ID Date Author Category Subjectdown Year
  294   Thu Apr 29 20:34:09 2021 Jan GloriusCalibrationrun0003 - Xray90 calib Pb210 d=167.5mm2021
Efficiency calibration in the lab

Detector: GEM1800 - 90 deg
Source: 210Pb
Distance: 167.5mm
Start time: 20:39:54 - 29.04.2021
Stop time:  08:43:58 - 30.04.2021

file name: e127b_run0003.lmd
avrg. rate: 70Hz
dead-time:  1%

Rate spikes every ~2-3 sec. Need to be checked!
  61   Tue Mar 17 11:44:58 2020 JanRunsrun entry - template  
beam: 118Te52+
energy: 7.4 MeV/u

purpose: data with TARGET ON

Detector position (Si): xxx mm

run start at 14:21 , first file: run0xx_0001.lmd
run stop  at 17:11 , last file:  run088_0178.lmd

_______________________________________________________________________________

time: 14:45

ON Rates
Si_X:       29 Hz
Si_Y:       31 Hz
Xray_35:   592 Hz
Xray_90:   168 Hz
Xray_145:   xx Hz
BaF_OR:    xx Hz

Si voltage:          x.x V  
Si leakage current:  x.x uA


SIS particles before:           5e9
ESR particles at injection:     1e6
ESR particles after decel.:     1e5
Target ON density:              5.5e13


copy and repeat the above (below the line) every 30 minutes
  246   Mon Mar 23 13:42:18 2020 RaganRunsrun entry - run104, scrapper is removed 
open file : run104
Scrapper is removed
  247   Mon Mar 23 14:02:07 2020 RaganRunsrun entry - run104, scrapper is removed 

beam: 124Xe54+
energy: 10 MeV/u

we run at MAX INTENSITY as we can: SIS was increased to its top, but unfortunately we still end up with 1.5e9 at injection from SIS. Sergey also optimized some stuff.

purpose: data with TARGET ON and SCRAPER OFF --> this leakage current spikes associated with primary scattering from the scraper edge seem to disappear, but we get still 10kHz rate on the detector a few sec after injection(this small "bump" 
after the peak in the Si current - see the picture below)

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at , first file: run102_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 14:02

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    00 Hz
Xray_90:    34 Hz
Xray_145:   47 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.34 uA with spikes for 3s long after injection roughly 10uA


SIS particles before:           3.13e9
ESR current at injection:       5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.:     1.71e7? (it is hard to catch exactly)
Target ON density:              3.95e13

copy and repeat the above (below the line) every 30 minutes
  245   Mon Mar 23 13:40:16 2020 RaganRunsrun entry - run103, scrapper moved by accident 
open file : run103
Scrapper was put back and than taken out again by miscommunication. run103 is made while using the scraper
  248   Mon Mar 23 14:12:18 2020 E127 teamRunsrun entry - run103, scrapper is inserted 
open file : run103
Scrapper is inserted
  240   Mon Mar 23 11:35:52 2020 Laszlo,SergeyRunsrun entry - run102 
open file : run102

beam: 124Xe54+
energy: 10 MeV/u

we run at MAX INTENSITY as we can: SIS was increased to its top, but unfortunately we still end up with 1.5e9 at injection from SIS. Sergey also optimized some stuff.

purpose: data with TARGET ON and SCRAPER OFF 

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 10:12, first file: run101_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 11:08

ON Rates
Si_X:       1 Hz
Si_Y:       1 Hz
Xray_35:    2 Hz
Xray_90:    62 Hz
Xray_145:   26 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.29 uA with spikes for 3s long after injection roughly 10uA


SIS particles before:           2.7e8
ESR current at injection:       5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.:     7e6? (it is hard to catch exactly)
Target ON density:              4.2e13

copy and repeat the above (below the line) every 30 minutes
  242   Mon Mar 23 12:54:02 2020 Pierre-Michel, LaszloRunsrun entry - run102 
open file : run102

beam: 124Xe54+
energy: 10 MeV/u

we run at MAX INTENSITY as we can: SIS was increased to its top, but unfortunately we still end up with 1.5e9 at injection from SIS. Sergey also optimized some stuff.

purpose: data with TARGET ON and SCRAPER OFF --> this leakage current spikes associated with primary scattering from the scraper edge seem to disappear, but we get still 10kHz rate on the detector a few sec after injection(this small "bump" 
after the peak in the Si current - see the picture below)

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 12:49, first file: run102_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 12:55

ON Rates
Si_X:       1 Hz
Si_Y:       1 Hz
Xray_35:    2 Hz
Xray_90:    70 Hz
Xray_145:   50 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.31 uA with spikes for 3s long after injection roughly 10uA


SIS particles before:           2.7e9
ESR current at injection:       5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.:     1.5e6? (it is hard to catch exactly)
Target ON density:              4.6e13

copy and repeat the above (below the line) every 30 minutes
  243   Mon Mar 23 13:23:59 2020 Ragan, RuiJiu, Pierre-MichelRunsrun entry - run102 
open file : run102

beam: 124Xe54+
energy: 10 MeV/u

we run at MAX INTENSITY as we can: SIS was increased to its top, but unfortunately we still end up with 1.5e9 at injection from SIS. Sergey also optimized some stuff.

purpose: data with TARGET ON and SCRAPER OFF --> this leakage current spikes associated with primary scattering from the scraper edge seem to disappear, but we get still 10kHz rate on the detector a few sec after injection(this small "bump" 
after the peak in the Si current - see the picture below)

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 12:49, first file: run102_0001.lmd
run stop  at ,13:38 last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 13:24

ON Rates
Si_X:       1 Hz
Si_Y:       1 Hz
Xray_35:    10 Hz
Xray_90:    34 Hz
Xray_145:   22 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.32 uA with spikes for 3s long after injection roughly 10uA


SIS particles before:           2e9
ESR current at injection:       5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.:     1.44e7? (it is hard to catch exactly)
Target ON density:              4.07e13

copy and repeat the above (below the line) every 30 minutes
  238   Mon Mar 23 11:17:42 2020 Laszlo,SergeyRunsrun entry - run101 
open file : run101

beam: 124Xe54+
energy: 10 MeV/u

we run at MAX INTENSITY as we can: SIS was increased to its top, but unfortunately we still end up with 1.5e9 at injection from SIS. Sergey also optimized some stuff.

purpose: data with TARGET ON and SCRAPER OFF --> this leakage current spikes associated with primary scattering from the scraper edge seem to disappear, but we get still 10kHz rate on the detector a few sec after injection(this small "bump" 
after the peak in the Si current - see the picture below)

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 10:12, first file: run101_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 11:08

ON Rates
Si_X:       1 Hz
Si_Y:       1 Hz
Xray_35:    2 Hz
Xray_90:    62 Hz
Xray_145:   26 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.29 uA with spikes for 3s long after injection roughly 10uA


SIS particles before:           2.7e8
ESR current at injection:       5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.:     7e6? (it is hard to catch exactly)
Target ON density:              4.2e13

copy and repeat the above (below the line) every 30 minutes
Attachment 1: 2020-03-23_11-19-53-652.png
2020-03-23_11-19-53-652.png
Attachment 2: injection_current_spike_withoutScraper.png
injection_current_spike_withoutScraper.png
  237   Mon Mar 23 11:00:29 2020 Laszlo,SergeyRunsrun entry - run100 - SCRAPER removed! 
open file : run100

beam: 124Xe54+
energy: 10 MeV/u

SIS intensity increased factor 2: 1.25e9, also Sergey tried to optimize these phase shift losses. 

purpose: data with TARGET ON and SCRAPER OFF .--> papa Rutherford should come now

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 10:12, first file: run100_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 11:01

ON Rates
Si_X:       2 Hz
Si_Y:       2 Hz
Xray_35:    1 Hz
Xray_90:    70 Hz
Xray_145:   22 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.2 uA with spikes for 3s long after injection roughly 10uA


SIS particles before:           2.7e8
ESR current at injection:       5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.:     1e7 (it is hard to catch exactly)
Target ON density:              4.6e13

copy and repeat the above (below the line) every 30 minutes
  236   Mon Mar 23 10:26:36 2020 Laszlo,YuryRunsrun entry - run099 
open file : run099

beam: 124Xe54+
energy: 10 MeV/u

SIS intensity increased factor 2: 1.25e9, also Sergey tried to optimize these phase shift losses. 

purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 10:12, first file: run099_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 10:25:59

ON Rates
Si_X:       2 Hz
Si_Y:       2 Hz
Xray_35:    1 Hz
Xray_90:    70 Hz
Xray_145:   22 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.17 uA with spikes for 3s long after injection roughly 10uA


SIS particles before:           2.7e8
ESR current at injection:       5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.:     1e7 (it is hard to catch exactly)
Target ON density:              5.4e13

copy and repeat the above (below the line) every 30 minutes
Attachment 1: 2020-03-23_10-39-59-234.png
2020-03-23_10-39-59-234.png
Attachment 2: injection_current_spike.png
injection_current_spike.png
  235   Mon Mar 23 10:08:12 2020 Laszlo,YuryRunsrun entry - run098 
open file : run098

beam: 124Xe54+
energy: 10 MeV/u

SIS is back in business again!

purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 10:12, first file: run098_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 08:10

ON Rates
Si_X:       2 Hz
Si_Y:       2 Hz
Xray_35:    2 Hz
Xray_90:    57 Hz
Xray_145:   22 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.17 uA


SIS particles before:           2.7e8
ESR current at injection:       5.3e7
ESR particles after decel.:     8e6 (it is hard to catch exactly)
Target ON density:              3.5e13

copy and repeat the above (below the line) every 30 minutes
  234   Mon Mar 23 10:06:12 2020 LaszloRunsrun entry - run097 
this one is garbage
  231   Mon Mar 23 09:22:12 2020 Laszlo,YuryRunsrun entry - run096 
open file : run096

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 09:20, first file: run096_0001.lmd
run stop  at 09:32, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 08:10

ON Rates
Si_X:       5 Hz
Si_Y:       5 Hz
Xray_35:    2 Hz
Xray_90:    63 Hz
Xray_145:   21 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.23 uA


SIS particles before:           2.7e8
ESR current at injection:       5.3e7
ESR particles after decel.:     1e7 (it is hard to catch exactly)
Target ON density:              4.1e13

copy and repeat the above (below the line) every 30 minutes
  229   Mon Mar 23 08:20:31 2020 Shahab, Laszlo,YuryRunsrun entry - run095 
open file : run095

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 08:17, first file: run095_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 08:10

ON Rates
Si_X:       2 Hz
Si_Y:       2 Hz
Xray_35:    5 Hz
Xray_90:    84 Hz
Xray_145:   18 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.32 uA


SIS particles before:           5.6e8
ESR current at injection:      
ESR particles after decel.:     ~8.64e6
Target ON density:              3.8e13

copy and repeat the above (below the line) every 30 minutes
Attachment 1: 2020-03-23_08-31-45-715.png
2020-03-23_08-31-45-715.png
  230   Mon Mar 23 08:51:01 2020 Laszlo,YuryRunsrun entry - run095 
open file : run095

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 08:17, first file: run095_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 08:10

ON Rates
Si_X:       4 Hz
Si_Y:       4 Hz
Xray_35:    6 Hz
Xray_90:    60 Hz
Xray_145:   22 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.30 uA


SIS particles before:           2.5e8
ESR current at injection:       5.7e7
ESR particles after decel.:     1e7 (it is hard to catch exactly)
Target ON density:              4.3e13

copy and repeat the above (below the line) every 30 minutes
  228   Mon Mar 23 08:04:07 2020 Shahab, Laszlo,YuryRunsrun entry - run0942020
open file : run094

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.

at the 3. shoot counting backwards from the end of this file the TARGET LEFT ON for the whole cycle --> got a burst of particles on the detector in 
Target ON Mode as well. --> CUT OUT THIS ONE 1min PHASE!

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 08:15, first file: run094_0001.lmd
run stop  at 08:17, last file:  run_094.lmd

_______________________________________________________________________________

time: 08:10

ON Rates
Si_X:       2 Hz
Si_Y:       2 Hz
Xray_35:    5 Hz
Xray_90:    84 Hz
Xray_145:   18 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.32 uA


SIS particles before:           2.5e8
ESR current at injection:       4.5e7
ESR particles after decel.:     1e7
Target ON density:              3.8e13

copy and repeat the above (below the line) every 30 minutes
Attachment 1: 2020-03-23_08-13-00-443.png
2020-03-23_08-13-00-443.png
  216   Mon Mar 23 03:04:56 2020 ShahabRunsrun entry - run093 
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.

open file : run093

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 03:04, first file: run093_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 03:04

ON Rates
Si_X:       1 Hz
Si_Y:       1 Hz
Xray_35:    3 Hz
Xray_90:    34 Hz
Xray_145:   18 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.18 uA


SIS particles before:           4.9e8
ESR current at injection:      
ESR particles after decel.:     8.7e6
Target ON density:              5.55e13

copy and repeat the above (below the line) every 30 minutes
  218   Mon Mar 23 03:38:01 2020 ShahabRunsrun entry - run093 
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.

open file : run093

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 03:04, first file: run093_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 03:36

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    1 Hz
Xray_90:    45 Hz
Xray_145:   19 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.29 uA


SIS particles before:           5.6e8
ESR current at injection:      
ESR particles after decel.:     8.64e6
Target ON density:              4.35e13

copy and repeat the above (below the line) every 30 minutes