ESR particles after decel.:     1e7
Target ON density:              3.8e13

copy and repeat the above (below the line) every 30 minutes
  229   Mon Mar 23 08:20:31 2020 Shahab, Laszlo,YuryRunsrun entry - run095 
open file : run095

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 08:17, first file: run095_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 08:10

ON Rates
Si_X:       2 Hz
Si_Y:       2 Hz
Xray_35:    5 Hz
Xray_90:    84 Hz
Xray_145:   18 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.32 uA


SIS particles before:           5.6e8
ESR current at injection:      
ESR particles after decel.:     ~8.64e6
Target ON density:              3.8e13

copy and repeat the above (below the line) every 30 minutes