HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te, Page 7 of 29  Not logged in ELOG logo
Entry  Wed May 26 03:32:17 2021, Michele, Cobus, Runs, Run 0124, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Wed May 26 02:30:58 2021, Michele, Cobus, Runs, Run 0123, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Wed May 26 01:29:00 2021, Michele, Cobus, Runs, Run 0122, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Wed May 26 00:29:07 2021, Michele, Cobus, Runs, Run 0121, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Tue May 25 23:27:30 2021, Beatriz, Cobus, Runs, Run 0120, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Tue May 25 22:14:52 2021, Robert, Shahab, Runs, Run 0119, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Tue May 25 22:03:22 2021, Robert/Shahab, Runs, Lifetime measurement, 2021 
Run 0118

Gas jet target has been turned off for lifetime measurement.
Entry  Tue May 25 20:46:29 2021, Robert, Shahab, Runs, Run 0118, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Tue May 25 18:46:04 2021, Robert/Shahab, Accelerator, Quadrupoles down, 2021 
All quadrupoles went off, waiting for the on-call service
Entry  Tue May 25 17:12:59 2021, Robert/Shahab, Accelerator, Beam, 2021 
Beam is back; It is now being optimized
Entry  Tue May 25 15:56:48 2021, Robert/Shahab, Accelerator, Trafo, 2021 
Trafo was set to 0
Entry  Tue May 25 13:49:51 2021, Oliver, Diego, Jan, General, No Beam, 2021 
No beam from 13:49:00 until 
Entry  Tue May 25 12:36:10 2021, Oliver, Diego, Runs, Run 0117, 2021 
No. of stacks: 30 (before 20)
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Tue May 25 11:58:30 2021, Jan, Analysis, 118(p,g) counts until run0115, 2021 run91to115_Si_map.pngrun91to115_Si_projection.png
The two attached plots show the collected Si data up to run0115.

Within this ~15h we have about ~70 counts in the peak region.
Entry  Tue May 25 11:36:00 2021, Oliver, Diego, Runs, Run 0116 - after ESR optimization, 2021 
No. of stacks: 30 (before 20)
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Tue May 25 10:22:23 2021, Oliver, Diego, Runs, Run 0115 - after ESR optimization, 2021 
DAQ node2 was on pause!

No. of stacks: 30 (before 20)
Entry  Tue May 25 09:53:04 2021, Oliver, Diego, Runs, (No)Run 0114, 2021 
Run0114 was started after ESR optimization but immedieatly again stopped...

at 09:52:34 on 25.05.2021
Entry  Tue May 25 09:11:13 2021, Oliver, Diego, Runs, Run 0113 - stopped for ESR optimizations, 2021 
DAQ node2 was on pause!

No. of stacks: 30 (before 20)
Entry  Tue May 25 08:51:50 2021, Oliver, Diego, Runs, Run 0112 - stopped for filling detectors, 2021 
No. of stacks: 30 (before 20)
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Tue May 25 08:36:15 2021, Jan, General, lessons learned, 2021 
1. before using stoch. cooling in ESR, boot and update the windows PC
2. better diagnostics for low energy/intensity beam-target overlapp in ESR is needed (either a clever analysis or a new detector)
more to come
ELOG V3.1.5-fc6679b