HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 6 of 29  Not logged in ELOG logo
Entry  Sun Mar 22 18:41:50 2020, Michael, Laszlo, Runs, run entry - run088,  
Closed file run088 at 17:55. No beam in ESR.
Entry  Sun Mar 22 22:00:49 2020, Michael, Laszlo, Yuri, Runs, run entry - run089 - switched to Primary beam,  
Yuri is still tuning, but we are collecting data. Beam is in. Detectors are out.

open file : run089
Entry  Sun Mar 22 22:06:21 2020, Michael, Laszlo, Yuri, Runs, run entry - run089 - stopped,  
closed file again.

Yuri is still tuning, but we are collecting data. Beam is in. Detectors are out.
Entry  Sun Mar 22 22:46:56 2020, Michael, Laszlo, Yuri, Runs, run entry - run090,  
Taking data again with primary beam.

open file : run090
Entry  Sun Mar 22 23:59:12 2020, Shahab, Runs, run entry - run091,  
Taking data again with primary beam.

open file : run090
Entry  Mon Mar 23 00:36:51 2020, Shahab, Runs, run entry - run091,  
Taking data again with primary beam.

open file : run091
Entry  Mon Mar 23 01:18:16 2020, Shahab, Runs, run entry - run092,  
Taking data again with primary beam.

open file : run092
Entry  Mon Mar 23 01:53:59 2020, Shahab, Runs, Empty shots in ESR,  
since about 01:40 AM, there is no beam in ESR. .
stopped data acquisition
OPs are working on it. After searching, OPs decided that something is wrong with ESR.
Entry  Mon Mar 23 03:04:56 2020, Shahab, Runs, run entry - run093,  
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.

open file : run093
Entry  Mon Mar 23 03:07:11 2020, Shahab, Runs, SIS Kicker problem,  IMG_20200323_021051.jpg
After calling ESR on-call duty (M. Steck) he confirmed that the ESR is fine and suspected the SIS kicker modules.

SIS operators then checked and could confirm that module 5 is out of order and module 4 sometimes works sometimes not.
Entry  Mon Mar 23 03:38:01 2020, Shahab, Runs, run entry - run093,  
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.

open file : run093
Entry  Mon Mar 23 03:53:41 2020, Shahab, Runs, Reduced intensity inspite of faulty kicker,  
SIS Kicker is still faulty. but we managed to reduce again the intensity to around 2e6 particles in ring to reduce scattering on scraper.
Entry  Mon Mar 23 04:08:12 2020, Shahab, Runs, run 93 stopped,  
run 93 which was during faulty kicker was stopped so that the kicker module can be repaired.
Entry  Mon Mar 23 05:55:24 2020, Shahab, Runs, Kicker problem not solved yet,  
no solution to kicker problem. 
Entry  Mon Mar 23 05:59:01 2020, Shahab, Runs, SIS Kicker ,  
SIS Kicker seems to be working properly. but we have to see how regularly it will work.
Entry  Mon Mar 23 06:20:06 2020, Shahab, Runs, Position on scintillator corrected sitll no beam in ESR,  IMG_20200323_061337.jpg
position on the scintillator was corrected by the OPs to center, but beam is still not in ESR.
Entry  Mon Mar 23 06:40:17 2020, Shahab, Runs, no beam in SIS nor in ESR,  
manic Monday morning.
Entry  Mon Mar 23 06:49:46 2020, Shahab, Runs, ESR kicker also has some problems,  
 
Entry  Mon Mar 23 08:04:07 2020, Shahab, Laszlo,Yury, Runs, run entry - run094, 2020 2020-03-23_08-13-00-443.png
open file : run094

beam: 124Xe54+
Entry  Mon Mar 23 08:20:31 2020, Shahab, Laszlo,Yury, Runs, run entry - run095,  2020-03-23_08-31-45-715.png
open file : run095

beam: 124Xe54+
ELOG V3.1.5-fc6679b