294
|
Thu Apr 29 20:34:09 2021 |
Jan Glorius | Calibration | run0003 - Xray90 calib Pb210 d=167.5mm | 2021 |
Efficiency calibration in the lab
Detector: GEM1800 - 90 deg
Source: 210Pb
Distance: 167.5mm
Start time: 20:39:54 - 29.04.2021
Stop time: 08:43:58 - 30.04.2021
file name: e127b_run0003.lmd
avrg. rate: 70Hz
dead-time: 1%
Rate spikes every ~2-3 sec. Need to be checked! |
61
|
Tue Mar 17 11:44:58 2020 |
Jan | Runs | run entry - template | |
beam: 118Te52+
energy: 7.4 MeV/u
purpose: data with TARGET ON
Detector position (Si): xxx mm
run start at 14:21 , first file: run0xx_0001.lmd
run stop at 17:11 , last file: run088_0178.lmd
_______________________________________________________________________________
time: 14:45
ON Rates
Si_X: 29 Hz
Si_Y: 31 Hz
Xray_35: 592 Hz
Xray_90: 168 Hz
Xray_145: xx Hz
BaF_OR: xx Hz
Si voltage: x.x V
Si leakage current: x.x uA
SIS particles before: 5e9
ESR particles at injection: 1e6
ESR particles after decel.: 1e5
Target ON density: 5.5e13
copy and repeat the above (below the line) every 30 minutes |
246
|
Mon Mar 23 13:42:18 2020 |
Ragan | Runs | run entry - run104, scrapper is removed | |
open file : run104
Scrapper is removed |
247
|
Mon Mar 23 14:02:07 2020 |
Ragan | Runs | run entry - run104, scrapper is removed | |
beam: 124Xe54+
energy: 10 MeV/u
we run at MAX INTENSITY as we can: SIS was increased to its top, but unfortunately we still end up with 1.5e9 at injection from SIS. Sergey also optimized some stuff.
purpose: data with TARGET ON and SCRAPER OFF --> this leakage current spikes associated with primary scattering from the scraper edge seem to disappear, but we get still 10kHz rate on the detector a few sec after injection(this small "bump"
after the peak in the Si current - see the picture below)
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at , first file: run102_0001.lmd
run stop at , last file: run_0xxx.lmd
_______________________________________________________________________________
time: 14:02
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 00 Hz
Xray_90: 34 Hz
Xray_145: 47 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.34 uA with spikes for 3s long after injection roughly 10uA
SIS particles before: 3.13e9
ESR current at injection: 5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.: 1.71e7? (it is hard to catch exactly)
Target ON density: 3.95e13
copy and repeat the above (below the line) every 30 minutes |
245
|
Mon Mar 23 13:40:16 2020 |
Ragan | Runs | run entry - run103, scrapper moved by accident | |
open file : run103
Scrapper was put back and than taken out again by miscommunication. run103 is made while using the scraper |
248
|
Mon Mar 23 14:12:18 2020 |
E127 team | Runs | run entry - run103, scrapper is inserted | |
open file : run103
Scrapper is inserted |
240
|
Mon Mar 23 11:35:52 2020 |
Laszlo,Sergey | Runs | run entry - run102 | |
open file : run102
beam: 124Xe54+
energy: 10 MeV/u
we run at MAX INTENSITY as we can: SIS was increased to its top, but unfortunately we still end up with 1.5e9 at injection from SIS. Sergey also optimized some stuff.
purpose: data with TARGET ON and SCRAPER OFF
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 10:12, first file: run101_0001.lmd
run stop at , last file: run_0xxx.lmd
_______________________________________________________________________________
time: 11:08
ON Rates
Si_X: 1 Hz
Si_Y: 1 Hz
Xray_35: 2 Hz
Xray_90: 62 Hz
Xray_145: 26 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.29 uA with spikes for 3s long after injection roughly 10uA
SIS particles before: 2.7e8
ESR current at injection: 5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.: 7e6? (it is hard to catch exactly)
Target ON density: 4.2e13
copy and repeat the above (below the line) every 30 minutes |
242
|
Mon Mar 23 12:54:02 2020 |
Pierre-Michel, Laszlo | Runs | run entry - run102 | |
open file : run102
beam: 124Xe54+
energy: 10 MeV/u
we run at MAX INTENSITY as we can: SIS was increased to its top, but unfortunately we still end up with 1.5e9 at injection from SIS. Sergey also optimized some stuff.
purpose: data with TARGET ON and SCRAPER OFF --> this leakage current spikes associated with primary scattering from the scraper edge seem to disappear, but we get still 10kHz rate on the detector a few sec after injection(this small "bump"
after the peak in the Si current - see the picture below)
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 12:49, first file: run102_0001.lmd
run stop at , last file: run_0xxx.lmd
_______________________________________________________________________________
time: 12:55
ON Rates
Si_X: 1 Hz
Si_Y: 1 Hz
Xray_35: 2 Hz
Xray_90: 70 Hz
Xray_145: 50 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.31 uA with spikes for 3s long after injection roughly 10uA
SIS particles before: 2.7e9
ESR current at injection: 5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.: 1.5e6? (it is hard to catch exactly)
Target ON density: 4.6e13
copy and repeat the above (below the line) every 30 minutes |
243
|
Mon Mar 23 13:23:59 2020 |
Ragan, RuiJiu, Pierre-Michel | Runs | run entry - run102 | |
open file : run102
beam: 124Xe54+
energy: 10 MeV/u
we run at MAX INTENSITY as we can: SIS was increased to its top, but unfortunately we still end up with 1.5e9 at injection from SIS. Sergey also optimized some stuff.
purpose: data with TARGET ON and SCRAPER OFF --> this leakage current spikes associated with primary scattering from the scraper edge seem to disappear, but we get still 10kHz rate on the detector a few sec after injection(this small "bump"
after the peak in the Si current - see the picture below)
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 12:49, first file: run102_0001.lmd
run stop at ,13:38 last file: run_0xxx.lmd
_______________________________________________________________________________
time: 13:24
ON Rates
Si_X: 1 Hz
Si_Y: 1 Hz
Xray_35: 10 Hz
Xray_90: 34 Hz
Xray_145: 22 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.32 uA with spikes for 3s long after injection roughly 10uA
SIS particles before: 2e9
ESR current at injection: 5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.: 1.44e7? (it is hard to catch exactly)
Target ON density: 4.07e13
copy and repeat the above (below the line) every 30 minutes |
238
|
Mon Mar 23 11:17:42 2020 |
Laszlo,Sergey | Runs | run entry - run101 | |
open file : run101
beam: 124Xe54+
energy: 10 MeV/u
we run at MAX INTENSITY as we can: SIS was increased to its top, but unfortunately we still end up with 1.5e9 at injection from SIS. Sergey also optimized some stuff.
purpose: data with TARGET ON and SCRAPER OFF --> this leakage current spikes associated with primary scattering from the scraper edge seem to disappear, but we get still 10kHz rate on the detector a few sec after injection(this small "bump"
after the peak in the Si current - see the picture below)
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 10:12, first file: run101_0001.lmd
run stop at , last file: run_0xxx.lmd
_______________________________________________________________________________
time: 11:08
ON Rates
Si_X: 1 Hz
Si_Y: 1 Hz
Xray_35: 2 Hz
Xray_90: 62 Hz
Xray_145: 26 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.29 uA with spikes for 3s long after injection roughly 10uA
SIS particles before: 2.7e8
ESR current at injection: 5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.: 7e6? (it is hard to catch exactly)
Target ON density: 4.2e13
copy and repeat the above (below the line) every 30 minutes |
Attachment 1: 2020-03-23_11-19-53-652.png
|
|
Attachment 2: injection_current_spike_withoutScraper.png
|
|
237
|
Mon Mar 23 11:00:29 2020 |
Laszlo,Sergey | Runs | run entry - run100 - SCRAPER removed! | |
open file : run100
beam: 124Xe54+
energy: 10 MeV/u
SIS intensity increased factor 2: 1.25e9, also Sergey tried to optimize these phase shift losses.
purpose: data with TARGET ON and SCRAPER OFF .--> papa Rutherford should come now
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 10:12, first file: run100_0001.lmd
run stop at , last file: run_0xxx.lmd
_______________________________________________________________________________
time: 11:01
ON Rates
Si_X: 2 Hz
Si_Y: 2 Hz
Xray_35: 1 Hz
Xray_90: 70 Hz
Xray_145: 22 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.2 uA with spikes for 3s long after injection roughly 10uA
SIS particles before: 2.7e8
ESR current at injection: 5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.: 1e7 (it is hard to catch exactly)
Target ON density: 4.6e13
copy and repeat the above (below the line) every 30 minutes |
236
|
Mon Mar 23 10:26:36 2020 |
Laszlo,Yury | Runs | run entry - run099 | |
open file : run099
beam: 124Xe54+
energy: 10 MeV/u
SIS intensity increased factor 2: 1.25e9, also Sergey tried to optimize these phase shift losses.
purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 10:12, first file: run099_0001.lmd
run stop at , last file: run_0xxx.lmd
_______________________________________________________________________________
time: 10:25:59
ON Rates
Si_X: 2 Hz
Si_Y: 2 Hz
Xray_35: 1 Hz
Xray_90: 70 Hz
Xray_145: 22 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.17 uA with spikes for 3s long after injection roughly 10uA
SIS particles before: 2.7e8
ESR current at injection: 5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.: 1e7 (it is hard to catch exactly)
Target ON density: 5.4e13
copy and repeat the above (below the line) every 30 minutes |
Attachment 1: 2020-03-23_10-39-59-234.png
|
|
Attachment 2: injection_current_spike.png
|
|
235
|
Mon Mar 23 10:08:12 2020 |
Laszlo,Yury | Runs | run entry - run098 | |
open file : run098
beam: 124Xe54+
energy: 10 MeV/u
SIS is back in business again!
purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 10:12, first file: run098_0001.lmd
run stop at , last file: run_0xxx.lmd
_______________________________________________________________________________
time: 08:10
ON Rates
Si_X: 2 Hz
Si_Y: 2 Hz
Xray_35: 2 Hz
Xray_90: 57 Hz
Xray_145: 22 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.17 uA
SIS particles before: 2.7e8
ESR current at injection: 5.3e7
ESR particles after decel.: 8e6 (it is hard to catch exactly)
Target ON density: 3.5e13
copy and repeat the above (below the line) every 30 minutes |
234
|
Mon Mar 23 10:06:12 2020 |
Laszlo | Runs | run entry - run097 | |
this one is garbage |
231
|
Mon Mar 23 09:22:12 2020 |
Laszlo,Yury | Runs | run entry - run096 | |
open file : run096
beam: 124Xe54+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 09:20, first file: run096_0001.lmd
run stop at 09:32, last file: run_0xxx.lmd
_______________________________________________________________________________
time: 08:10
ON Rates
Si_X: 5 Hz
Si_Y: 5 Hz
Xray_35: 2 Hz
Xray_90: 63 Hz
Xray_145: 21 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.23 uA
SIS particles before: 2.7e8
ESR current at injection: 5.3e7
ESR particles after decel.: 1e7 (it is hard to catch exactly)
Target ON density: 4.1e13
copy and repeat the above (below the line) every 30 minutes |
229
|
Mon Mar 23 08:20:31 2020 |
Shahab, Laszlo,Yury | Runs | run entry - run095 | |
open file : run095
beam: 124Xe54+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 08:17, first file: run095_0001.lmd
run stop at , last file: run_0xxx.lmd
_______________________________________________________________________________
time: 08:10
ON Rates
Si_X: 2 Hz
Si_Y: 2 Hz
Xray_35: 5 Hz
Xray_90: 84 Hz
Xray_145: 18 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.32 uA
SIS particles before: 5.6e8
ESR current at injection:
ESR particles after decel.: ~8.64e6
Target ON density: 3.8e13
copy and repeat the above (below the line) every 30 minutes |
Attachment 1: 2020-03-23_08-31-45-715.png
|
|
230
|
Mon Mar 23 08:51:01 2020 |
Laszlo,Yury | Runs | run entry - run095 | |
open file : run095
beam: 124Xe54+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 08:17, first file: run095_0001.lmd
run stop at , last file: run_0xxx.lmd
_______________________________________________________________________________
time: 08:10
ON Rates
Si_X: 4 Hz
Si_Y: 4 Hz
Xray_35: 6 Hz
Xray_90: 60 Hz
Xray_145: 22 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.30 uA
SIS particles before: 2.5e8
ESR current at injection: 5.7e7
ESR particles after decel.: 1e7 (it is hard to catch exactly)
Target ON density: 4.3e13
copy and repeat the above (below the line) every 30 minutes |
228
|
Mon Mar 23 08:04:07 2020 |
Shahab, Laszlo,Yury | Runs | run entry - run094 | 2020 |
open file : run094
beam: 124Xe54+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.
at the 3. shoot counting backwards from the end of this file the TARGET LEFT ON for the whole cycle --> got a burst of particles on the detector in
Target ON Mode as well. --> CUT OUT THIS ONE 1min PHASE!
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 08:15, first file: run094_0001.lmd
run stop at 08:17, last file: run_094.lmd
_______________________________________________________________________________
time: 08:10
ON Rates
Si_X: 2 Hz
Si_Y: 2 Hz
Xray_35: 5 Hz
Xray_90: 84 Hz
Xray_145: 18 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.32 uA
SIS particles before: 2.5e8
ESR current at injection: 4.5e7
ESR particles after decel.: 1e7
Target ON density: 3.8e13
copy and repeat the above (below the line) every 30 minutes |
Attachment 1: 2020-03-23_08-13-00-443.png
|
|
216
|
Mon Mar 23 03:04:56 2020 |
Shahab | Runs | run entry - run093 | |
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.
open file : run093
beam: 124Xe54+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 03:04, first file: run093_0001.lmd
run stop at 00:59:55, last file: run_0xxx.lmd
_______________________________________________________________________________
time: 03:04
ON Rates
Si_X: 1 Hz
Si_Y: 1 Hz
Xray_35: 3 Hz
Xray_90: 34 Hz
Xray_145: 18 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.18 uA
SIS particles before: 4.9e8
ESR current at injection:
ESR particles after decel.: 8.7e6
Target ON density: 5.55e13
copy and repeat the above (below the line) every 30 minutes |
218
|
Mon Mar 23 03:38:01 2020 |
Shahab | Runs | run entry - run093 | |
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.
open file : run093
beam: 124Xe54+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 03:04, first file: run093_0001.lmd
run stop at 00:59:55, last file: run_0xxx.lmd
_______________________________________________________________________________
time: 03:36
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 1 Hz
Xray_90: 45 Hz
Xray_145: 19 Hz
BaF_OR: ---
Si voltage: 60.02 V
Si leakage current: 4.29 uA
SIS particles before: 5.6e8
ESR current at injection:
ESR particles after decel.: 8.64e6
Target ON density: 4.35e13
copy and repeat the above (below the line) every 30 minutes |