Wed Nov 6 14:13:53 2019, Jan, Laszlo, Detectors, DSSSD - 1st movement - realignment,
|
We moved the new detector installation for the first time slowly into the dipole chamber.
The alignement seems to be pefect, no distortion or vertical movement of the detector-arm was observed from the window flange.
|
Fri Oct 25 16:34:51 2019, Jan, Runs, prerun007 - MixedAlpha,
|
save point: lxg1275:/datalocal1/e127/predata/prerun007
start: Fr 25.10.19 - 16:35
|
Fri Jun 7 15:57:41 2019, Jan, DAQ, DAQ with & without MDPP-16,
|
The DAQ located in
../esrdaq_2018/r4l-58/
|
Wed Oct 23 15:35:29 2019, Jan, DAQ, DAQ with & without MDPP-16,
|
the DAQ located in
../esrdaq_2018/r4l-58_dev/
|
Wed Oct 23 14:51:43 2019, Jan, Laszlo, DAQ, VME modules & main.cfg,
|
Here is the current list of VME modules in our DRASI daq including HW addresses:
Slot <module> [HW addr.]
|
Wed Oct 23 11:40:29 2019, Jan, Runs, prerun005 - MixedAlpha,
|
save point: lxg1275:/datalocal1/e127/predata/prerun005
start: 23.10.19 - 11:40
|
Wed Sep 25 13:58:24 2019, Laszlo, General, Gamow window energies for 118Te(p,g),
|
# Z A Iso Re Rc T9 upper width mxpos shift
52 118 te118 pg 20 0.5 1.39 0.58 1.06 -0.01
52 118 te118 pg 20 1.0 2.27 1.04 1.69 -0.01
|
Wed Sep 25 13:03:46 2019, Laszlo, Analysis, simulations on 118Te+p, 11x
|
I have made some simulations at 8AMeV, 7AMeV and 4AMeV energies for the main 118Te + p reaction channels. For the
Rutherford simulations credits to Yuanming! For each energy there are 3 simulations: without the scraper, with the
scraper (online), scraper (online) + E-truncation (offline). The scraper is treated as an "ideal scraper" meaning
|
Thu Aug 29 10:02:22 2019, Jan, Detectors, bakeout at ESR setup,
|
The bakeout for our detector setup has started on the evening of 27.08.2019
We have a temperature sensor in the vacuum next to the detector.
The goal is to maximize bakeout temperature, while not going above 125°C at the detector/sensor.
|
Fri Aug 9 13:43:15 2019, Laszlo, Simulations, pn channel simulations for 111Sn(p,g)112Sb experiment, 12x
|
The p,n channel opening for 111Sn beam is at 5.8895 MeV/u beam energy. Therefore, when choosing 6MeV/u, 7MeV/u,
8MeV/u beam energies, there is not much kinetic energy left for the excitation of the 111Sb nucleus --> there
can be "less" nuclear levels populated above groundstate of 111Sb. These "less" states can be handled explicitly
|
Fri Aug 9 13:14:09 2019, Laszlo, , pn channel simulations for 111Sn(p,g)112Sb experiment,
|
The p,n channel opening for the 111Sn+p reaction is at 5.8895 MeV/u beam energy. Therefore, when choosing as 6MeV/u, 7MeV/u, 8MeV/u beam energies, there
is not much kinetic energy left for the outgoing neutron --> there are "less" nuclear levels populated above groundstate in 111Sb, they can be handled
explicitly. My simulations are based on TALYS results. The following steps did I made:
|
Tue Jul 23 10:46:29 2019, Laszlo, Analysis, 124Xe pg peak fit using mixed cascade simulation, 7x
|
This entry is the continuation of the cascade effects on the pg peak shape entry:
https://exp-astro.physik.uni-frankfurt.de:8080/E108/475
|
Tue Jul 9 15:26:59 2019, Yuanming Xing, Simulations, Simulated Rutherford scattering distribution on detector,
|
Simulated Rutherford scattering distribution on detector
Beam: 111Sn
|
Mon Jul 8 14:57:07 2019, Yuanming Xing, Detectors, The measurement of the tilting angle,
|
As shown in the figure, the detector is tilted by a certain angle which is about 45 degree.
The tilted angle is defined as angle B.
We measured angle A using the vertical laser line (red) and papers with a straight line edge. So we can marked
|
Fri Jun 28 14:06:28 2019, Jan, General, CAD of (p,g) setup,
|
|
Tue Jun 25 21:19:50 2019, Laszlo, Simulations, MOCADI input parameters,
|
initial BEAM input parameters for MOCADI are based on:
- https://web-docs.gsi.de/~weick/mocadi/download/esr-exl-test.in --> twist parameters (ratio of X/A and B/Y)
- M. Steck et al, Electron cooling experiments at the ESR, NIM A 532 (2004) 357-365 --> epsilon_x = 5·10^-7
|
Tue Jun 11 10:13:56 2019, Jan, Runs, prerun003 - MixedAlpha,
|
save point: lxg1275:/datalocal1/e127/predata/prerun004
~10min run
|
Fri Jun 7 14:39:36 2019, Jan, Detectors, Pt100 installation & readout,
|
The new detector holder incorporates a Pt100 temperature sensor, which is UHV compatible. The Pt-resistor is read out via 4 wires. These wires are integrated
into the D-SUB connector of the detector. The new wires use the pins as shown in the attached picture
"det_connector.png".
|
Fri Jun 7 14:28:09 2019, Jan, Runs, prerun003 - MixedAlpha,
|
save point: lxg1275:/datalocal1/e127/predata/prerun003
~20min run
|
Fri Jun 7 13:52:32 2019, Jan, Runs, prerun002 - MixedAlpha,
|
save point: lxg1275:/datalocal1/e127/predata/prerun002
~20min run
|
Fri Jun 7 10:18:23 2019, Jan, Runs, prerun001 - MixedAlpha,
|
save point: lxg1275:/datalocal1/e127/predata/prerun001-root
~2h run
|