  162  
 | 
Fri Apr  8 14:12:57 2022 | 
morning shift | DAQ | timing for h=1 | The timing for h=1 has been set up 
 
 
The time window is now twice as large as | 
    | 
| 
  121  
 | 
Thu Apr  7 02:32:29 2022 | 
all on shift | Runs | First Scans 322-320nm | Laser scanning from 322-320 steps 0.01nm/s
 
DAQ1: lxg1927:/data.local2/BeamTimeTh22/
 
DAQ2: lxg0155:/data.local2/E142/
 | 
   | 
| 
  166  
 | 
Fri Apr  8 15:39:36 2022 | 
all | Runs | first data after timing set up | started taking data again
 
 
started at 15:40  
 | 
   | 
| 
  75  
 | 
Sun Apr  3 10:35:20 2022 | 
Yuri (Sergey) | Accelerator | Dipole correction | The ramp for moving the beam to the central 
orbit
 
To be inserted into manipulation, GE01MU1 | 
   | 
| 
  74  
 | 
Sun Apr  3 10:28:25 2022 | 
Yuri (Helmut Weick) | Accelerator | Distance cooler - detector | Calculation from Helmut Weick
 
Distance e-cooler to particle detectors chamber:
 
“This is half of ESR plus distance target | 
   | 
| 
  131  
 | 
Thu Apr  7 08:14:03 2022 | 
Yuri & Danyal | General | 229Th89+ line in Schottky  | GLOBAL calculations for the "content" of the 
Th line in the Schottky spectrum
 
(380 MeV/u exit energy, equilibrium charge | 
   | 
| 
  68  
 | 
Sat Apr  2 18:17:31 2022 | 
Yuri | Accelerator | Photo-Identification | Just a photo of the ID | 
    | 
| 
  69  
 | 
Sat Apr  2 18:19:47 2022 | 
Yuri | Accelerator | Scraping |   | 
    | 
| 
  167  
 | 
Fri Apr  8 15:42:20 2022 | 
Yuri | Accelerator | Slits in the TE line | At around 15:00, The slits in the TE line 
were changed to :
 
TE4DS5HL -12 mm -> -20 mm
 | 
   | 
| 
  168  
 | 
Fri Apr  8 15:45:24 2022 | 
YL |   | Spectrum manipulation 5 | See attached | 
    | 
| 
  102  
 | 
Tue Apr  5 20:58:53 2022 | 
Wilfried | Laser | Trigger for Laser | Electronic for the timing of the laser puls 
optimized. The problem with the broad photodiode 
histograms is solved.
 | 
     | 
| 
  148  
 | 
Fri Apr  8 02:14:05 2022 | 
Wilfried | Laser | Laser timings adjusted  | Since we use the middle window as a reference 
for the laser pulse timing, the fact that 
the window is 2.25 m behind the target has | 
   | 
| 
  164  
 | 
Fri Apr  8 14:43:50 2022 | 
Wilfried | DAQ | laser timing - Q-switch start | below are my notes concerning laser timing 
/ Q-switch start | 
    | 
| 
  222  
 | 
Tue Apr 12 21:56:54 2022 | 
Volker, David, Pierre-Michel & Danyal, Alexandre, Sebastian | General | new laser wavelength scan range 321.62 - 321.10 nm | New wavelength scan range is [B]321.62 - 321.10 
nm[/B]. Before the new scan range (compare 
old scan range in [URL=https://elog.gsi.de/esr/E142/215] | 
     | 
| 
  30  
 | 
Wed Mar 23 16:16:42 2022 | 
V. Hannen | Detectors | Control software for XUV and copper mirror detector | Attached you find a manual for the software 
used to control the movement of the XUV detector 
and the copper mirror detector. 
 | 
    | 
| 
  31  
 | 
Wed Mar 23 16:58:33 2022 | 
V. Hannen | Detectors | Status copper mirror and XUV detectors | Over the past days, the parabolic copper mirror 
and XUV detectors haven been prepared and 
tested for the upcoming beamtime (see first | 
      | 
| 
  150  
 | 
Fri Apr  8 05:46:35 2022 | 
V. Hannen | Detectors | High background rate in Cu PMT points to light leak in ESR or active pressure gauge | The background rate of the Cu mirror PMT is 
only about 300 cps when the mirror is in 
the parking position but ca. 7000 cps when | 
   | 
| 
  191  
 | 
Sun Apr 10 03:56:56 2022 | 
V. Hannen | Detectors | Low rate in PMT South | PMT south shows a much lower count rate than 
observed in elog entry 170.
 
 | 
    | 
| 
  119  
 | 
Thu Apr  7 00:36:36 2022 | 
Uwe | DAQ | Threshholds and shaping Mesytec for ADC |   | 
    | 
| 
  111  
 | 
Wed Apr  6 15:19:29 2022 | 
Svea, Shahab | Accelerator | 5s delay implemented before injection | Operators have informed us that for better 
stability and operation (and cooperation 
with HHT), and after discussing with Sergey, | 
   |