HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 27 of 29  Not logged in ELOG logo
Entry  Sun Mar 15 17:13:21 2020, Laszlo, Jan, Calibration, the x-ray gate issue,  IMG_20200315_172129.jpg
We found a strange behaviour of our ADC gates for the x-ray detectors.
The setting as shown in the foto below corresponds to a delay of 5 us and a gate length of 15 us.
This is the only setting that produces nice spectra, even though the signals and gate are not aligned.
Entry  Sun Mar 15 17:12:40 2020, Laszlo, Jan, Detectors, new Ortec spec amps ,  
We are now using new SpecAmps for the x-ray detectors from ORTEC, they deliver much improved resolution but have other strange effects as discribed in the
next entry.
Entry  Sun Mar 15 15:08:44 2020, Jan, Calibration, run035 - Xray145 calib B133 high rate,  
measurement with old tennelec specAmps, do not use for efficiency!

Detector: 145
Entry  Sun Mar 15 14:41:34 2020, Jan, Calibration, run034 - Xray145 calib B133 high rate -SOURCE MOVED!,  
measurement with old tennelec specAmps, do not use for efficiency!

The source moved during the calibration, measurement stopped at half time.
Entry  Sun Mar 15 13:52:05 2020, Jan, Calibration, run033 - Xray145 calib Am241,  
measurement with old tennelec specAmps, do not use for efficiency!

Detector: 145
Entry  Sun Mar 15 13:40:11 2020, Jan, Calibration, run032 - Xray90 calib Ba133,  
measurement with old tennelec specAmps, do not use for efficiency!

Detector: 90
Entry  Sun Mar 15 13:08:38 2020, Jan, Calibration, run031 - Xray90 calib Ba133 hi-rate,  
measurement with old tennelec specAmps, do not use for efficiency!

Detector: 90
Entry  Sun Mar 15 09:42:40 2020, Jan, Calibration, run030 - Xray90 calib Am241,  
measurement with old tennelec specAmps, do not use for efficiency!

Detector: 90
Entry  Wed Mar 11 14:33:44 2020, Laszlo, General, beam time manual,  E127_experimental_manual.pdfmanual.odt
Here you can find the digital version of the E127 beam time manual.
Entry  Wed Mar 11 09:08:21 2020, Jan, DAQ, DAQ & controls - OVERVIEW,  
For all DAQ & slow control buissines the user 
[COLOR=red][SIZE=3]litv-exp[/SIZE][/COLOR]
is used with the password [SIZE=1]ViValasVegas1964[/SIZE]
Entry  Tue Mar 10 09:41:26 2020, Jan, Detectors, x-ray background from BaF,  
The BaF2 detectors planned to be installed at the target induce an additional background in the x-ray detectors sitting below inside the target chamber.

We made test measurements with an x-ray detector for estimating the background in the region of interest for our K-REC measurements (35 to 50 keV).
Entry  Tue Mar 10 08:52:34 2020, Jan, Detectors, DSSSD positioning,  optimum_detector_position_2.jpg
To find a good Si position, we need to follow a procedure similar to this:

1. Si in max-in position
Entry  Fri Feb 21 11:29:59 2020, Jan, Detectors, det. distances at target chamber,  Photonen_Kammer.png
This is the lookup table for the distance of each x-ray detector to the target.
See attched foto for explanation.
Entry  Fri Feb 21 11:29:02 2020, Laszlo, General, Shift plan,  
https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0
Entry  Fri Feb 21 09:39:40 2020, Laszlo, DAQ, cable documentation,  cable_documentation_e127.pdfcable_documentation_e127.ods
 
Entry  Mon Feb 17 08:14:44 2020, Jan, Simulations, 118Te K-REC X-ray energies,  Photonen_Kammer.pngx-ray_calculator.txt
X-ray energies of K-REC for 118Te according to 
[URL=http://www-ap.gsi.de/Thomas/ap_html_research/energy/index.php]http://www-ap.gsi.de/Thomas/ap_html_research/energy/index.php[/URL]
Entry  Tue Feb 11 13:20:01 2020, Jan, Detectors, BaF2 - HV settings,  BaF2_HV_settings.pngbaf_bg_ch1.png
with these HV values the 6 channels are roughly gain matched, such that the 7.83 MeV Po-decay is around channel 5000.
Entry  Thu Jan 23 16:35:47 2020, Laszlo, DAQ, cable documentation,  cable_documentation_e127.pdfcable_documentation_e127.ods
 
Entry  Thu Dec 5 10:57:57 2019, Jan, Laszlo, Detectors, setting up the DSSD with beam,  
This is a brief how-to about getting the DSSSD set up with stored beam and target in the ESR.

The main goals
Entry  Fri Nov 15 10:46:12 2019, Laszlo, Detectors, Detector movement from HKR,  IMG_20191114_135600.jpg
To move the detector remotely from the HKR:
-go to a desktop of a HKR computer
-right click: "App Launcher PRO"
ELOG V3.1.5-fc6679b